# Bill of Lading (BOL)

> Source: https://netray.co/glossary/bill-of-lading
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

A bill of lading (BOL) is the document a carrier issues to confirm it received goods for shipment. It acts as a receipt, a contract of carriage and, in some forms, a document of title. ERPs print it from the shipping transaction.

## Aliases

- BOL
- B/L
- straight bill of lading

## Category

erp-core

## Full Definition

The BOL lists shipper, consignee, carrier, piece counts, package types, description of goods, weights, freight class and special instructions. The driver signs it at pickup, and the consignee signs it at delivery. It is the primary evidence in a freight claim.

A straight BOL is non-negotiable and names the consignee. An order BOL is negotiable and used where title transfers against payment, typically in international ocean trade. An ocean bill of lading and an air waybill play the same role for their modes.

ERP shipping modules assemble the BOL from packed shipments. In SyteLine, the shipping and packing slip functions produce shipment documents and carry carrier and weight data. Infor LN outbound procedures and NetSuite item fulfillment can generate BOL forms, often through templates or a connected transportation system.

Accuracy matters. Wrong freight class, weight or piece count leads to carrier reweigh charges, called reclasses, and delays at the dock. Hazardous materials need the correct proper shipping name and UN number.

## Why It Matters

- It is the legal and evidentiary record if freight is lost or damaged.
- Wrong class or weight on the BOL triggers carrier adjustments that eat margin.
- Customers and retailers often require specific BOL formats and reference numbers.
- Hazmat and export shipments need exact data to stay compliant.

## In Practice

A shipper lists four pallets as freight class 70 at 1,800 lb. The carrier reweighs and finds 2,350 lb with dense packaging that qualifies for a different class. The invoice is adjusted upward. Pulling actual packed weights from the ERP packing step into the BOL avoids the mismatch.

## Faq

### What is the difference between a BOL and a packing slip?

**Answer:** A packing slip tells the customer what is in the box. A BOL is the carrier document that records what was handed over for transport and under what terms.

### Who signs a bill of lading?

**Answer:** The shipper or its agent prepares it, the carrier driver signs at pickup, and the consignee signs on delivery, noting any damage or shortage.

### Can an ERP generate a BOL automatically?

**Answer:** Yes, most ERPs can print one from shipment data, though many companies use a transportation or shipping tool for carrier-specific formats and labels.

## Search terms

bill of lading, what is a BOL, BOL in ERP, straight bill of lading, bill of lading vs packing slip, freight shipping document, BOL requirements

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
