# Dynamics 365 AI Demo and Proof of Concept: Testing AI on Your Own Data in 30 Days

> Source: https://netray.co/erp-ai/dynamics-365-ai-proof-of-concept
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: AI for ERP

## Short answer

A useful Dynamics 365 AI demo runs on a copy of your own data, not a vendor demo company. Set up a sandbox, pick two or three concrete questions or tasks, build a test set with known answers, define pass criteria and measure accuracy, time saved and cost. Thirty days is enough to decide whether to proceed.

## Kind

buyer-guide

## Erp Family

microsoft

## Erp Products

- Dynamics 365 Finance
- Dynamics 365 Supply Chain Management
- Dynamics 365 Business Central

## Industries

- Manufacturing
- Distribution
- Aerospace
- Electronics

## Region

Global

## Persona

IT Director

## Eyebrow

D365 AI proof of concept

## Intro

Vendor demos of AI on Dynamics usually run in the Contoso demo company, where data is clean, item numbers are tidy and every question has an answer. They show what the product can do, not what it will do with your chart of accounts, your item master and your twenty years of free-text notes. Decisions made on demo data tend to disappoint in production.

A proof of concept on your own data closes that gap quickly. Microsoft makes this practical: Finance and Operations sandboxes can be refreshed from production, Business Central sandboxes can be created as copies, and Copilot features can be enabled in a sandbox before production. Private AI can be pointed at the same sandbox through its APIs.

The discipline is in the design. Pick questions people really ask, collect the right answers before the test, decide what counts as success, and measure. Without that, a POC becomes another demo, and everyone remembers the one impressive answer rather than the ten wrong ones.

This page gives a 30-day plan for a Dynamics 365 AI proof of concept that produces a decision, whether you are testing Microsoft Copilot, a Copilot Studio agent, a partner product or a private AI layer, including ours.

## Pain Points

### Demo data hides real problems

**Detail:** Clean demo companies make every AI look good; real data quality issues appear only in production.

### No agreed success criteria

**Detail:** Without pass criteria set in advance, POCs end with opinions instead of decisions.

### Security shortcuts during testing

**Detail:** POCs run under admin accounts, so they never test whether the AI respects roles.

### Cost ignored until later

**Detail:** Consumption and hardware costs are not measured during the POC, so the business case is guesswork.

### POC drift

**Detail:** Scope grows during the test, and the POC never finishes.

## Use Cases

### Natural-language questions over ERP data

**Description:** Test 30-50 real questions from finance, planning and sales against a sandbox, with known answers prepared by experts.

**Erp Objects:** F&O sandbox copy of production; Business Central sandbox; key tables for chosen questions

**Outcome:** A measured accuracy rate by question type, not an impression.

### Document extraction to drafts

**Description:** Run a month of real vendor invoices or customer POs through extraction and compare with what was keyed.

**Erp Objects:** Pending vendor invoices, sales order drafts in sandbox

**Outcome:** Field-level accuracy and review time per document.

### Agent task trial

**Description:** Run one agent task, such as collections preparation or planned order triage, on sandbox data with reviewers scoring output.

**Erp Objects:** Customer aging, planned orders, agent security role

**Outcome:** Reviewer scores and time saved per task.

### Role and permission test

**Description:** Ask questions as users in different roles and legal entities to confirm the AI only returns permitted data.

**Erp Objects:** Security roles, data area and organisation restrictions

**Outcome:** Evidence for the security review.

### Copilot versus custom comparison

**Description:** Run the same questions through Microsoft Copilot and an alternative to compare results fairly.

**Erp Objects:** Copilot features in sandbox, alternative AI layer

**Outcome:** A fair basis for build or buy.

### Cost measurement

**Description:** Measure capacity consumption or GPU usage for the test workload and project to production volumes.

**Erp Objects:** Power Platform capacity reports, GPU utilisation logs

**Outcome:** A cost per question or task to use in the business case.

### Latency and load check

**Description:** Measure response times and API load on the sandbox to anticipate production impact.

**Erp Objects:** OData and API call logs, sandbox performance metrics

**Outcome:** Confidence that AI will not slow down ERP users.

## Architecture

**Overview:** The POC architecture mirrors production at small scale: a sandbox copy of data, a scoped identity, the AI layer under test, a test harness and logging. Nothing writes to production.

**Layers:**

#### Sandbox data

**Detail:** F&O sandbox refreshed from production or a Business Central sandbox copy, with sensitive data masked where required.

#### Scoped identity

**Detail:** Entra ID app registrations and roles matching intended production design.

#### AI layer under test

**Detail:** Copilot, a Copilot Studio agent, a partner product or a private model on a test GPU server.

#### Test harness

**Detail:** A list of questions or tasks with expected answers, scored automatically where possible and by reviewers otherwise.

