# Epicor Kinetic AI for Aerospace and Defense Suppliers: Traceability, Quality and CUI, On-Prem

> Source: https://netray.co/erp-ai/epicor-kinetic-aerospace-defense-ai
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: AI for ERP

## Short answer

Aerospace and defense suppliers on Epicor Kinetic can use AI for traceability questions, AS9100 quality and NCR analysis, first article preparation and job cost explanation, but controlled data usually rules out cloud AI. A private model on site, reading Kinetic through BAQs and REST v2 inside your CMMC boundary, keeps ITAR and CUI data under your control.

## Kind

industry

## Erp Family

epicor

## Erp Products

- Epicor Kinetic
- Epicor ERP 10

## Industries

- Aerospace
- Defense

## Region

United States

## Persona

VP Operations

## Eyebrow

Kinetic AI for A&D

## Intro

Many aerospace and defense suppliers, machine shops, sheet metal fabricators, electronics and composite builders, run Epicor Kinetic or Epicor 10 because it fits job-shop and make-to-order work. Their AI questions are similar to other manufacturers, but their constraints are not: ITAR and EAR, DFARS 252.204-7012, CMMC Level 2, AS9100 and customer flow-downs.

Those constraints make cloud AI features difficult. Part numbers, drawings, specifications and program details in Kinetic records can be technical data or CUI. Sending them to a vendor's cloud AI may be outside your assessed boundary or export authorisations. That does not mean no AI; it means AI that runs where your data already lives.

The use cases are concrete. Quality managers want to find patterns across NCRs and corrective actions. Program managers want to explain job cost overruns. Inspectors want quick access to customer quality clauses and first article history. Buyers want supplier performance for approved vendor lists. All of this lives in Kinetic and adjacent documents.

A private model on site, inside the same enclave as your Kinetic servers, can do this with read-only access, showing its queries, respecting security groups and logging everything. This page outlines that approach and the honest limits.

## Pain Points

### Cloud AI conflicts with controlled data

**Detail:** Technical data and CUI in Kinetic records make vendor cloud AI features risky for ITAR, EAR and CMMC obligations.

### Traceability questions take hours

**Detail:** Answering which serials or lots went into a shipment, or where a suspect material was used, requires several BAQs and manual joins.

### NCR patterns hidden

**Detail:** Recurring defects across parts, work centres and suppliers are hard to see in individual NCR records.

### Customer quality clauses scattered

**Detail:** Flow-down requirements live in PO text, quality clauses and documents, and inspectors struggle to find them.

### Job cost overruns explained late

**Detail:** Program managers learn about overruns at job close, too late for corrective action.

## Use Cases

### Lot and serial trace questions

**Description:** Ask which lots or serials went into a shipment or job, and where a suspect material lot was consumed.

**Erp Objects:** Erp.PartLot, Erp.SerialNo, Erp.PartTran, Erp.JobMtl, Erp.ShipDtl

**Outcome:** Trace answers in minutes with the query shown.

### NCR and corrective action patterns

**Description:** Summarise recurring defects by part, work centre and supplier across NCRs and DMRs.

**Erp Objects:** Erp.NonConf, Erp.DMRHead, Erp.DMRActn, Erp.Vendor

**Outcome:** Earlier identification of systemic issues.

### Customer quality clause lookup

**Description:** Retrieve flow-down clauses from PO text and quality documents for a given order.

**Erp Objects:** Erp.OrderHed comments, quality clause documents

**Outcome:** Inspectors see requirements before inspection.

### First article preparation support

**Description:** Gather part revision, routing and prior inspection history for AS9102 first article packages.

**Erp Objects:** Erp.PartRev, Erp.JobOper, inspection records

**Outcome:** Less time assembling FAI inputs; quality still signs.

### Job cost overrun explanation

**Description:** Explain variances by operation, labor and material for program managers.

**Erp Objects:** Erp.JobHead, Erp.JobOper, Erp.LaborDtl, Erp.JobMtl

**Outcome:** Earlier corrective action on overruns.

### Supplier performance for AVL

**Description:** Summarise supplier quality and delivery history for approved vendor list reviews.

**Erp Objects:** Erp.Vendor, Erp.RcvDtl, Erp.DMRHead, Erp.PORel

**Outcome:** Evidence-based AVL decisions.

### Counterfeit parts risk check

**Description:** Flag purchases of electronic parts from non-authorised sources for review.

**Erp Objects:** Erp.PODetail, Erp.Vendor, approved source lists

**Outcome:** Supports DFARS counterfeit parts controls.

## Architecture

**Overview:** Everything runs inside your controlled enclave: Kinetic, the model server and the retrieval index, with access through your existing identity and audit tooling.

