# Infor AI Data Requirements: Getting LN, M3 and SyteLine Data Ready for AI

> Source: https://netray.co/erp-ai/infor-cloudsuite-ai-data-readiness
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: AI for ERP

## Short answer

Infor AI needs three things from your data: a path the AI can use (Infor Data Lake populated through ION for CloudSuite features, or ION APIs, BDEs, MI programs and IDOs for live access), master data clean enough to trust (items, sites, customers, suppliers), and agreed definitions for key metrics. Coleman and Infor GenAI depend heavily on Data Lake coverage; private AI can read live data directly.

## Kind

use-case

## Erp Family

infor

## Erp Products

- Infor CloudSuite
- Infor LN
- Infor M3
- Infor CloudSuite Industrial (CSI)
- Infor Data Lake

## Industries

- Manufacturing
- Aerospace
- Industrial Machinery
- Distribution

## Region

Global

## Persona

Enterprise Architect

## Eyebrow

Infor AI readiness

## Intro

Infor's AI features run on Infor OS, and many of them read from Infor Data Lake. Data reaches the lake through ION, usually as Business Object Documents published by the ERP, and becomes queryable through Compass. If the objects you need are not flowing, the AI cannot see them. Checking Data Lake coverage is the first step for any CloudSuite customer evaluating Coleman, Infor GenAI or industry agents.

On-premises LN, M3 and SyteLine sites often have little or no Data Lake usage. For them, AI reads live data through the ERP's own interfaces: LN business data entities and tables such as tdsls400 for sales orders and tcibd001 for items, M3 MI programs and tables such as MITMAS and OOHEAD, and SyteLine IDOs. That works well for assistants and agents, but it puts the burden of definitions and security on the AI layer.

In both cases, master data quality decides answer quality. Item masters duplicated across sites, inconsistent units of measure, outdated lead times and suppliers set up several times make demand, supply and cost answers unreliable, however capable the model.

This page lists what to check for each Infor ERP, how to prioritize fixes around the questions you actually want answered, and how to measure readiness before rolling out AI.

## Pain Points

### Data Lake coverage gaps

**Detail:** Key BODs are not published or are filtered, so CloudSuite AI features lack the objects they need.

### Multi-site item master drift

**Detail:** Items set up differently per site in LN or M3 break cross-site supply and cost answers.

### Stale planning parameters

**Detail:** Lead times, order policies and safety stocks not maintained make planning explanations misleading.

### Custom extensions undocumented

**Detail:** LN extensions, M3 modifications and SyteLine customizations add fields and logic that AI must be told about.

### Security mapping

**Detail:** Infor roles and authorizations must carry over to AI access, which is often not designed.

## Use Cases

### Data Lake coverage audit

**Description:** List BODs and objects in Data Lake against the data needed for priority AI questions.

**Erp Objects:** ION Desk document flows, Data Lake objects, Compass queries

**Outcome:** A clear list of flows to add before CloudSuite AI.

### LN item and site profiling

**Description:** Profile items across sites for inconsistent settings.

**Erp Objects:** tcibd001 item general, item-site data, warehouse settings

**Outcome:** Cleaner cross-site answers.

### M3 master data profiling

**Description:** Check item master and balance data for gaps.

**Erp Objects:** MITMAS item master, MITBAL item balance, OOHEAD and OOLINE orders

**Outcome:** Reliable stock and order answers.

### SyteLine IDO mapping

**Description:** Map priority questions to standard and custom IDOs and properties.

**Erp Objects:** SLItems, SLCoitems, SLJobs, custom IDOs

**Outcome:** Tools that reflect customizations.

### Planning parameter review

**Description:** Flag lead times and order policies that differ widely from actuals.

**Erp Objects:** Item planning data, purchase receipts history

**Outcome:** More trustworthy shortage explanations.

### Supplier and customer duplicates

**Description:** Detect duplicates across companies and sites.

**Erp Objects:** Business partners in LN, supplier and customer masters in M3 and CSI

**Outcome:** Complete history for AI answers.

### Role mapping

**Description:** Map Infor security roles to AI tool access.

**Erp Objects:** Infor OS roles, LN authorizations, M3 roles, SyteLine groups

**Outcome:** AI respects existing access rules.

## Architecture

**Overview:** Two readiness tracks: Data Lake coverage for Infor's own AI on CloudSuite, and live interface access for private AI on-prem. Both share master data fixes and definitions.

