# Infor M3 Allocation Table: MITALO Reference and Queries

> Source: https://netray.co/erp-help/infor-m3-allocation-table-mitalo-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

M3 records material and stock allocations in the allocation table, MITALO, one row per allocation of an item to a demand such as a customer order line or a manufacturing order material line. The allocated total is also summarised on the item-warehouse balance, which is why the two can disagree when something goes wrong.

## Kind

advanced

## System

infor-m3

## Erp

Infor M3

## Module

Inventory / Allocation (MITALO)

## Query

infor m3 allocation table

## Alternate Queries

- allocation table infor m3
- m3 MITALO table
- m3 which table holds allocations
- m3 allocated quantity item balance

## Applies To

Infor M3 Business Engine, on-prem database access or Data Fabric / reporting replicas. Column details vary by release, so confirm in your data dictionary.

## Steps

### Investigate allocations for an item

**Items:**

- Identify the item and warehouse in question, and the demand (order number and line) if you have it.
- Look at the allocation in the application first: open the demand line (customer order line, MO material line, or similar) and display the allocation or reservation information from it.
- For a database-level view, query MITALO filtered by company, warehouse and item number, and read the reference order category, order number and line columns to see what each row serves.
- Compare the sum of allocated quantity in MITALO to the allocated quantity on the item-warehouse balance. A difference points to a stuck or orphaned allocation.
- Check the demand document status. An allocation against a cancelled or fully delivered line should not exist.
- Use the standard re-allocation or deallocation function on the demand, not a direct update to MITALO.
- Re-run the comparison after the fix.

## Sections

### What MITALO represents

**Body:**

MITALO is the detail behind the allocated quantity you see on an item balance. Each row ties a quantity of an item in a warehouse (and, depending on settings, a lot, location or container) to a reference order: a customer order line, a distribution order, or a material line on a manufacturing order. The reference fields, order category, order number, line and sub-line, are how you join it back to the demand.

Because it is per demand line, it is the right table to answer which orders have a claim on this stock, and which order is blocking a shortage.

### Query pattern

**Body:**

Treat the SQL below as a pattern. Table and column names differ across M3 releases and database platforms, and the schema qualifier depends on your install. Use read-only access to a replica or reporting copy, never update M3 tables directly.

Group by the reference order category first to see where demand is coming from, then drill into one category.

**Code:**

- -- Pattern only: confirm column names in your data dictionary
- SELECT MQCONO, MQWHLO, MQITNO, MQRORC, MQRIDN, MQRIDL, MQALQT
- FROM MITALO
- WHERE MQCONO = 100 AND MQWHLO = 'A01' AND MQITNO = 'ITEM-123'
- ORDER BY MQRORC, MQRIDN, MQRIDL;

### Why allocated quantities disagree

**Body:**

Common causes are an order cancelled or changed through an interface that skipped the standard deallocation, an interrupted batch allocation job, a manual stock correction made while allocations existed, and customizations that touch the balance fields.

Fix these through the application: deallocate and reallocate from the demand line, or run the standard balance reconciliation functions that your M3 version offers. Direct database changes bypass M3 business rules and are not supportable.

## Pitfalls

- Updating MITALO or the balance directly in SQL. It bypasses business logic and can corrupt planning.
- Querying without company and warehouse and summing across different scopes.
- Assuming every allocation row is a hard reservation. Settings decide how and when allocation happens.
- Copying column names from another release without checking them.
- Ignoring lot and location allocation, which multiply rows per demand line.

## Ai Angle

This is a good question for a read-only data assistant: which orders hold the allocation on this item, and does it match the balance. ERPray-style querying over a replica shows the SQL, so the planner can verify it. Netray can host that on-prem next to the M3 database so no inventory data leaves your site.

## Faq

### Which M3 table holds the allocations?

**Answer:** MITALO, the allocation table. The summarised allocated quantity sits on the item-warehouse balance (MITBAL), and location level stock is in MITLOC.

### Can I delete rows from MITALO to free stock?

**Answer:** No. Use the application function to deallocate from the demand line. Direct deletes skip the balance updates and can leave the system inconsistent.

### Why is allocated quantity higher than on-hand?

**Answer:** Allocations can exist against expected receipts or be left over from a cancelled order. Compare each allocation's demand status and check the source of the stock being allocated.