**Layers:**

#### Kinetic in enclave

**Detail:** Kinetic or Epicor 10 servers inside your CMMC boundary.

#### Read-only connector

**Detail:** REST v2 and BAQs with scoped identities mirroring security groups.

#### Model server

**Detail:** Open-weight model on vLLM on a GPU server inside the same enclave, no outbound calls.

#### Retrieval

**Detail:** Index of quality documents, clauses and procedures, access-controlled.

#### Audit

**Detail:** Full logging integrated with your SIEM; US-person access controls where required.

## Deployment Options

### On-prem enclave

**Fit:** Suppliers with ITAR or CUI in Kinetic.

**Detail:** Model server alongside Kinetic in the enclave.

### Air-gapped

**Fit:** Classified-adjacent or highly restricted programs.

**Detail:** No network egress; model updates via controlled media.

### Private government cloud

**Fit:** Suppliers already hosting Kinetic in an authorised government cloud.

**Detail:** Model in the same authorised environment.

## Compliance

### Inference on site with access limited to authorised persons; the customer remains responsible for registration and licensing.

**Framework:** ITAR and EAR

### AI components inside the assessed boundary and documented in the SSP.

**Framework:** CMMC Level 2 and DFARS 252.204-7012

### AI supports quality records but does not replace sign-off; records remain in Kinetic or QMS.

**Framework:** AS9100

### Risk flags support but do not replace your counterfeit avoidance procedures.

**Framework:** DFARS counterfeit parts

### Access control, audit and configuration management controls applied to AI components.

**Framework:** NIST SP 800-171

## Integration Notes

- Keep the model server in the same network segment as Kinetic with no internet egress.
- Use scoped service identities per role, never a shared admin account.
- Exclude controlled drawings from retrieval unless access controls match their markings.
- Log prompts and responses to your SIEM with retention matching your policy.
- Coordinate with your Epicor partner before adding UD tables for predictions or flags.
- If Kinetic is Epicor-hosted, confirm hosting terms for controlled data before any AI work.

## Product Fit

### ERPray

**Why:** Read-only traceability, quality and cost questions over Kinetic, deployable inside your enclave.

### DataRay

**Why:** Joins Kinetic with quality documents and clause libraries.

## Engagement

### Boundary review

**Duration:** 2 weeks

**Deliverables:**

- Data classification
- Enclave architecture
- SSP impact notes

### Pilot

**Duration:** 4-6 weeks

**Deliverables:**

- Trace and NCR questions
- Audit integration
- Accuracy tests

### Expand

**Duration:** 4 weeks

**Deliverables:**

- Quality clause retrieval
- Job cost explanation
- Role-based access

### Operate

**Duration:** Ongoing

**Deliverables:**

- Model update process via controlled media
- Quarterly access reviews
- Usage reporting

## Buyer Questions

- Does any part of the AI system send data outside our enclave?
- How is access restricted to authorised persons?
- How will the AI components be documented in our SSP?
- How are model updates delivered and verified?
- Can every answer show its source query?
- How are controlled drawings handled in retrieval?

## Faq

### Can aerospace suppliers use Epicor Prism?

**Answer:** Prism runs in Epicor's cloud. For non-controlled data and use cases, it may be fine. For technical data or CUI, confirm hosting and personnel access with Epicor and your compliance team; many suppliers keep those use cases on a private on-prem layer.

### Does Epicor Kinetic support AS9100 traceability?

**Answer:** Kinetic has lot and serial tracking, job traceability and quality objects that many AS9100 suppliers use. AI makes those records easier to query, but the quality system remains your responsibility.

### Can AI help with AS9102 first articles?

**Answer:** Yes, by gathering part revision, routing and inspection history into a draft package. Quality staff still verify and sign. AI should not create inspection results.

### Is a private model enough for CMMC?

**Answer:** A private model inside your assessed boundary can be documented in your SSP like other components. CMMC compliance depends on your full set of controls; AI is one component within them.

### Does Netray hold ITAR registration or CMMC certification?

**Answer:** No. Netray does not claim ITAR registration or CMMC certification. The architecture lets you keep AI inside your own boundary so you meet your obligations.

### What hardware is needed?

**Answer:** Typically one GPU server for a mid-sized supplier, sized to user count and model choice. Air-gapped sites need a controlled update process.

### How long does a pilot take?

**Answer:** Around six to eight weeks including boundary review, trace and NCR use cases, audit integration and accuracy testing.

## Search terms

epicor industrial ai aerospace defense, epicor kinetic ai features aerospace defense, epicor aerospace and defense industrial ai, epicor erp company aerospace and defense industrial ai, epicor kinetic aerospace, epicor ai itar, epicor kinetic cmmc ai, epicor as9100 ai, epicor defense contractor ai, on-prem ai epicor kinetic aerospace

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
