# Infor LN Process Variables: Meaning, Setting and Inspecting

> Source: https://netray.co/erp-help/infor-ln-process-variables-bshell-set-inspect
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

Every Infor LN session runs inside a bshell process that carries environment variables (such as BSE, the installation root) and in-memory process variables used by the 4GL code. Developers read and set process variables from code, commonly with the 4GL calls get.var and put.var, and inspect environment values from the shell or bshell startup options. Check how your version exposes them before relying on one.

## Kind

advanced

## System

infor-ln

## Erp

Infor LN

## Module

Tools / bshell

## Query

infor ln process variables

## Alternate Queries

- infor ln bshell variables
- baan process variables get.var put.var
- infor ln bshell environment variables BSE

## Applies To

Infor LN 10.x and ERP LN 6.x, 4GL/3GL development and administration; verify function names in your tools documentation

## Steps

### How to inspect and set process variables

**Items:**

- Identify what you need: an operating system environment variable seen by bshell (such as BSE) or a variable inside a running session's 4GL code.
- For environment values, check the bshell start-up configuration and the user's shell or service environment on the application server.
- For in-session values, add a debug print or use the 4GL debugger to view the variable in the process you are testing.
- To read a variable from another process in code, use the documented get.var call with the process id and variable name.
- To change a variable in a running process from code, use put.var, and restrict this to tooling or approved customisations.
- Test in a development environment, then document the variable, its owner and its default.

## Sections

### Two kinds of variable

**Body:**

Environment variables are set by the operating system or the bshell start-up and describe the installation: where the software lives (BSE), temp locations and similar settings. They are read when the process starts and normally stay constant for its life.

Process variables are the 4GL variables inside a running session. They live in memory, differ per process and disappear when the session ends. They hold state such as the current company, the active record and form values.

### Reading and setting from code

**Body:**

The tools offer calls to read and set a named variable in a given process, so one session can inspect or influence another. This is powerful and should be used carefully: changing a variable in a running process can alter behaviour in ways the original author did not expect.

Keep any such use isolated in a documented library and avoid depending on internal variable names, which can change between versions.

**Code:**

- | Illustrative 4GL sketch: confirm exact signatures in your tools documentation
long rc
string val(100)
rc = get.var(pid, "some.variable", val)

### Troubleshooting differences per user or server

**Body:**

When a session behaves differently for one user or on one server, compare the environment of the bshell processes: different BSE values, different language settings or a different start-up script are common causes.

On Windows services versus interactive logons the environment can differ, so test with the same launch method as production.

## Pitfalls

- Depending on internal variable names that change between versions.
- Changing variables in a running process from production code without testing.
- Assuming a user's shell environment equals the service environment bshell actually runs under.
- Editing environment settings on one server and forgetting the others in the cluster.

## Ai Angle

Netray adds a private AI layer on top of the Infor LN you already run, including on-prem installs. ERPray answers questions in plain language over LN data read-only, shows the query it ran and respects LN roles, so a consultant can ask the question instead of hunting for the session. The model runs on your own GPUs, nothing leaves your network, and any write-back needs a human approval. Cloud-hosted LN works too, but the design is tuned for on-prem and air-gapped sites. For pure navigation questions, LN's own session search and help are often enough.

## Faq

### What is BSE in Infor LN?

**Answer:** BSE is the environment variable pointing to the root of the LN (Baan) software installation. Most tools resolve their paths from it.

### How do I read a variable from another session?

**Answer:** Developers use the get.var call with the process id and variable name. Check the signature and restrictions in your tools documentation before using it.

### Do process variables survive a session restart?

**Answer:** No. They live in the memory of the process and are lost when it ends. Persistent settings belong in parameters or tables.

### Why does LN behave differently on two servers?

**Answer:** Compare environment variables and start-up scripts of the bshell processes. Differences in BSE, language or temp paths are typical causes.

## Search terms

infor ln process variables, bshell variables, baan get.var put.var, infor ln BSE variable, infor ln bshell environment, baan 4gl variables, infor ln debugger, infor ln tools development

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
