# SAP Business One production process flow: from BOM to production order to receipt

> Source: https://netray.co/erp-help/sap-business-one-production-process-flow-bom-to-receipt
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

In SAP Business One the production flow is: item master and bill of materials, MRP recommendation or manual order, production order (planned, released), issue for production, receipt from production, then close. Each step creates documents you can report on. This is a flow chart in words with the menus and tables.

## Kind

how-to

## System

sap

## Erp

SAP Business One

## Module

Production

## Query

sap business one production process flow chart

## Alternate Queries

- sap business one production process
- sap b1 bom to production order to receipt
- sap business one manufacturing user guide
- sap business one for manufacturing companies

## Applies To

SAP Business One 10.0 (SQL Server and HANA). Menu names may vary slightly by version and localization.

## Steps

### The production flow step by step

**Items:**

- Master data: create finished goods, components and raw materials in Inventory > Item Master Data. Mark items as inventory items and set the valuation method.
- Bill of materials: Production > Bill of Materials. Choose type Production, enter components, quantities, warehouses and issue method (manual or backflush).
- Plan: run MRP (Production > MRP > MRP Wizard) to get recommendations, or create the order manually from a sales order or demand.
- Production order: Production > Production Order. Enter item, quantity, warehouse, dates. Status Planned, then change to Released when materials are ready.
- Issue for production: Inventory > Inventory Transactions > Issue for Production, based on the released order, for manual issue components.
- Receipt from production: Receipt from Production for the finished goods, based on the production order. Backflush components issue at this point if set.
- Close the order: set status Closed to post variances and stop further movements.

## Sections

### Documents and their tables

**Body:**

Each step leaves a trail in the database. The BOM sits in OITT (header) and ITT1 (rows). Production orders are in OWOR with component rows in WOR1. Issue and receipt for production create inventory documents in OIGE and OIGN with rows in IGE1 and IGN1. Stock movements for audit appear in OINM, and item stock per warehouse in OITW. Table prefix O means header or object table, and a trailing 1 means the row table of the same document, which helps reading the schema.

Use these for queries and reports, but treat the application as the source of truth for writes. Never update these tables directly.

**Code:**

- -- Open production orders and their status (SQL Server / HANA)
- SELECT T0."DocEntry", T0."ItemCode", T0."PlannedQty", T0."CmpltQty", T0."Status", T0."DueDate"
- FROM "OWOR" T0 WHERE T0."Status" IN ('P','R');

### Reports and learning resources

**Body:**

For reporting, start with the Production reports: Production Order Status, Open Items List for orders, and Bill of Materials reports in the Production module, plus Inventory reports for stock audit. For custom reports use queries in Tools > Queries or Crystal layouts. SAP's own Help Portal carries the Business One user guide and the manufacturing documentation, and SAP partners publish training videos; verify versions against your release.

If you need a functional consultant for manufacturing, look for someone who has configured MRP, backflush rules, warehouse structure and cost accounting, since the production module is simple but the surrounding configuration decides whether results are right.

### Scope for manufacturers (including Gulf region use)

**Body:**

Business One covers discrete and light assembly manufacturing well: multi-level BOMs, production orders, MRP, subcontracting via purchase orders, and basic shop floor through add-ons. It is widely used by small and mid-size manufacturers, including in the UAE, where local partners deliver implementation and localization such as VAT.

Where requirements grow into routing and capacity planning, shop floor data collection, batch genealogy or process manufacturing, check whether a manufacturing add-on is needed, and evaluate it against your process before committing.

## Pitfalls

- Releasing an order without materials in stock and then forcing negative inventory.
- Mixing manual and backflush issue methods without a clear rule per item.
- Not closing orders, which leaves work in process and variances unposted.
- Using the wrong warehouse on BOM rows so components are issued from the wrong site.
- Reporting only from the order and ignoring OINM, which loses the audit trail.

## Ai Angle

Shop managers ask questions such as which orders are late or short of components. A read-only assistant over the Business One tables, like ERPray, answers those in plain language and shows the SQL it used. For manufacturers who keep data on-prem, the model runs on your own server and respects the permissions of the connecting user.

## Faq

### What are the main steps of production in SAP Business One?

**Answer:** Maintain items and the bill of materials, plan with MRP or manually, create and release a production order, issue components, receive the finished goods, and close the order. Close posts variances and stops movements.

### Where is the production order stored?

**Answer:** In table OWOR for the header and WOR1 for the component rows. Issue and receipt documents are stored in OIGE/IGE1 and OIGN/IGN1, and inventory movements in OINM.

### Does Business One support routings and capacity planning?

**Answer:** The standard production module is focused on BOMs and orders and has limited routing and capacity planning. Companies that need detailed scheduling or shop floor control usually add a partner solution.

### What is backflush in SAP Business One?

**Answer:** It is an issue method on the BOM row that issues the component automatically when you post the receipt from production, based on the produced quantity, instead of manual issue before production.

## Search terms

sap business one production process flow, sap b1 production order process, sap business one bill of materials, sap business one manufacturing, sap b1 issue for production, sap b1 receipt from production, sap business one for manufacturing companies in dubai, sap b1 functional consultant manufacturing

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