**Layers:**

#### ERP sources

**Detail:** LN, M3 and SyteLine data with customizations.

#### Infor OS and Data Lake

**Detail:** ION flows and BODs into Data Lake for CloudSuite AI.

#### Live interfaces

**Detail:** ION API Gateway, LN BDEs, M3 MI programs and SyteLine IDOs.

#### Definitions and master data

**Detail:** Glossary and cleaned master data behind priority questions.

#### Evaluation

**Detail:** Question set with expected answers.

## Deployment Options

### CloudSuite with Data Lake

**Fit:** Multi-tenant CloudSuite customers

**Detail:** Close Data Lake gaps, then adopt Infor AI.

### On-prem live access

**Fit:** On-prem LN, M3 and SyteLine

**Detail:** Private AI over live interfaces with definitions in the AI layer.

### Hybrid

**Fit:** Mixed estates

**Detail:** Data Lake for analytics, live interfaces for operational questions.

## Compliance

### Controlled data stays in environments you control; flows filtered accordingly.

**Framework:** ITAR

### Minimize personal data in flows and AI access.

**Framework:** GDPR

### Master data changes under change control.

**Framework:** SOX

### Keep CUI flows inside the assessed boundary.

**Framework:** CMMC

## Integration Notes

- Check which BODs your ERP publishes and whether filters exclude needed objects.
- Use Compass to verify Data Lake content against ERP screens for a sample of records.
- For on-prem LN, prefer BDEs and supported interfaces over direct table writes; reads from tables need a dedicated user.
- For M3, use MI programs through the ION API or M3 API for live reads.
- For SyteLine, use the IDO Request Service with a limited user.

## Product Fit

### ERPray

**Why:** Grounded answers over live LN, M3 and SyteLine data where Infor AI does not reach.

### SyteRay

**Why:** For SyteLine and CSI customization mapping and upgrade readiness.

### DataRay

**Why:** When Infor data must be combined with documents and other databases.

## Engagement

### Question inventory

**Duration:** 1 week

**Deliverables:**

- Priority questions
- Owners
- Data trace

### Coverage and profiling

**Duration:** 2 weeks

**Deliverables:**

- Data Lake coverage report
- Master data profile
- Customization map

### Fixes

**Duration:** 2-4 weeks

**Deliverables:**

- Added ION flows
- Master data corrections
- Glossary

### Validation

**Duration:** 1 week

**Deliverables:**

- Role mapping
- Evaluation set
- Readiness sign-off

## Buyer Questions

- Which objects must be in Data Lake for the AI features we want?
- Which questions need live data rather than the lake?
- How are multi-site item differences handled?
- How are our customizations described to the AI?
- How do Infor roles map to AI access?
- How do we measure readiness?

## Faq

### What data does Infor enterprise AI need?

**Answer:** For CloudSuite AI features, the relevant business objects must flow through ION into Infor Data Lake. For private AI, live access through ION APIs, LN BDEs, M3 MI programs or SyteLine IDOs. In both cases, master data and definitions behind priority questions must be reliable.

### Is Infor Data Lake required for AI?

**Answer:** For many of Infor's own AI features, effectively yes. For private AI over on-prem ERPs, no: it can read live data through the ERP's interfaces.

### How do we check Data Lake coverage?

**Answer:** List the objects your priority questions need, check ION document flows and Data Lake objects, and compare Compass query results to ERP screens for samples.

### What master data issues matter most?

**Answer:** Item setup across sites, units of measure, lead times and order policies, and duplicate business partners. These directly affect supply, cost and customer answers.

### Can AI read LN tables directly?

**Answer:** Read access to LN tables with a dedicated user is common for analytics and assistants. Writes should go through BDEs or supported interfaces so business logic applies.

### How long does readiness take?

**Answer:** Typically four to eight weeks for a focused set of questions, longer if many ION flows must be added.

### Does Baan need the same work?

**Answer:** Similar principles apply, with extra effort to document legacy customizations and table meanings before AI or migration.

## Search terms

infor enterprise ai data requirements, infor ai readiness, infor data lake ai, infor ion data for ai, infor cloudsuite ai data, infor ln data quality ai, infor m3 master data ai, infor coleman ai data requirements, infor genai data lake, prepare infor data for ai

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
