# AS5553 (Counterfeit Parts)

> Source: https://netray.co/glossary/as5553
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

AS5553 is the SAE standard defining requirements for avoiding, detecting, mitigating, and disposing of counterfeit electrical, electronic, and electromechanical parts, used by aerospace and defense organizations to build a documented counterfeit parts control plan.

## Aliases

- AS5553
- AS5553D
- counterfeit electronic parts standard

## Category

compliance

## Full Definition

The standard emerged from a genuine crisis. Congressional investigation in the early 2010s documented counterfeit electronic parts in military aircraft, missile systems, and helicopters, frequently traced to reclaimed components harvested from scrapped electronics, remarked, and sold through independent distribution. AS5553 responds by requiring organizations to establish a counterfeit parts control plan covering the whole lifecycle: how parts are sourced, verified on receipt, handled when suspect, and disposed of when confirmed counterfeit.

Sourcing hierarchy is the strongest control the standard imposes. Purchasing from the original component manufacturer or its franchised or authorized distributor preserves an unbroken chain of custody and is the preferred path. Purchasing from independent distributors, brokers, or the open market breaks that chain and triggers substantially heavier verification obligations - documented traceability back toward the manufacturer, enhanced incoming inspection, and often laboratory testing. Obsolescence and allocation shortages are what push buyers into the open market, so component lifecycle management is itself a counterfeit control.

Detection is layered because no single test is conclusive. Typical progression runs from external visual inspection under magnification for remarking, resurfacing, and lead condition, to solvent or scrape tests for surface treatment, X-ray for internal die and lead frame comparison, decapsulation for die marking verification, XRF for material composition, and electrical parameter testing against the datasheet. AS6171 provides the detailed test methods and sampling, and AS6081 addresses requirements specific to independent distributors, while AS6496 covers franchised distributors.

Reporting closes the loop. When a suspect or confirmed counterfeit part is identified, the organization must quarantine it so it cannot reenter the supply chain, notify affected customers and the original manufacturer, and report to the Government-Industry Data Exchange Program. Deliberately returning a suspect part to the supplier for credit is prohibited under the standard's disposition requirements, because that action simply recirculates the part to the next buyer.

The regulatory linkage matters as much as the standard. DFARS clauses require covered contractors to maintain an acceptable counterfeit electronic part detection and avoidance system, and they restrict the cost allowability of counterfeit parts and their rework. That combination makes AS5553 conformance a practical necessity for defense electronics suppliers, and AS9100D reinforces it by requiring counterfeit part prevention within the quality management system itself.

## Why It Matters

- Counterfeit components in flight or weapons hardware create safety and mission failure risk that no amount of downstream inspection reliably catches.
- DFARS makes the cost of counterfeit parts and their rework generally unallowable, so the financial loss falls entirely on the contractor.
- Open-market purchasing during shortages is where nearly all counterfeit exposure originates, tying procurement urgency directly to product risk.
- Traceability records must survive for the life of the system, requiring lot and date-code capture in ERP receiving rather than in supplier paperwork alone.

## In Practice

Capture date code and lot code at receiving, not at kitting. One defense electronics manufacturer discovered a suspect batch of voltage regulators eighteen months after installation. Because receiving had recorded only the supplier packing slip number, they could not determine which of forty shipped units contained parts from the affected lot and had to recall all of them. Recording manufacturer lot, date code, and distributor chain of custody on the ERP receipt line would have narrowed the recall to six units.

## Faq

### What is AS5553 and who needs to follow it?

**Answer:** AS5553 is the SAE standard for a counterfeit electronic parts control plan. It applies to organizations that buy and use electronic parts in aerospace and defense products, and it usually reaches suppliers through contract flow-down and DFARS counterfeit-part requirements rather than through a certificate of its own.

### What is the difference between AS5553 and AS6081?

**Answer:** AS5553 sets requirements for organizations that purchase and use electronic parts, describing the counterfeit avoidance, detection, mitigation, and disposition system those organizations must maintain. AS6081 sets requirements specifically for independent distributors - companies selling parts outside franchised channels - defining how they must verify, test, document, and control the material they resell.

### Do I have to test every part purchased from a broker?

**Answer:** Not necessarily every part, but every open-market lot needs a documented, risk-based verification approach. Sampling levels and test methods follow AS6171 and depend on part criticality, supplier history, price anomalies, and packaging condition. What is not acceptable under AS5553 is accepting broker material into production on paperwork alone with no independent verification.

## Search terms

what is AS5553, AS5553 meaning, AS5553 counterfeit parts explained, counterfeit electronic parts control plan, AS5553 vs AS6081

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
