# Nadcap

> Source: https://netray.co/glossary/nadcap
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

Nadcap is the National Aerospace and Defense Contractors Accreditation Program, run by the Performance Review Institute (PRI), that audits and accredits suppliers of special processes such as heat treating, non-destructive testing, welding, chemical processing and coatings.

## Aliases

- NADCAP accreditation
- National Aerospace and Defense Contractors Accreditation Program
- special process accreditation

## Category

compliance

## Full Definition

Special processes are processes whose result cannot be fully verified by inspecting the finished part, so control of the process itself is critical. Primes and large aerospace manufacturers created Nadcap so that one industry-standard audit, with detailed checklists per process, replaces many duplicate customer audits. Suppliers are audited by approved auditors and accreditation is granted by task groups of subscribing customers.

Accreditation is scoped by commodity, for example heat treating, chemical processing, non-destructive testing, welding, materials testing laboratories, coatings or sealants. Audit checklists add process-specific requirements on top of the quality system baseline, which is typically AS9100 or AS9104 related certification. Audit scheduling and findings run through PRI's eAuditNet portal, and suppliers that perform well can earn merit status with longer audit cycles.

Accreditation does not replace customer approval. A prime may still require its own flow-down, approved process specifications and source approval. A Nadcap-accredited sub-tier is usually a purchasing prerequisite, so ERPs commonly carry an approved supplier list with accreditation scope and expiry dates per vendor and per process.

Inside the ERP, special process control shows up as routing operations flagged as outsourced special processes, purchase order lines carrying the specification and revision, receiving inspection that checks supplier certifications, and holds on lots until process certificates are received and verified.

## Why It Matters

- Buying a special process from a supplier with lapsed accreditation can invalidate every part processed and force rework or scrap.
- Many primes make Nadcap accreditation a condition of award for specific processes, so it affects who can bid.
- Audit findings must be closed on a deadline, so tracking corrective actions and expiry dates in a system beats spreadsheets.
- Process certificates are legal evidence in the product record and must follow the lot or serial through to shipment.

## In Practice

Example: a machine shop routes a titanium housing out for anodizing. The routing operation is flagged as an outsourced special process, the PO line states the specification and revision, and the vendor master shows chemical processing accreditation valid until a stated date. At receiving, the certificate of conformance is attached to the lot. If the vendor's accreditation expired last month, the ERP should block the PO release or at least warn the buyer. The usual gotcha is an approved supplier entry that is checked once at onboarding and never re-verified.

## Faq

### Is Nadcap the same as AS9100?

**Answer:** No. AS9100 certifies a quality management system. Nadcap accredits specific special processes against detailed process checklists. Many Nadcap participants also hold AS9100 certification.

### Who runs Nadcap?

**Answer:** Nadcap is managed by the Performance Review Institute (PRI). Subscribing aerospace and defense companies set the requirements through industry task groups and approve accreditation.

### Do I need Nadcap to be an aerospace supplier?

**Answer:** Only for the special processes your customers require it for. Many parts suppliers do not hold Nadcap themselves but must buy special processes from accredited vendors when their customer demands it.

## Search terms

Nadcap accreditation, Nadcap special processes, Nadcap vs AS9100, PRI eAuditNet, Nadcap heat treat NDT, Nadcap approved supplier list, special process control, Nadcap merit status

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