#### Logging

**Detail:** Prompts, queries, responses, latency and cost captured for analysis.

## Deployment Options

### Microsoft features in sandbox

**Fit:** Testing Copilot and first-party agents.

**Detail:** Enable features in a sandbox environment and run the test set.

### Partner or private AI against sandbox

**Fit:** Testing alternatives to Copilot.

**Detail:** Connect through APIs with a scoped identity; a single GPU server is enough for a private POC.

### Air-gapped POC

**Fit:** Defense and regulated sites.

**Detail:** Hardware and models delivered on site; no external connectivity required.

## Compliance

### Mask personal data in sandboxes where required by policy before AI testing.

**Framework:** Data masking and privacy

### If production data includes controlled data, the sandbox inherits the same controls; use private or authorised AI only.

**Framework:** ITAR and CUI

### POC runs in sandbox with no production writes, keeping financial controls untouched.

**Framework:** SOX

### The POC produces evidence on access control and logging for the security review.

**Framework:** Vendor security review

## Integration Notes

- Refresh the F&O sandbox from production through Lifecycle Services or the Power Platform admin center as your environment allows.
- Create Business Central sandboxes as copies of production from the admin center.
- Prepare expected answers before testing; do not let the AI's output define the answer key.
- Include ambiguous and impossible questions to test whether the AI admits uncertainty.
- Run tests as non-admin users in at least two roles.
- Fix scope at the start and keep a parking lot for new ideas.

## Product Fit

### ERPray

**Why:** Can be pointed at a Dynamics sandbox for a time-boxed POC with your questions, showing queries and respecting roles, on-prem if needed.

### Custom build

**Why:** When the POC targets a bespoke agent or private model for a specific process.

## Engagement

### Week 1: setup

**Duration:** 1 week

**Deliverables:**

- Sandbox ready
- Identities and roles
- Use cases and test set
- Success criteria signed off

### Week 2: build

**Duration:** 1 week

**Deliverables:**

- AI layer connected
- Semantic mapping for chosen questions
- Harness running
- First results

### Week 3: test

**Duration:** 1 week

**Deliverables:**

- Full test run
- Role tests
- Reviewer scoring
- Cost and latency measurement

### Week 4: decide

**Duration:** 1 week

**Deliverables:**

- Results report
- Cost projection
- Risks
- Go or no-go recommendation

## Buyer Questions

- Will the POC run on our data in our sandbox, not a demo company?
- Who prepares the expected answers, and when?
- What accuracy and time-saving thresholds define success?
- How will role-based access be tested?
- What will production cost at our volumes based on POC measurements?
- What do we keep if we do not proceed?

## Faq

### How do I get a Dynamics 365 AI demo on my own data?

**Answer:** Ask the vendor or partner to connect to a sandbox copy of your environment instead of a demo company. Provide 30-50 real questions or tasks with expected answers, agree success criteria and run the test under realistic user roles. A sandbox refresh from production makes this straightforward for both Finance and Operations and Business Central.

### How long should a Dynamics 365 AI POC take?

**Answer:** About four weeks is enough for a focused proof of concept: one week to set up, one to build, one to test and one to analyse and decide. Longer POCs tend to drift in scope without producing better decisions.

### What success criteria should we use?

**Answer:** Accuracy on a prepared test set by question type, time saved per task measured against the current process, correct enforcement of roles, acceptable response times and a cost per question or task that fits the business case. Set thresholds before testing starts.

### Can we test Copilot in a sandbox?

**Answer:** Many Copilot features can be enabled in sandbox environments, which is the right place to test them on your data before production. Check Microsoft's documentation for feature-specific requirements and regional availability.

### Do we need GPUs for a private AI POC?

**Answer:** A single server with one or two modern data centre GPUs is usually enough to run an open-weight model for a POC with a few users. Some vendors supply loan hardware for on-site POCs.

### What if the POC fails?

**Answer:** A POC that fails clearly is a good outcome: it saves a larger investment. Keep the test set, results and data quality findings; they are useful for the next attempt or for fixing data issues that affect reporting anyway.

### Should we compare Copilot with alternatives in the same POC?

**Answer:** If budget allows, yes. Running the same test set through Copilot and an alternative gives a fair comparison. Often Copilot is enough for some questions and an alternative wins on others, which supports a mixed approach.

## Search terms

demo dynamics ai, dynamics 365 ai demo, dynamics 365 ai proof of concept, dynamics 365 copilot pilot, business central ai demo, d365 ai poc, test copilot on own data, dynamics 365 ai pilot plan, dynamics ai sandbox test, erp ai proof of concept dynamics

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
