# Labor Reporting

> Source: https://netray.co/glossary/labor-reporting
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

Labor reporting is the recording of the hours each employee spends on specific jobs, operations or indirect activities, so that the ERP can calculate actual job cost, labor efficiency and payroll distribution.

## Aliases

- labor tracking
- time and attendance vs job labor
- job labor reporting
- labor transactions

## Category

manufacturing

## Full Definition

Direct labor is time spent working on a job operation, such as setup or run. Indirect labor is time on activities that support production but are not attributable to one job, such as cleaning, training or waiting for material. Both are reported, because efficiency and absorption depend on the full picture.

Reporting can be job-based (start and stop on each operation), batch-based (hours entered at end of shift) or machine-based (hours inferred from machine run time). The more detailed the capture, the more accurate the costing, but the more effort at the floor. The compromise is often a badge scan at start and stop, with exceptions managed by supervisors.

In Infor SyteLine, labor is posted through Job Order Transactions or Shop Floor Data Collection with labor rates from the employee and work center. Infor LN reports hours through shop floor control and hours accounting sessions. Labor reporting is separate from time and attendance, which tracks paid hours; reconciling the two is a common control to catch missing or double-reported time.

## Why It Matters

- Actual labor drives job cost and variance analysis against standard.
- Accurate hours support quoting: you quote from real history, not guessed routing times.
- Reconciling job hours to paid hours exposes unreported time and inflated entries.
- Contracts like cost-plus government work require labor to be charged accurately to the correct job.

## In Practice

An operator is paid 8 hours but job labor shows 6.2 hours across three jobs, 0.8 hours indirect and 1.0 hour unreported. A daily reconciliation report flags the gap for the supervisor. Over a month, the shop finds one cell consistently under-reports, which explains why its jobs always look more profitable than the rest.

## Faq

### What is the difference between direct and indirect labor?

**Answer:** Direct labor is attributable to a specific job or product, such as machining. Indirect labor supports the operation generally, such as cleaning or supervision.

### How is labor efficiency calculated?

**Answer:** Earned hours (standard hours for the quantity produced) divided by actual hours reported, usually shown as a percentage.

### Is labor reporting the same as time and attendance?

**Answer:** No. Time and attendance records paid presence; labor reporting allocates working time to jobs. They should be reconciled.

## Search terms

labor reporting, job labor tracking, direct vs indirect labor, labor variance, labor efficiency, ERP labor transactions, labor cost per job

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
