# Make-to-Order (MTO)

> Source: https://netray.co/glossary/make-to-order
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

Make-to-order (MTO) is a production strategy where a product is manufactured only after a confirmed customer order, using existing designs and routings. It avoids finished goods inventory but gives the customer a lead time equal to procurement plus production time.

## Aliases

- MTO
- build to order
- BTO
- make to order vs make to stock

## Category

manufacturing

## Full Definition

In MTO, demand is real rather than forecast. The sales order triggers production or purchasing for that order, so finished goods stock is near zero while component stock may still be held. Delivery lead time is the sum of material wait, production time and shipping, which is why MTO suits products with high variety, high value or short shelf life.

Make-to-stock (MTS) is the opposite: build to forecast, ship from shelf, quick delivery, risk of obsolete inventory. Many plants use both, or an in-between such as assemble-to-order, where common subassemblies are stocked and final assembly waits for the order.

ERPs support MTO through order-to-job linkage. In Infor SyteLine, a customer order line can be linked to a job order so the job is tied to that demand. In SAP, make-to-order strategy 20 with sales order stock keeps supply segregated per order, and Business Central uses order-to-order planning with a Reserve Always setting. Infor LN uses sales order pegging for the same purpose.

The weakness of MTO is lead time, since the customer waits for the whole build. Reducing it means holding strategic component stock, shortening routings and improving supplier reliability. Capable-to-promise logic helps by checking capacity and materials rather than just stock when committing a date.

## Why It Matters

- It reduces finished goods inventory and the obsolescence risk of building to forecast.
- Customer lead time becomes a competitive variable that planning must control.
- Order-to-job linkage ensures materials and capacity are reserved for the right customer.
- Choosing MTO versus MTS per item affects working capital, service level and planning complexity.

## In Practice

A cabinet maker offers 300 finish and size combinations. Holding stock of all is impractical, so it keeps raw panels and hardware and builds on order. A new sales order creates a job linked to the order, panels are cut in two days, assembly takes three, and shipping adds two. The promised date of 7 working days is only reliable if panel stock and assembly capacity are checked at order entry.

## Faq

### What is the difference between make-to-order and make-to-stock?

**Answer:** Make-to-stock builds against a forecast and ships from inventory. Make-to-order builds only after a customer order, trading longer lead time for lower finished goods stock.

### What is assemble-to-order?

**Answer:** A hybrid where components or subassemblies are stocked and final assembly starts when the order arrives, shortening lead time compared with full make-to-order.

### Which industries use MTO?

**Answer:** Furniture, industrial equipment, electronics with high variety, custom packaging and many job shop operations.

### How does the ERP link an order to production?

**Answer:** Through order-to-job or order-to-order links, such as SyteLine job-to-order linking or SAP sales order stock, which reserve supply for that specific demand.

## Search terms

make to order, mto manufacturing, mto vs mts, make to order vs make to stock, build to order, assemble to order, mto erp, make to order strategy

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
