# AI for DELMIA Ortems: Explaining Plans and Reconciling with the ERP

> Source: https://netray.co/erp-ai/delmia-ortems-ai-integration
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: AI for ERP

## Short answer

AI for DELMIA Ortems adds a private assistant beside the planning and scheduling tool, so planners can ask why an order is late, which resource or material drove it, and how the plan compares with ERP records. It reads through governed, read-only connectors and does not replace the scheduling engine or release process.

## Kind

platform

## Erp Family

mfg-systems

## Erp Products

- DELMIA Ortems

## Industries

- Manufacturing
- Aerospace
- Food and Beverage
- Process Manufacturing

## Region

Global

## Persona

Production Planner

## Eyebrow

DELMIA Ortems + private AI

## Intro

DELMIA Ortems is Dassault Systemes' planning and scheduling product for finite-capacity scheduling in discrete and process plants. It sits between the ERP and the shop floor, taking orders, routings, stock and calendars from the ERP and producing a sequenced plan that respects capacity, materials and other constraints. Some sites use it alongside other DELMIA or 3DEXPERIENCE components, others run it as a standalone planning layer.

As with any APS, the difficulty lies in explaining and trusting the result. Planners must justify a date to a customer, explain a change to a plant manager, and notice when the plan and the ERP disagree. Doing this means reading Ortems resource definitions, constraint settings and the ERP data feeding it, often across several screens and exports.

Ortems provides its own visualization and reporting, which many plants use effectively. A private AI layer is worth considering when questions cross systems, when documentation of the model is thin, and when order and customer data cannot go to a public AI service, which is common in aerospace and defense supply chains.

The sections below describe how AI connects to an Ortems estate, what it does well, and where the product already suffices. The assistant explains and proposes; the planner remains the decision-maker and Ortems remains the scheduler.

## Pain Points

### Explaining plan changes

**Detail:** After each recalculation, planners must tell sales and production what moved and why, usually by assembling evidence from several views.

### ERP and plan divergence

**Detail:** Order changes in the ERP between synchronizations leave the plan out of step, and spotting every difference by hand is slow.

### Thin model documentation

**Detail:** Resource groups, constraints and rules were configured during the project, and the reasoning is rarely written down.

### Material and capacity interplay

**Detail:** A delay may come from a late component, a limited resource or both. Separating them takes cross-checking schedule and purchasing data.

### Restricted data

**Detail:** Aerospace and defense customers often restrict where order and program data may be processed.

## Use Cases

### Late order root cause

**Description:** For each late order, state in plain language whether capacity, material, calendar or priority drove the delay, with supporting figures.

**Erp Objects:** Orders, Operations, Resources, Calendars, ERP stock and purchase orders

**Outcome:** Gives customer-facing teams a clear reason and a more reliable date.

### Plan to ERP reconciliation

**Description:** Compare ERP production orders with those loaded in the planning tool and list differences in quantity, dates or routing.

**Erp Objects:** ERP production orders, routings, planning orders, interface tables

**Outcome:** Finds interface problems earlier and keeps plan and ERP aligned.

### Recalculation change summary

**Description:** After a recalculation, summarize the largest changes in start dates, sequence and resource load against the prior plan.

**Erp Objects:** Plan versions, Operations, Resources

**Outcome:** Replaces manual comparison before the daily planning meeting with a reviewable summary.

### Model documentation

**Description:** Read resource, constraint and rule definitions and produce a searchable description of how the plant is modeled.

**Erp Objects:** Resource definitions, constraints, calendars, rules

**Outcome:** Reduces dependency on a single expert and supports reviews and upgrades.

### Capacity scenario summaries

**Description:** Describe how added shifts, outages or priority changes alter late orders and loads across plan copies.

**Erp Objects:** Calendars, Resources, plan scenarios

**Outcome:** Supports faster, better-evidenced capacity decisions.

### Shortage-driven prioritization

**Description:** List planned orders blocked by missing materials with linked purchase orders and promise dates.

**Erp Objects:** BoM, stock, purchase orders, planned operations

**Outcome:** Aligns buyers with the items that gate the plan.

### Floor Q&A

**Description:** Supervisors ask what is next on a resource and what it depends on, answered from the plan and ERP status.

**Erp Objects:** Dispatch lists, work centers, ERP order status

**Outcome:** Reduces routine interruptions to planners.

## Architecture

**Overview:** The assistant reads plan data and ERP data through governed, read-only connectors. It explains and drafts; DELMIA Ortems does the scheduling and releases remain a planner action.

**Layers:**

#### Ortems and ERP connectors

**Detail:** Reads planning data through Ortems database or export interfaces and ERP data through APIs or SQL views using scoped read-only accounts.

#### Semantic layer

**Detail:** Maps orders, operations, resources and constraints, including site-specific attributes, to planner terminology.

