# Acumatica REST API 401 Unauthorized and API Login Limit: How to Fix

> Source: https://netray.co/erp-help/acumatica-rest-api-401-unauthorized-login-limit-fix
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

A 401 from the Acumatica contract-based REST API usually means the login call failed or the session cookie was not sent back, and an API login limit error means too many API sessions are open for your license. Post to /entity/auth/login with name, password and company, reuse the cookie, and always call /entity/auth/logout when done. For integrations, prefer OAuth 2.0 through a Connected Application.

## Kind

error

## System

small-erp

## Erp

Acumatica Cloud ERP

## Module

Integration / Contract-Based REST API

## Query

Acumatica REST API 401 unauthorized login

## Alternate Queries

- Acumatica API login limit exceeded
- Acumatica entity auth login 401
- Acumatica API session not logged out
- Acumatica OAuth connected application token

## Applies To

Acumatica Cloud ERP contract-based REST API (default endpoint and custom endpoints), cookie login and OAuth 2.0 flows, SaaS and on-premises

## Steps

### How to fix 401 and login-limit errors

**Items:**

- Confirm the base URL includes the instance path, for example https://host/Instance/entity/auth/login, not just the host name.
- POST JSON with name, password and company (the tenant or company login name, which must be exact when the instance has more than one tenant).
- Capture the Set-Cookie response and send it with every later call. Clients that drop cookies get 401 on the second request.
- Check the user is enabled, not locked, has a role with access to the entities you call, and that the account is not forced to change its password at next login.
- If the instance enforces two-factor authentication, an API user with password login will fail; use OAuth 2.0 with a Connected Application instead.
- Always call POST /entity/auth/logout in a finally block so sessions are released; unclosed sessions count against the API user limit until they time out.
- For a limit error, open the License Monitoring Console to see current API users and request rates, then add pooling, fewer parallel logins, or request a license tier change.
- In Connected Applications (SM303010), create the client, choose the flow, and verify the scope is api and the redirect URI matches exactly.

## Sections

### Cookie login that works

**Body:**

The classic login is a POST to /entity/auth/login with a JSON body. The response sets session cookies that carry the identity for the rest of the conversation. If you use a typed HTTP client, enable a cookie container and keep one client instance per session.

If your company name is wrong, the call returns an error that looks like a bad password. When a single tenant exists you may omit company, but with multiple tenants it is required.

**Code:**

POST https://host/Instance/entity/auth/login
Content-Type: application/json

{
  "name": "apiuser",
  "password": "********",
  "company": "Tenant1"
}

POST https://host/Instance/entity/auth/logout

### Why 401 appears after it worked

**Body:**

Sessions expire. Idle API sessions time out, and a long import can outlast the session. Handle a 401 by logging in again once and retrying, not by looping indefinitely.

Concurrency is the next cause. Acumatica ties API access to your license, which has limits on concurrent API users and requests per minute. Parallel workers each logging in with the same account can hit those limits; use one session per worker and reuse it.

Finally, role and endpoint issues. A user can authenticate but still be denied on an entity if the roles do not grant the screen behind it. That usually returns 403 or a screen access error rather than a login failure, so read the response body.

### OAuth 2.0 for integrations

**Body:**

For new integrations, register a Connected Application on SM303010. Pick the flow that matches the client: Authorization Code for interactive apps, Client Credentials for service to service where available in your version, or Resource Owner Password only for legacy cases.

Request the api scope, store the client secret outside the code, and refresh tokens before they expire. OAuth avoids sending the user password on each call and works with two-factor authenticated tenants.

## Pitfalls

- Forgetting to log out, which leaves sessions open and exhausts the API user limit.
- Using the host URL without the instance virtual directory.
- Sharing one integration account across many parallel workers and hitting concurrency or request limits.
- Hard coding a password for an account with two-factor authentication enabled.
- Retrying 401 in a tight loop, which can lock the account.

## Ai Angle

An AI assistant over Acumatica can read the response body, tell you whether it is a credentials, tenant name, role or limit problem, and show the exact call that works. For reporting questions, ERPray reads through the API in read-only mode with its own scoped account, so analysts are not sharing an integration login.

## Faq

### What does the company field in the login body mean?

**Answer:** It is the tenant or company login name chosen on the Acumatica sign-in screen, not the legal company name. On a single tenant instance it can be omitted, but on multi tenant instances a wrong value fails with a credentials style error.

### How many API sessions can I open?

**Answer:** It depends on your license. The License Monitoring Console shows the allowed concurrent API users and request rates. Plan integrations to reuse sessions and log out, and ask your Acumatica partner if you need a higher tier.

### Should I use OAuth or cookie login?

**Answer:** Use OAuth 2.0 through a Connected Application for new integrations, since it avoids password handling and works with two-factor authentication. Cookie login is fine for quick scripts and internal tools on a test tenant.

### Why do I get 401 only on the second call?

**Answer:** The client is not sending the session cookie back. Use an HTTP client with a cookie container, keep the same instance for the whole session, and do not strip cookies in proxies or API gateways.

## Search terms

acumatica rest api 401, acumatica api login limit, acumatica entity auth login, acumatica connected application oauth, acumatica SM303010, acumatica api logout, acumatica contract based api authentication, acumatica api session cookie

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
