# How to add a private AI layer to an on-prem CMMS

> Source: https://netray.co/erp-help/private-ai-layer-cmms-on-prem-architecture
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

Maintenance history is mostly free text and codes, which is what retrieval and a local model handle well. Read the CMMS through its supported API, ODBC views or a reporting copy, index work order text and manuals, and let a local model answer from cited records. Creating or changing work orders goes through the CMMS's own interface with human approval.

## Kind

advanced

## System

on-prem-apps

## Erp

On-prem CMMS (Maintenance Connection, MP2 and similar)

## Module

Work orders, assets, PM schedules

## Query

how to add AI to an on-prem CMMS

## Alternate Queries

- AI for Maintenance Connection on-prem
- MP2 CMMS AI integration
- chat with CMMS work order history locally
- CMMS LLM without cloud

## Applies To

On-prem CMMS products backed by SQL Server or similar, including Maintenance Connection and MP2 class systems. Many SaaS CMMS products (Fiix among them) expose only an API, with no database access.

## Steps

### Rollout for an AI layer on a CMMS

**Items:**

- Confirm what access the vendor supports: a documented web service or REST API, database views for reporting, or neither. Use the supported route first and ask the vendor in writing before reading tables directly.
- Identify the objects you need: assets and locations, work orders and tasks, PM schedules, parts and inventory, failure and cause codes, technician notes.
- Create a read-only account and a reporting copy of the database if one is permitted. Keep AI queries off the production database.
- Export or stream work order history into a retrieval index, with asset, location, craft, failure code and date as metadata, and redact any personal data you do not need.
- Add OEM manuals, PM procedures and lubrication standards from file shares to the index, linked to asset classes.
- Expose approved tools: find_similar_failures, asset_history, pm_compliance, parts_for_asset, backlog_by_craft, each returning cited record numbers.
- Serve an open-weight model locally and limit it to those tools. Log each question, the records returned and the user.
- Draft before you write: let the assistant propose a work order description and parts list that a planner reviews and enters through the CMMS.

## Sections

### Data access paths

**Body:**

Packaged on-prem CMMS products usually sit on SQL Server and offer a web service layer, import and export utilities and reporting views. The right route depends on the vendor and version, so confirm which interfaces are supported before building. Direct table reads are the weakest option: schemas change between releases and support may be affected.

Whichever route you use, the data model is similar: assets in a hierarchy, work orders with status and type, tasks, labour and parts transactions, PM schedules driven by calendar or meter, and failure, problem and cause codes. The valuable text sits in descriptions, technician notes and close-out comments.

SaaS CMMS products often have an API but no database access. This article assumes on-prem, where you can also take a reporting copy. If your CMMS is cloud-hosted, the same retrieval design applies but data will have to be pulled through the API into your own store.

**Code:**

-- Illustrative reporting query: recent corrective work orders on one asset
-- (table and column names are generic, map them to your CMMS schema)
SELECT wo.wo_number, wo.opened_date, wo.problem_code, wo.cause_code,
       wo.description, wo.completion_notes
FROM reporting.work_orders wo
WHERE wo.asset_id = 'PRESS-014'
  AND wo.wo_type = 'CORRECTIVE'
  AND wo.opened_date >= DATEADD(year, -3, GETDATE())
ORDER BY wo.opened_date DESC;

### Reference architecture

**Body:**

The design is a reporting copy or API puller, a retrieval index over work orders and documents, a tool server of approved read actions, a local model served by vLLM or Ollama, identity mapping and an audit log. Use structured queries for counts and compliance numbers, and retrieval for questions like what fixed this symptom last time.

Quality of codes matters. If problem and cause codes are inconsistent, the model can still read the free text, but metrics such as MTBF, MTTR and PM compliance should be computed in SQL from clean fields. SMRP-style metric definitions and ISO 14224 style failure taxonomies help you decide what to compute.

In an air-gapped plant, the index, model and logs stay inside the enclave. Manuals are ingested from controlled media, and updates to the stack are brought in as reviewed packages.

### Permissions, write-back and honest limits

**Body:**

Mirror CMMS security: site, department, craft and asset access. A technician should not retrieve cost data or work orders for a restricted area unless the CMMS already lets them. Carry these attributes into the index as metadata and enforce them in the tool server before any result reaches the model.

Write-back should use the supported API or the user interface, with a planner approving. Typical candidates are a draft corrective work order with description, asset, priority and suggested parts. Do not let the assistant close work orders, change PM intervals or adjust inventory without a person reviewing the change.

Limits: sparse or poorly written notes limit answers, and 'replaced part' as the only text teaches the model little. If your CMMS vendor ships its own assistant that works within your policy, use it. A private layer earns its place when you need to combine maintenance history with ERP, historian and document data on your own servers.

### Sizing and phased rollout

**Body:**

Work order text for a mid-sized site is small by AI standards: hundreds of thousands of records fit in an index measured in gigabytes. Model serving is sized by users and questions, often one GPU for planners and technicians at one or two sites.

Phase 1: read-only history search with cited work orders. Phase 2: drafted work orders, failure summaries and PM review suggestions. Phase 3: approved creation of work orders through the supported interface. Measure with a set of past breakdowns where the planner knows the right answer.

## Pitfalls

- Reading production tables directly without vendor confirmation, then breaking on the next upgrade.
- Ignoring site and craft security so technicians see cost or restricted areas.
- Computing MTBF or PM compliance with the model instead of SQL on clean fields.
- Indexing technician notes that contain names or personal details without redaction.
- Letting the assistant close work orders or change PM intervals automatically.
- Skipping manuals and OEM documents, which leaves answers without the procedure.

## Ai Angle

DataRay can query a CMMS reporting copy and file-share manuals on-prem and cite the work orders behind each answer. For maintenance-heavy sites, Netray can build the retrieval index, tool server and approval flow, and connect ERP and historian data so a planner sees cost, parts and condition in one answer.

## Faq

### Does our CMMS need an API for this?

**Answer:** It helps. A supported API or reporting views are the safest routes. If neither exists, ask the vendor about supported export options. A scheduled export into a reporting store is better than querying production tables unsupported.

### Can the assistant create work orders?

**Answer:** It can draft them. A planner reviews the description, asset, priority and parts, then creates the work order through the CMMS interface or supported API. Direct unreviewed creation is not recommended.

### How does it find similar past failures?

**Answer:** Work order descriptions and close-out notes are embedded into a local index with asset class and failure codes as metadata. A question retrieves the closest records and the model summarises them, citing the work order numbers.

### What about cloud-hosted CMMS tools?

**Answer:** The design still works if you pull data through the vendor API into your own store, but you then rely on the vendor for data access. Fiix, for instance, is SaaS with an API, not a database you host.

### Where is the data stored?

**Answer:** In your reporting database and local index. The model runs on your GPUs, and logs stay on your servers. Nothing has to be sent to an outside AI service.

## Search terms

CMMS AI integration, on-prem CMMS AI, Maintenance Connection AI, MP2 CMMS AI, chat with work order history, CMMS LLM without cloud, maintenance RAG on-prem, private AI maintenance planner

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
