# DMAIC (Define, Measure, Analyze, Improve, Control)

> Source: https://netray.co/glossary/dmaic
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

DMAIC is the five-phase Six Sigma method for improving an existing process: Define the problem, Measure current performance, Analyze root causes, Improve with verified solutions, and Control the gains so they last.

## Aliases

- DMAIC process
- Six Sigma DMAIC
- DMAIC methodology

## Category

manufacturing

## Full Definition

Define sets the project scope, customer requirements and goal, often in a project charter. Measure establishes a baseline, validates the measurement system and collects data on the process output (often called Y). Analyze uses tools such as Pareto charts, fishbone diagrams, hypothesis tests and regression to separate real causes from guesses. Improve develops, tests and pilots solutions. Control locks in the gains with control charts, updated procedures and a response plan.

DMAIC is used when a process exists but performs poorly and the cause is unclear. For designing a new process, Six Sigma uses DMADV or DFSS instead. For simple problems with an obvious fix, a PDCA loop or a kaizen event is usually quicker and enough.

Measure and Analyze are data-heavy and ERP is a common source. Defect, scrap and rework quantities, operation times, supplier receipt and inspection results, and delivery dates all live in ERP and quality modules (for example quality and nonconformance records in Infor SyteLine, QM in SAP, quality management in Infor LN). Data cleaning is often the biggest effort, since inconsistent reason codes and missing transactions weaken the analysis.

In Control, the improved settings should be written into the system of record: updated routings, inspection plans, SPC alarms and work instructions. Gains that live only in a slide deck fade.

## Why It Matters

- Brings statistical discipline to problems where causes are not obvious.
- Gives projects a clear gate structure that managers can review.
- Prevents jumping to solutions before the cause is verified.
- Control phase practices protect gains from slipping back.

## In Practice

A coating line has a first pass yield around 92 percent. Define: target 97 percent. Measure: validate the gauge and collect two months of defect codes from the quality module. Analyze: Pareto shows one defect type dominates and ties to a specific booth and humidity range. Improve: adjust process settings. Control: add an SPC chart and update the inspection plan.

## Faq

### What does DMAIC stand for?

**Answer:** Define, Measure, Analyze, Improve, Control.

### When should you use DMAIC instead of PDCA?

**Answer:** Use DMAIC for complex, data-rich problems where the cause is unknown and statistical analysis is needed. PDCA or a kaizen event suits simpler problems.

### What is the difference between DMAIC and DMADV?

**Answer:** DMAIC improves an existing process. DMADV (Define, Measure, Analyze, Design, Verify) is used to design a new process or product.

### Do you need Black Belt certification to use DMAIC?

**Answer:** No. The method can be used by anyone, though complex projects benefit from trained Green or Black Belts for the statistics.

## Search terms

what is DMAIC, DMAIC Six Sigma, DMAIC phases, define measure analyze improve control, DMAIC vs PDCA, DMAIC example, DMAIC tools

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
