# CAGE Code

> Source: https://netray.co/glossary/cage-code
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

A CAGE code is a five-character identifier assigned to entities that do business with the US federal government and defense primes. It is issued by the Defense Logistics Agency, usually through SAM.gov registration, and identifies a specific facility.

## Aliases

- Commercial and Government Entity code
- NCAGE
- CAGE number

## Category

compliance

## Full Definition

CAGE stands for Commercial and Government Entity. The code is five characters and identifies a particular location of a supplier, manufacturer or other entity, not only a company. It appears on contracts, drawings, labels, procurement records and many military specifications, which is why defense ERPs hold it on both customer and vendor records.

In the United States a CAGE code is normally assigned as part of registration in SAM.gov, the System for Award Management, and maintained by the Defense Logistics Agency. Foreign entities receive an NCAGE code through their national codification bureau. Registration details need to be kept current, and the code ties the entity to other lookups used by contracting officers.

A CAGE code is an identifier only. It does not attest that a company is ITAR registered, CMMC certified or AS9100 certified. Compliance status is tracked separately and verified through the relevant systems or certificates. Confusing the code with a quality or security approval is a common misunderstanding.

In ERPs the CAGE code lives in custom or standard fields on the customer and vendor master, and it is printed on certificates of conformance, packing slips, unique item identification labels and shipping documents. For defense work, data quality here matters because a wrong code on a label or a record can delay payment or acceptance.

## Why It Matters

- Defense contracts and prime purchase orders commonly require the supplier's CAGE code on documents, so missing data stalls orders.
- Flow-down verification of sub-tier suppliers starts with confirming the code matches the legal entity and location.
- Counterfeit and diversion risk programs use the code to confirm the origin of parts and the party that handled them.
- Accurate codes on labels and packing paperwork reduce rejection at government receiving.

## In Practice

Example: a defense electronics shop ships a lot to a prime. The packing slip and certificate of conformance both need the shop's CAGE code and the prime's ship-to CAGE. If the vendor master holds the code on the site record, the document template pulls it automatically. If the shop operates two buildings with separate codes, the ERP should select the code by plant, not use one global value. The gotcha is a code copied from the parent company onto a branch facility.

## Faq

### How do I get a CAGE code?

**Answer:** In the US, registering the entity in SAM.gov results in a CAGE code assigned by the Defense Logistics Agency. Foreign entities obtain an NCAGE code from their national codification authority.

### Does a CAGE code prove ITAR registration or CMMC?

**Answer:** No. It only identifies the entity and location. ITAR registration, CMMC status and AS9100 certification are separate and must be verified separately.

### Is a CAGE code per company or per site?

**Answer:** It identifies a specific entity at a specific location, so separate facilities can have separate codes. Use the one that matches the facility doing the work or shipping the product.

## Search terms

CAGE code, what is a CAGE code, NCAGE code, CAGE code SAM.gov, CAGE code lookup, CAGE code defense supplier, Commercial and Government Entity code, CAGE code on packing slip

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
