# How to Print or Reprint a Customer Invoice in SyteLine

> Source: https://netray.co/erp-help/syteline-how-to-print-and-reprint-an-invoice
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Help

## Short answer

In SyteLine, invoices are created by the Invoice/Credit Memo Builder and then printed from the invoice and credit memo printing form. To reprint an invoice that was already printed, use the reprint option on that form and select the invoice number range. Output can go to a printer, a preview or PDF through report options.

## Kind

how-to

## System

syteline

## Erp

Infor SyteLine (CloudSuite Industrial)

## Module

Accounts Receivable / Invoicing

## Query

how to print invoice in syteline

## Alternate Queries

- how to reprint an invoice in syteline
- syteline reprint invoice
- syteline invoice to pdf

## Applies To

Infor SyteLine 8.x and CloudSuite Industrial (CSI); form labels and report formats differ by version and by your site's customization

## Steps

### How to print and reprint an invoice

**Items:**

- Make sure the invoice exists. New invoices are generated from shipped orders in the Invoice/Credit Memo Builder and then posted according to your process.
- Open the Invoice/Credit Memo Printing form (search the forms list for Invoice).
- Set the selection: invoice number range, customer, and date. For a single invoice, enter the same number in the start and end fields.
- To print an invoice that was already printed, tick the reprint option. Without it, the form skips invoices flagged as printed.
- Choose output through the report options: preview on screen, a specific printer, or file or PDF output, depending on what your site enables.
- Run it, check the preview for correct totals, tax and terms, then print or save.
- If you must email it, save the PDF and send it according to your document policy; some sites automate this through customer document settings.

## Sections

### Why an invoice does not print

**Body:**

The commonest cause is the printed flag. SyteLine marks invoices as printed after the first run, and the standard run skips them. Tick the reprint option or use a reprint-specific form to include them.

Next come selection mistakes: a range that excludes the invoice, a wrong site, or a customer filter. After that, check whether the invoice was built and is in the status the form expects. Finally, check the report server and printer, since a report that runs in preview but not on the printer is a printer-queue issue.

### Layout and format

**Body:**

The invoice layout is a report defined by your site's configuration, and many companies customize it for logos, legal wording and tax lines. If a field appears blank, the cause is usually the report design or the underlying data (for example, a missing bill-to or terms code), not the print action.

If you need a different layout per customer or region, ask your administrator whether it is done through multiple invoice formats or customer-specific settings, instead of editing the standard report for everyone.

### Printing, PDF and audit

**Body:**

Saving as PDF is useful for sending invoices, but it creates a copy outside the system. Decide which copy is the legal original for your jurisdiction. In some countries a sequential, system-generated document is required, and reprints must be marked as copies.

Keep a record of who reprinted what. If reprinting is frequent for one customer, find out why; it is often a sign of a delivery or portal problem rather than a printing one.

## Pitfalls

- Running the print form without the reprint option and wondering why nothing comes out.
- Using a range that excludes the invoice or the wrong site.
- Editing the standard invoice report for one customer's needs.
- Sending reprints without marking them as copies where law requires it.
- Assuming a blank field is a print problem rather than missing data.

## Ai Angle

A SyteLine-grounded assistant can answer why an invoice is not printing by checking whether it was built, posted and already flagged as printed, and can list invoices for a customer in a range. SyteRay does this read-only and shows the query. Document generation remains in SyteLine's own forms.

## Faq

### How do I reprint an invoice in SyteLine?

**Answer:** Open the invoice printing form, enter the invoice number as the range, tick the reprint option and run it. Choose a printer or PDF in the report options.

### Why does SyteLine skip my invoice when I print?

**Answer:** It has probably been marked as printed already, or the selection range or site excludes it. Use the reprint option and check the range.

### Can I save a SyteLine invoice as PDF?

**Answer:** Yes, through the report options if your site has file or PDF output enabled. If not, ask your administrator to enable it or use a PDF print driver.

### Why are totals or tax missing on the printed invoice?

**Answer:** Check that the invoice was built and posted correctly and that the customer and tax settings are complete. Layout issues beyond that are report design matters for your administrator.

## Search terms

how to print invoice in syteline, how to reprint an invoice in syteline, syteline reprint invoice, syteline invoice pdf, invoice credit memo printing syteline, syteline invoice builder, csi print invoice, syteline invoice format

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
