# EMS (Electronics Manufacturing Services)

> Source: https://netray.co/glossary/ems
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

EMS (electronic manufacturing services, also electronics manufacturing services) is the industry of companies that build electronics for other brands (OEMs) under contract. An EMS company covers PCB assembly, box build, test and often procurement and logistics.

## Aliases

- electronic manufacturing services
- EMS company
- EMS provider
- contract electronics manufacturer
- CEM
- electronics contract manufacturing

## Category

manufacturing

## Full Definition

An EMS provider takes an OEM's design package (BOM, Gerbers, assembly drawings, test specs) and manufactures the product. Services range from simple PCB assembly to full product build, testing, programming, packaging and fulfilment, plus sometimes design for manufacturability review and supply chain management.

Commercial models matter to the ERP. In turnkey, the EMS buys every component and quotes a total price. In consignment, the OEM supplies parts and the EMS charges for assembly only. Many deals are partial turnkey. High-mix low-volume shops quote and schedule hundreds of different assemblies, so quoting speed, feeder setup grouping and component availability dominate profitability.

ERP needs for EMS differ from a standard discrete manufacturer: customer-owned inventory kept separate from company-owned stock, BOM versions per customer, quote-to-order from the BOM with component pricing, lot and date-code traceability, reel-level tracking, and shop floor data collection from SMT lines. Systems commonly used in EMS include Infor and NetSuite deployments plus specialised packages such as Epicor, IQMS (DELMIAworks) or Aegis.

Compliance expectations come from the customer: IPC standards, RoHS, and for aerospace, medical or automotive work, AS9100, ISO 13485 or IATF 16949.

## Why It Matters

- Quoting from the customer BOM quickly and accurately wins or loses EMS business.
- Customer-owned consigned inventory must never be mixed with owned stock in valuation or MRP netting.
- Customers expect traceability back to component lot and date code for every shipped serial number.
- Thin margins mean small errors in scrap, overage allowances or component pricing hit profit directly.

## In Practice

An EMS shop quotes 1,000 units of a board with 120 line items. Resistors and capacitors are bought with an overage of 2 to 5 percent to cover placement loss, because a short count mid-run stops the line. The ERP quote uses current distributor pricing; if the BOM contains an end-of-life part, the buyer flags it before accepting the order.

## Faq

### What is the difference between EMS and OEM?

**Answer:** The OEM owns the product design and brand. The EMS provider builds the product for the OEM under contract.

### What does an EMS company do?

**Answer:** An EMS company manufactures electronics to the OEM's design: it reviews the design for manufacturability, quotes from the customer BOM, sources components (turnkey) or receives customer-supplied parts (consignment), builds PCB assemblies on SMT and through-hole lines, programs and tests them, does box build and cable assembly, and packs and ships, often with repair and end-of-life support. EMS companies range from small high-mix shops to large global groups.

### What are electronic manufacturing services used for?

**Answer:** OEMs use electronic manufacturing services to avoid owning SMT lines, test equipment and a component buying team, to scale volume up or down, and to build closer to their markets. Industries include industrial controls, medical devices, aerospace and defense, automotive, telecom and consumer electronics.

### What is turnkey EMS?

**Answer:** The EMS provider purchases all components and materials and delivers finished product at a single price, taking on material procurement.

### What ERP features matter most to an EMS company?

**Answer:** BOM-based quoting, customer-owned inventory handling, lot and date-code traceability, and shop floor data capture from SMT and test.

## Search terms

what is EMS, electronic manufacturing services, ems electronic manufacturing services, EMS company, electronics manufacturing services, contract electronics manufacturing, turnkey vs consignment, EMS ERP, EMS vs OEM

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
