# SAP PP End to End Configuration: Steps, IMG Paths and Process Flow

> Source: https://netray.co/erp-help/sap-pp-end-to-end-configuration-steps
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

SAP PP configuration runs in a fixed order: enterprise structure (plant, storage location, planning plant), master data (material, BOM, work center, routing, production version), MRP and planning, production order types and scheduling, confirmation, then costing and settlement. Get the order right because each layer depends on the one before it. The IMG node is Production in SPRO, plus Materials Management for plant and MRP basics.

## Kind

how-to

## System

sap

## Erp

SAP S/4HANA and ECC

## Module

Production Planning (PP) / Configuration

## Query

sap pp end to end configuration

## Alternate Queries

- sap pp configuration steps
- sap pp end to end implementation process
- sap pp organizational structure
- sap pp end to end process flow

## Applies To

SAP ECC 6.0 and SAP S/4HANA on-premise (discrete manufacturing, PP-MRP, PP-SFC)

## Steps

### End to end PP configuration sequence

**Items:**

Enterprise structure: define company code, plant (OX10), storage locations (OX09) and assign the plant to the company code (OX18). Assign the plant to a purchasing organization if you also buy components.

Material master basics: define material types and number ranges, and activate the MRP, Work Scheduling and Plant Data/Storage views for the plant. Define MRP controllers per plant.

Master data: create the BOM (CS01), work centers (CR01), routing (CA01) and, where used, the production version (C223) that ties BOM and routing together.

Planning: maintain MRP plant parameters, MRP types, lot-sizing procedures and planning strategies, then test with MD01N and review the result in MD04.

Shop floor: define production order types, order-type-dependent parameters, scheduling parameters, control keys (OPJ8) and the confirmation parameters. Number ranges and status profiles belong here too.

Execution: release the order (CO02), issue components (MIGO 261), confirm (CO11N) and receive finished goods (MIGO 101).

Costing and close: set up cost centers and activity types, standard costing (CK11N), the order settlement rule and the costing variants, then run variance calculation and settlement (KKS1 or CO88).

Test the whole chain with a pilot material before loading the real master data.

## Sections

### Organizational structure for PP

**Body:**

PP does not have its own org unit. It sits on the plant, which is the central object. Planning in MRP happens at plant level (or at MRP area level if you activate MRP areas for storage locations or subcontractors). One plant can be the planning plant for others, and the work center, routing and production orders are plant-specific.

Decide early how many plants you need. A common mistake is creating one plant per physical building when the real need is a storage location or a work center group. Plants carry their own valuation, MRP, costing and number ranges, so every extra plant multiplies the configuration and master data load.

Also define the controlling area and cost centers now. Work centers refer to cost centers, and without them you cannot cost a routing operation.

**Code:**

- SPRO > Enterprise Structure > Definition > Logistics - General > Define, copy, delete, check plant (OX10)
- SPRO > Enterprise Structure > Definition > Materials Management > Maintain Storage Location (OX09)
- SPRO > Enterprise Structure > Assignment > Logistics - General > Assign plant to company code (OX18)

### Master data and the production version

**Body:**

The BOM defines what goes into the product, the routing defines the sequence of operations and the work centers they run on, and the work center holds the capacity, scheduling formulas and costing link. In the material master, the MRP 1 to 4 views, Work Scheduling view and the Plant Data / Storage 1 view must be created for the producing plant.

The production version links one BOM alternative to one routing alternative and is what the production order reads. If it is missing or invalid for the order quantity or date, order creation fails. See the related page on the missing production version error.

Procurement type must be set to E (in-house production) for manufactured items and F for externally procured. Special procurement type, planning strategy group and the MRP type then decide how demand is covered.

**Code:**

- CS01  Create BOM
- CR01  Create work center
- CA01  Create routing
- C223  Maintain production version

### MRP, order types and scheduling

**Body:**

MRP configuration sits under Materials Management > Consumption-Based Planning and Forecasting. Define the plant parameters, MRP groups, MRP types, lot-sizing procedures and the planning horizon. Production planning strategies (make-to-stock, make-to-order) are in Production > Production Planning > Demand Management > Planning Strategy.

Production orders use order types defined under Production > Shop Floor Control > Master Data > Order. Each order type has a number range, a status profile, a settlement profile and a costing link. Order-type-dependent parameters per plant control the default scheduling, availability checks, goods movements and printing.

Scheduling parameters decide how lead time is calculated from operation durations and reduction levels. If dates come out wrong, check the scheduling type (forward, backward, today), the work center formulas and the factory calendar before blaming MRP.

### Confirmation, costing and settlement

**Body:**

Confirmation parameters control whether CO11N posts activity, backflush, automatic goods receipt and which fields are visible. The control key (OPJ8) on each operation decides whether it is confirmable, costed, scheduled and printed. A wrong control key is the usual cause of an operation that will not confirm.

Costing needs a costing sheet or valuation variant, a costing variant for planned and actual costs, and a settlement profile with the target receiver (material account, usually). Standard price comes from CK11N and CK24, and variances are calculated at period end then settled to the variance accounts.

Run one test order through every step and check the financial documents at each point. That is the real end to end test of configuration, not the individual IMG nodes.

## Pitfalls

- Configuring order types before the plant, number ranges and status profiles exist, which forces rework.
- Creating a BOM or routing before the material master has the right views in the plant.
- Skipping the production version, then finding the order cannot be created or the BOM explosion picks the wrong alternative.
- Leaving the work center without a cost center or activity type assignment, so the operation has no cost.
- Transporting configuration without master data dependencies (number ranges, status profiles), which makes the quality system test pass and production fail.

## Ai Angle

Configuration questions are usually 'why does this plant behave differently from that one'. An AI assistant grounded in the customizing tables can compare order types, control keys and MRP parameters across plants and show where they differ, so the consultant spends time deciding rather than navigating. Netray builds this as a read-only layer that can run on the customer's own servers with a private model. It explains and compares; configuration changes still go through your normal transport process.

## Faq

### What is the order of SAP PP configuration?

**Answer:** Enterprise structure first, then material master settings, then BOM, work center, routing and production version, then MRP, order types and scheduling, then confirmation and costing. Each step depends on the previous one, so changing the order creates rework.

### Which SAP modules does PP need to be configured with?

**Answer:** PP depends on MM for material master and procurement, CO for cost centers and order costing, QM if inspection is part of production, and FI for valuation and account determination. Configure at least the basics in MM and CO before PP order types.

### Is the configuration different in S/4HANA?

**Answer:** Largely the same IMG nodes apply, but MRP runs through MD01N with MRP Live, the material master is simplified, and some tools such as Production Planning with PP/DS are separate options. Check the simplification list for your release.

### How long does an SAP PP implementation take?

**Answer:** It depends on scope. A single plant with standard discrete manufacturing can take a few months for core configuration and testing. Multiple plants, variants, make-to-order or process manufacturing extend that considerably. Data migration usually takes longer than people expect.