# Landed Cost

> Source: https://netray.co/glossary/landed-cost
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

Landed cost is the total cost of bringing purchased goods into inventory, combining the supplier price with freight, insurance, customs duty, tariffs, brokerage, and handling, so inventory is valued at what the material truly cost to acquire.

## Aliases

- total landed cost
- delivered cost

## Category

erp-core

## Full Definition

Landed cost exists because the invoice price is not the acquisition cost. A component quoted at 4.00 dollars from an overseas supplier may carry 0.35 in ocean freight, 0.10 in insurance, 0.28 in duty, 0.06 in brokerage, and 0.09 in inland transport, arriving at roughly 4.88. That 22 percent difference is invisible if only invoice price is captured, and it systematically biases sourcing decisions toward low-price, high-freight suppliers. Under generally accepted accounting principles these acquisition costs belong in inventory rather than in period expense.

The mechanical challenge is allocation and timing. Freight and duty charges usually arrive days or weeks after the receipt, often as a single invoice covering multiple purchase orders and many part numbers. ERP landed cost functionality handles this by letting you define cost components, choose an allocation basis such as value, weight, volume, or quantity, and apply the charges retroactively to the receipts on that shipment. Choosing the basis correctly matters: allocating ocean freight by value rather than by volume will overload expensive small parts and undercost bulky cheap ones.

Tariffs have made landed cost a live commercial issue rather than an accounting nicety. Section 301 tariffs, antidumping duties, and shifting trade policy can change effective acquisition cost by double digits within a quarter. Manufacturers that model landed cost properly can compare domestic and offshore sourcing on a true basis and can quantify the benefit of duty drawback, foreign trade zones, or tariff engineering. Those that only track invoice price find out at year end when margins are already gone.

For defense and aerospace importers, landed cost intersects directly with compliance obligations. Customs valuation, country of origin determination, preferential trade agreement claims, and ITAR or EAR classification each carry their own documentation requirements, and the same shipment-level data that supports landed cost allocation typically supports those filings as well. Building the data capture once, with commercial invoice values, harmonized tariff codes, origin, and freight terms recorded against the receipt, is considerably cheaper than reconstructing years of shipment history under the time pressure of a customs audit.

## Why It Matters

- Sourcing decisions made on invoice price alone systematically favor suppliers whose freight and duty costs are hidden.
- Excluding acquisition costs from inventory understates inventory value and distorts gross margin timing.
- Tariff volatility can shift true acquisition cost by double digits, making landed cost a pricing and sourcing input, not just an accounting entry.
- The data captured for landed cost allocation largely overlaps with customs valuation and origin documentation requirements.

## In Practice

Worked example: two suppliers quote a machined part at 4.00 and 4.55 dollars. The 4.00 supplier is offshore with 0.88 of freight, duty, and brokerage, giving 4.88 landed. The 4.55 domestic supplier adds 0.12 of inbound freight for 4.67. The apparently cheaper source is 4.5 percent more expensive, before accounting for the longer lead time and the safety stock it forces.

## Faq

### What costs are included in landed cost?

**Answer:** Supplier invoice price plus international and inland freight, cargo insurance, customs duty and tariffs, brokerage and customs clearance fees, port and terminal handling, and any inspection or certification cost required to make the goods usable. Costs incurred after material is available for use, such as internal warehousing, are normally period expense rather than inventoriable.

### How does ERP allocate freight across multiple items?

**Answer:** You define an allocation basis and the system spreads the charge proportionally across the receipt lines. Value-based allocation suits duty, which is usually assessed on value. Weight or volume allocation suits freight, since carriers charge on those dimensions. Using a single basis for every charge type is the most common configuration error and quietly misstates unit costs.

## Search terms

what is landed cost, landed cost meaning, landed cost explained, how to calculate total landed cost, landed cost in ERP inventory valuation

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
