# NetSuite Advanced Manufacturing

> Source: https://netray.co/glossary/netsuite-advanced-manufacturing
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

NetSuite Advanced Manufacturing is the NetSuite feature set that adds routings, manufacturing work centers, operation-level work orders, finite scheduling, BOM and routing revisions, and WIP tracking, beyond basic assembly items with simple bills of materials.

## Aliases

- NetSuite Manufacturing Edition
- NetSuite Advanced BOM

## Category

manufacturing

## Full Definition

NetSuite offers manufacturing in layers. Basic Assembly/Bill of Materials lets you build assembly items from components. The Work Orders and Assemblies feature adds work orders and completions. Advanced Manufacturing adds Manufacturing Routing records, Manufacturing Cost Templates, work centers with capacity, and operation-level work order scheduling, so labor and machine time are planned per step.

Under Advanced BOM, items have BOM records with revisions that carry effective dates and, optionally, routings that list operations with setup and run times. Work Order Issue, Work Order Completion and Work Order Close record material and labor, while WIP accounts are relieved and variances posted at close. Planning is done with Supply Planning, which creates planned work orders and purchase orders.

It suits discrete, make-to-order and assemble-to-order manufacturers. Heavy process, deep finite scheduling or complex shop-floor execution often need a third-party MES or scheduler that integrates through SuiteTalk or RESTlets, and this is a common architecture decision during selection.

## Why It Matters

- Which manufacturing tier is licensed decides whether routings, work centers and operation-level reporting exist, so confirm it before blaming data quality.
- WIP and variance accounting at work order close drives gross margin; wrong BOM revisions silently distort cost.
- Capacity and scheduling in NetSuite are lighter than dedicated APS tools, which affects promise dates.
- Integration with MES and quality systems is usually needed, creating data mapping work.

## In Practice

A machine shop builds a bracket with three operations: cut, deburr, and anodize (outsourced). The routing defines run time per unit at each work center. A work order for 200 units schedules the operations, labor is booked by operation on completion, and at close a labor efficiency variance shows that deburr ran about 15 percent over the routing standard, prompting a routing update.

## Faq

### Does NetSuite have a manufacturing module?

**Answer:** Yes. NetSuite includes assembly and work order functionality, with an Advanced Manufacturing layer for routings, work centers and operation-level scheduling.

### Is NetSuite a good fit for complex discrete manufacturing?

**Answer:** It fits many mid-market discrete and assemble-to-order shops. Very complex scheduling or shop-floor execution usually requires an add-on MES or APS system.

### Where are WIP variances posted?

**Answer:** At Work Order Close, NetSuite relieves WIP and posts material, labor and overhead variances to the configured variance accounts.

## Search terms

netsuite advanced manufacturing, netsuite manufacturing routing, netsuite work order, netsuite bom revision, netsuite work center, netsuite wip, netsuite manufacturing edition

---