# Epicor MRP Runs but Generates No Suggestions

> Source: https://netray.co/erp-help/epicor-mrp-not-generating-suggestions
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

When Epicor's MRP process completes without a job or purchase suggestion for a part you expect one for, the cause is almost always the part's own configuration (Part Class Type, Make Direct, Non-MRP flag, planning Time Fence) or the demand not being linked in a way MRP recognizes, not a defect in the MRP engine. Work through the part's Planning tab, its safety stock and lead time setup, and the demand source (sales order line status, job material requirement) before assuming the run itself failed.

## Kind

how-to

## System

epicor

## Erp

Epicor Kinetic / Epicor ERP 10

## Module

Material Requirements Planning

## Query

Epicor MRP not generating job or purchase suggestions

## Alternate Queries

- Epicor MRP run finishes but no suggestions
- Epicor regenerative MRP vs net change MRP not picking up demand
- Epicor part not showing on MRP action message
- Epicor MRP log how to read

## Applies To

Epicor ERP 10.1, 10.2, Epicor Kinetic, regenerative and net change MRP

## Steps

### Find why MRP skipped the part

**Items:**

Open the MRP Log (Material Planning > Scheduling > MRP, then the log/history for the last run) and search for the part number - a part that MRP evaluated but decided needs nothing will still appear here with a reason.

Check Part Master > Planning tab: confirm the Part Class Type is set correctly (Purchased, Manufactured, Purchased/Manufactured) and that Non-MRP Part is not checked - a Non-MRP part is deliberately excluded from every run.

Check whether Make Direct or Buy Direct is set on the part - direct parts generate suggestions tied to a specific sales order or job, not as general stock replenishment, so they will not show up the way a stocked item does.

Confirm the demand actually exists in a state MRP reads: an unapproved/unreleased sales order, a quote instead of an order, or a job material requirement on a job that is not engineered will not generate demand.

Check the part's Time Fence and Lead Time settings - if the required date falls inside a firm planning time fence, MRP may suppress a new suggestion rather than move existing firm supply.

Verify the part's Site and Warehouse match where the demand is recorded - MRP suggestions are site-specific, so demand in one site against supply/part setup in another will not connect.

Confirm you ran the correct scope - a Net Change run only evaluates parts flagged as changed since the last run; if the part was not touched, run a full Regenerative MRP to force a complete re-evaluation.

Check safety stock and minimum/maximum settings are not already satisfied by on-hand plus existing open supply, which is a legitimate reason for MRP to correctly generate nothing.

## Sections

### Regenerative vs Net Change MRP

**Body:**

Net Change MRP only re-plans parts Epicor has flagged as changed since the last run (new demand, changed due date, receipt, and similar events), which is fast but will silently skip a part if the change that should have flagged it did not register - a common case after direct database updates from an integration, or after a BPM-driven change that bypassed the normal transaction path.

Regenerative MRP re-evaluates every part from scratch and is the reliable way to confirm whether an apparent no-suggestion issue is a flagging problem (Net Change missed it) or a genuine configuration issue (the part correctly needs nothing).

### Part configuration that suppresses suggestions

**Body:**

Non-MRP Part removes the part from planning entirely - useful for expense items and non-stock parts, but a frequent accidental cause when someone copies a part master record without checking the flag. Make Direct and Buy Direct tie supply to a specific order line rather than creating general replenishment, so if you are expecting a stock-replenishment PO for a Buy Direct part, that is by design, not a bug.

The planning Time Fence exists to stop MRP from constantly rescheduling firm, near-term supply; it can also mean MRP declines to suggest new supply for demand that falls inside that fence, expecting a planner to handle it manually.

### Demand that MRP does not see

**Body:**

MRP reads demand from sources in a defined status - an approved and released sales order line, an engineered job's material requirement, a forecast record, or safety stock policy. A quote, an unapproved order, or a job still in "Unapproved" or "Unengineered" status will not create MRP demand even though it is visible elsewhere in the system, which is the single most common reason a part everyone can see has demand for still shows nothing on MRP.

### Reading the MRP log effectively

**Body:**

The MRP log records, per part, what supply and demand it found and what action (or no action) it took. Filtering the log to the part in question is far faster than re-running MRP repeatedly with small configuration changes - the log will usually state directly that the part is Non-MRP, direct-linked, or within its time fence, which points straight at the fix.

## Pitfalls

- Assuming a Net Change run's silence means the part needs nothing, when it may simply not have been flagged as changed.
- Changing part configuration in production to test a theory instead of confirming first in the MRP log or a test company.
- Forgetting MRP suggestions are site-specific and comparing demand recorded in one site against a part record reviewed in another.
- Not checking sales order or job approval status, since unapproved demand is invisible to MRP even though staff can see it on screen.
- Overlooking that Make Direct/Buy Direct parts are working as designed and do not need a stock-replenishment suggestion at all.
- Re-running MRP repeatedly without reading the log first, which wastes a full planning cycle on trial and error.

## Ai Angle

ERPray, grounded in the Epicor part master, MRP log and the linked sales order or job status, can answer "why did MRP not suggest a job for part X" directly - checking Non-MRP flag, Make Direct, time fence, and demand approval status in one pass instead of a planner working through the checklist manually across several Epicor screens. The MRP run itself and any resulting supply change still go through the normal planning and approval process.

## Faq

### Does a part need to be Approved before MRP will plan it?

**Answer:** The part master itself does not need a separate approval, but the demand driving the suggestion (sales order line, job material requirement) generally does need to be in an approved/released status. A part with no valid demand or below its reorder point with adequate on-hand can legitimately generate nothing.

### Why does MRP suggest a job for the wrong site?

**Answer:** Check the part's site-specific planning parameters and the site tied to the originating demand - MRP plans per site, so a part that is Non-MRP or has different lead times in one site than another will behave differently even with the same part number.

### Can a BPM directive interfere with MRP suggestion generation?

**Answer:** Indirectly, yes - if a directive blocks or alters the demand record (a sales order line update, a job engineering change) before MRP runs, the demand MRP sees can differ from what a user expects on screen. Check BPM directives on the demand-creating transaction if suggestions are missing only for certain order types or part classes.

### How do I force MRP to re-evaluate a single part quickly?

**Answer:** Most Epicor versions support running MRP scoped to a part class or a specific part range rather than the whole regenerative run, which is much faster for testing a single part's configuration without re-planning the entire site.

## Search terms

Epicor MRP no suggestions, Epicor MRP not generating jobs, Epicor regenerative MRP, Epicor net change MRP, Epicor Non-MRP part flag, Epicor Make Direct part, Epicor MRP log, Epicor time fence MRP, Epicor material planning troubleshooting, Epicor part planning tab

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json