# JobBOSS2 Data Collection: How Shop Floor Labor and Job Tracking Work

> Source: https://netray.co/erp-help/jobboss2-data-collection-shop-floor-labor-tracking
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

JobBOSS2 data collection means operators identify themselves and a job operation at a shop floor station, start and stop time against that operation, and report quantities completed. That transaction becomes actual labor and progress on the job, which feeds job costing, scheduling and WIP. Most posting problems come from an inactive employee, an operation that is closed or not released, or a station that is not set up for the job's work center.

## Kind

how-to

## System

job-shop-erp

## Erp

JobBOSS2 (ECI)

## Module

Shop Floor / Data Collection / Labor

## Query

jobboss2 data collection

## Alternate Queries

- jobboss2 shop floor data collection
- jobboss2 clock in clock out job
- jobboss2 labor not posting to job
- jobboss shop floor terminal vs mobile

## Applies To

JobBOSS2 (cloud and on-prem) and, in concept, classic JobBOSS and E2 shop floor tracking. Screen names differ slightly by build, so confirm labels in your own menu.

## Steps

### How to set up and run data collection in JobBOSS2

**Items:**

Confirm every employee who will clock in exists as an active employee record with the right department, pay rate (if you cost labor by employee) and a unique badge or login ID.

Make sure each job you want tracked has its routing released: operations must exist on the job, be assigned to a work center, and be in a status that allows time to be reported.

Decide the capture method per area of the shop: a fixed terminal or kiosk at the machine, a tablet or phone using the mobile or web shop floor client, or supervisors keying time sheets in the back office.

Have the operator identify themselves, pick the job and the operation (scan the traveler barcode if you print one), and start the clock. One operator can usually run more than one operation at once if your shop allows it, so decide that rule in advance.

Stop the clock at the end of the shift or when the operation changes, and enter good quantity, scrap quantity and, where relevant, mark the operation complete.

Have a supervisor review and approve time entries daily so errors are caught while the operator still remembers the job.

Check the job's actual hours against estimate on the job cost view and correct any mistaken entries through the time entry edit screen rather than adjusting the job directly.

## Sections

### What data collection actually records

**Body:**

Every shop floor transaction ties four things together: an employee, a job, an operation on that job, and a time span with quantities. From that, the system derives actual run and setup hours, actual labor cost, quantity completed and operation status. Those numbers are what make estimate-versus-actual reporting, on-time delivery tracking and schedule updates possible. If one of the four is wrong, the downstream numbers are wrong too.

That is why the quality of the routing matters as much as the terminal. If operators cannot find the operation they are physically performing, they pick the nearest one, and the cost lands on the wrong step. A short, accurate routing with clear operation descriptions gives you better data than an elaborate one.

### Terminals, tablets and mobile

**Body:**

A fixed terminal at the work center is the most reliable option for repetitive work because the work center is known and the operator only chooses a job. Tablets and phones are better for large floors, field work and shops where a machine is shared across work centers. Barcode or QR scanning on the traveler removes most typing errors, which are the main source of bad labor data.

Whichever you pick, keep one rule: the person doing the work records the work. Batch entry at the end of the day by a supervisor is the second best option and produces rounded, guessed times. If you must do it, at least capture start and stop times, not a single hours figure.

### Labor will not post: the usual causes

**Body:**

The most common reasons a clock-in is rejected or does not show on the job are an employee that is inactive or missing a department, an operation that is already marked complete, a job that is on hold or not yet released, and a work center mismatch where the operation belongs to a center the station is not allowed to report for.

Another frequent cause is an open time entry from yesterday. If an operator forgot to clock out, the next day's start can be refused or can create a very long entry that distorts costs. Run a daily review for open entries and correct them before payroll or job close.

**Code:**

Daily data collection checklist
1. Open time entries older than 12 hours
2. Entries with zero quantity on completed operations
3. Operations marked complete with no labor
4. Employees who worked but have no entries
5. Entries over 12 hours for one operation

### Making the numbers trustworthy

**Body:**

Pick three metrics and watch them weekly: percent of operations with labor posted, number of corrected entries, and variance of actual versus estimated hours by work center. Data collection improves when operators see that the data is used, so review one job with them per week.

If you pay from the same data, agree on rounding and lunch rules early, and keep payroll-grade time separate from job costing time if your shop is not ready to treat them as the same record.

## Pitfalls

- Letting operators log into the nearest operation instead of the one they are doing, which corrupts both costing and scheduling.
- Leaving open time entries overnight; they inflate hours and block the next clock-in.
- Closing operations early so the job looks finished, then posting late labor to a closed step.
- Using one shared login on a terminal, which removes any link between labor and the person.
- Fixing job cost by editing the job totals instead of correcting the underlying time entries.

## Ai Angle

Shops often have good data collection and still cannot answer simple questions without a report writer. A private assistant grounded in the JobBOSS database can answer questions like which jobs have open time entries, or where actual hours exceed estimate by more than 20 percent, show the query it ran, and stay read-only. Netray runs this on the shop's own server so job and labor data never leave the building.

## Faq

### Do I need special hardware for JobBOSS2 data collection?

**Answer:** No. A touch-screen PC or tablet at each work center with an optional barcode scanner is typical. Phones and tablets can work through the mobile or web client. The key requirement is that the device can reach your JobBOSS2 server reliably, so check Wi-Fi coverage on the floor before you commit.

### Can one operator work on several jobs at once?

**Answer:** Usually yes, but it is a policy decision. Some shops allow overlapping clock-ins for machine-tending work and split the time between jobs. If you allow it, make sure your labor reports divide the time rather than double counting it, otherwise job cost looks higher than reality.

### Why does my job show no actual hours?

**Answer:** Check that operators clocked in against that job and operation, that the entry is not still open, and that the employee and operation are in valid statuses. Also confirm you are looking at the right job cost view, since some views show only approved time.

### How do I correct a wrong time entry?

**Answer:** Edit or reverse the time entry itself through the time entry or labor review screen, then re-enter it against the correct job and operation. Avoid changing job totals directly, because the next recalculation can overwrite your change.

## Search terms

jobboss2 data collection, jobboss shop floor data collection, jobboss2 clock in, jobboss2 labor tracking, jobboss2 time entry, jobboss job tracking, jobboss2 mobile shop floor, jobboss labor not posting

---