#### Model serving

**Detail:** Open-weight models served with vLLM or Ollama on customer hardware or a private cloud.

#### Retrieval and agents

**Detail:** Retrieval over live data and model documentation; proposals are drafts for planners to apply.

#### Governance and audit

**Detail:** Per-user logging of questions, queries and answers, held inside your environment.

## Deployment Options

### Air-gapped on-prem

**Fit:** Aerospace and defense suppliers with strict data rules.

**Detail:** All components run on site with no outbound path.

### Private or sovereign cloud

**Fit:** Sites with planning and ERP workloads in their own cloud tenant.

**Detail:** Deployed in the same region and network boundary as the source systems.

### Hybrid

**Fit:** Groups with several plants and different ERPs.

**Detail:** Central governance, local connectors, data stays in place.

## Compliance

### Keeping model and data in infrastructure you control lets you apply your own access rules to controlled program data.

**Framework:** ITAR / EAR data handling

### Logged and reproducible explanations support control of planning information in audits.

**Framework:** AS9100 planning records

### Order and program data is not sent to public AI services.

**Framework:** Customer flow-down and NDA terms

### Personal data stays within infrastructure and region you control.

**Framework:** GDPR and regional privacy

## Integration Notes

- Ortems exchanges orders, items and stock with the ERP through interface tables, files or middleware; use the same staging data as the source for the assistant.
- Use read-only database roles for plan data; the assistant must not be able to recalculate or release plans.
- If Ortems is part of a wider DELMIA or 3DEXPERIENCE deployment, confirm which data actually lives in Ortems and which in other components.
- Index calendars and resource groupings, since many questions concern capacity assumptions.
- ERP reads use documented APIs or read replicas, keeping role rules in force.
- Where an MES or shop-floor system provides confirmations, read them to compare plan with actuals.
- Test against your Ortems release and re-test at upgrade.

## Product Fit

### ERPray

**Why:** Grounded questions and dashboards over ERP orders, stock and purchasing alongside plan snapshots.

### DataRay

**Why:** Suited when plan exports, model documents and ERP data must be queried together on-prem.

### Custom build

**Why:** Recalculation summaries and reconciliation agents depend on your model and are usually bespoke.

## Engagement

### Discovery

**Duration:** 2-4 weeks

**Deliverables:**

- Inventory of Ortems release, interfaces and data stores
- Prioritized planner questions
- Security review
- Deployment recommendation

### Pilot

**Duration:** 6-8 weeks

**Deliverables:**

- Read-only connectors on non-production data
- Late-order and reconciliation use cases live
- Accuracy review with planners
- Logging validated

### Production

**Duration:** 4-6 weeks

**Deliverables:**

- Production cutover with scoped accounts
- Runbook for new questions
- Planner training
- Audit review process

### Scale

**Duration:** Ongoing

**Deliverables:**

- More plants and ERPs
- Draft-action workflows
- Model refresh
- Quarterly accuracy review

## Buyer Questions

- Does the assistant ever recalculate or release a plan?
- Which Ortems interfaces and data stores does it read?
- How are our constraints and calendars represented in answers?
- Where does the model run and what leaves our network?
- How is accuracy checked against planner investigations?
- How does it reconcile with our ERP, and with what accounts?
- What is the upgrade plan for Ortems and the ERP?
- What do we keep if we end the engagement?

## Faq

### Does AI replace DELMIA Ortems?

**Answer:** No. Ortems remains the planning and scheduling engine. The AI layer explains results, reconciles plan and ERP data, and drafts proposals. Planners still decide, recalculate and release plans through the normal process.

### Do we need AI if Ortems already reports well?

**Answer:** Perhaps not. Built-in views cover many needs. The AI layer helps with explanatory and cross-system questions, such as why an order is late given ERP stock, and with documenting the model.

### Can it work with other DELMIA products?

**Answer:** Possibly, depending on which components hold the data and what interfaces they expose. Discovery maps the actual landscape first and confirms what can be read safely.

### How does it connect to the ERP?

**Answer:** Through documented APIs, SQL views or a read replica with a scoped read-only account, so the ERP's roles still apply.

### Is our data protected for defense work?

**Answer:** Model and data run on infrastructure you control, so program data is not sent to a public AI service. Your own compliance obligations remain yours, and the design helps you meet them.

### Can it suggest schedule changes?

**Answer:** It can draft proposals, such as moving a priority, for a planner to evaluate. Applying a change and releasing a plan stay with the planner in Ortems.

### How long does a pilot take?

**Answer:** Typically two to four weeks of discovery and six to eight weeks of pilot, longer with several plants or complex interfaces.

## Search terms

DELMIA Ortems AI, Ortems integration, DELMIA Ortems ERP integration, Ortems finite capacity scheduling, AI for APS, Dassault scheduling AI, Ortems SAP integration, private AI production planning, Ortems on-prem AI, DELMIA planning and scheduling, plan versus ERP reconciliation, Ortems late order analysis

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
