# MYOB Acumatica Manufacturing: Batch Size in BOMs and Production Orders

> Source: https://netray.co/erp-help/myob-acumatica-manufacturing-batch-size-bom-and-production-orders
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

In Acumatica Manufacturing the bill of material is defined for a batch size: component quantities are the amounts needed to make that batch, and a production order scales them by order quantity divided by batch size. Yield and scrap factors then increase the required material. Setting the batch size to match how the plant actually makes the product keeps component requirements correct.

## Kind

how-to

## System

small-erp

## Erp

Acumatica / MYOB Acumatica Manufacturing

## Module

Manufacturing / Bill of Material

## Query

myob acumatica manufacturing batch size

## Alternate Queries

- acumatica bom batch size
- acumatica production order quantity scaling
- acumatica manufacturing yield
- acumatica lot size bom

## Applies To

Acumatica Manufacturing Edition and MYOB Acumatica in markets where it is sold under that name; field labels may vary by release

## Steps

### Set batch size correctly

**Items:**

- Open the Bill of Material for the item and revision and find the batch size field on the BOM.
- Enter the batch size as the quantity the listed material and operation quantities produce, for example 100 units or 1 mixer load.
- Enter material quantities for the whole batch, not per unit, unless the batch size is 1.
- Add scrap factor or yield assumptions on materials and operations where real losses occur.
- Create a production order for a test quantity and check the calculated material requirements.
- Compare against hand calculation: required quantity equals material quantity times order quantity divided by batch size, adjusted for scrap.
- Check that routing run times are also expressed against the same batch basis.

## Sections

### Why batch size matters

**Body:**

Many processes, especially mixing, blending, heat treatment and chemical work, have a natural batch size: a tank of 500 litres, an oven load of 200 parts. Defining the BOM for that batch is more natural than for one unit, and avoids fractional component quantities that lose precision.

The risk is mixing bases. If the BOM is per 100 units but the routing times are per unit, the production order will show nonsense labor and machine hours.

### Scaling, yield and scrap

**Body:**

Scaling is linear: a production order for 250 units on a batch size of 100 needs 2.5 times the listed material. Real processes are rarely perfectly linear, so a minimum batch is sometimes enforced by planning policy or lot sizing on the item rather than the BOM.

Yield and scrap factors raise the quantity needed to deliver the good output. Use measured yields from production records, and revisit them. A scrap factor set once and never reviewed quietly distorts cost and purchasing.

### Batch size versus lot size

**Body:**

Batch size on the BOM describes what the recipe produces. Lot size or order policy on the item and warehouse settings describes how planning groups demand into orders. They are separate controls, and confusing them is a frequent source of unexpected planned order quantities.

After changing a batch size on a live BOM, create a new revision rather than editing history, and check open production orders because they may not recalculate automatically.

## Pitfalls

- BOM quantities per batch but routing times per unit.
- Changing batch size on a BOM that open production orders use.
- Confusing BOM batch size with item lot size policy.
- Setting yield once and never reviewing it.
- Skipping a test production order after changes.

## Ai Angle

An ERPray assistant can compare planned against actual material consumption across completed production orders and highlight BOMs where actual use per batch consistently exceeds the BOM, suggesting yield or batch size corrections for a planner to approve. It reads from the Acumatica data under the user's roles, and a local model option exists for private deployments.

## Faq

### What is batch size in an Acumatica BOM?

**Answer:** The quantity of finished product that the BOM's material and operation quantities are defined for. A production order for a different quantity scales the requirements proportionally to the order quantity divided by batch size.

### How are production order materials calculated?

**Answer:** Roughly material quantity times order quantity divided by batch size, then adjusted for scrap and yield factors. Always verify with a small test order and a hand calculation before trusting a new BOM in production.

### Is MYOB Acumatica different from Acumatica?

**Answer:** MYOB Acumatica is the name under which Acumatica is sold in some markets by MYOB. The core platform and manufacturing functions are Acumatica's, though packaging, localizations and support arrangements differ.

### Can I change a batch size after production orders exist?

**Answer:** Prefer to create a new BOM revision and apply it to new orders. Changing the active revision can affect open orders and cost rollups, so test in a copy of the tenant and review open orders first.