# Deemed Export

> Source: https://netray.co/glossary/deemed-export
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

A deemed export is the release or transfer of export-controlled technology or source code to a foreign person located in the United States. It is treated as an export to that person's home country and may require a license or other authorisation.

## Aliases

- deemed exports
- foreign person access
- technology release to foreign national

## Category

compliance

## Full Definition

Export control law applies to information as well as shipments. Handing controlled technical data to a foreign national employee, visitor or contractor in the US, whether by showing drawings, sharing files, discussing in a meeting or giving system access, can count as an export. Under the EAR the release is treated as an export to the person's most recent country of citizenship or permanent residency. The ITAR treats such a release as an export as well, under its own definitions.

Which rules apply depends on classification. Items on the US Munitions List fall under ITAR, administered by the State Department. Items on the Commerce Control List fall under the EAR, administered by the Commerce Department. Each has exemptions, and a lawful permanent resident or protected individual is generally not a foreign person for these purposes. Companies should rely on their empowered official or export counsel for determinations.

Hiring and access control are the practical battlegrounds. HR screening for citizenship status, role-based access to document repositories, segregated project sites, and visitor controls reduce risk. Remote support also matters: an offshore IT or ERP consultant with admin rights may see controlled technical data in database tables, attachments or reports.

ERP and AI add new surfaces. A natural-language assistant that indexes drawings, BOMs and work instructions can answer a question for any user who can reach it, so access must follow the same classification and role rules as the source data. Running models inside the company boundary and filtering retrieval by user entitlement are common design choices.

## Why It Matters

- Unauthorised release to a foreign person can be a violation even if nothing leaves the building.
- Penalties can be severe and can include fines and loss of export privileges.
- Support, consulting and cloud arrangements often create unnoticed exposure through admin access.
- AI search and chat tools can widen who sees controlled data unless entitlements are enforced.

## In Practice

Example: a supplier of defense components runs its ERP with a third-party support team. Before granting database access, the company confirms where each engineer is located and their status, restricts attachment tables holding controlled drawings, and logs access. For an internal AI assistant, retrieval is filtered so users without clearance for a program never see its drawings in answers. The gotcha is a shared mailbox or shared folder that nobody classified.

## Faq

### Is giving drawings to a foreign employee in the US an export?

**Answer:** It can be. Release of controlled technical data to a foreign person in the US is treated as an export to their country, and may require authorisation depending on classification.

### Are green card holders foreign persons?

**Answer:** Generally no. U.S. lawful permanent residents and certain protected individuals are not treated as foreign persons under the rules, but confirm with your export compliance officer.

### Does an AI assistant create deemed export risk?

**Answer:** It can if the assistant exposes controlled data to users or operators who are not authorised. Entitlement-aware retrieval and in-boundary hosting reduce the risk.

## Search terms

deemed export, deemed export ITAR, deemed export EAR, foreign national access technical data, deemed export license, export controlled technology release, foreign person definition ITAR, deemed export AI

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
