# OTIF (On-Time In-Full)

> Source: https://netray.co/glossary/otif
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

OTIF (On-Time In-Full) is the percentage of order lines or orders delivered on the agreed date and in the complete ordered quantity. A line that is late or short counts as a miss, so OTIF is stricter than on-time delivery alone.

## Aliases

- on time in full
- OTIF delivery
- on-time-in-full rate

## Category

manufacturing

## Full Definition

OTIF combines two tests into one pass or fail per order line: did the shipment arrive within the agreed delivery window, and did it contain the full ordered quantity. Both conditions must be true. A line shipped one day late, or shipped 98 of 100 pieces, is a failure.

The calculation is simple, but the definitions are not. You must decide the date basis (customer request date, promise date, or the original promise), the tolerance window (for example zero days early, zero days late, or a retailer-mandated window), the quantity tolerance (exact, or plus or minus a percentage), and the grain (order line, order header, or shipment). Two companies reporting 95 percent OTIF can be measuring very different things.

In ERPs the data comes from the sales order line and the shipment record. In Infor SyteLine it sits on the customer order line (coitem) against the packing slip and ship transactions; in NetSuite it comes from sales order lines and item fulfillments; in Infor LN it comes from sales order lines and outbound shipment lines. The promise date field you choose matters most.

OTIF is a lagging customer-facing metric. It rolls up the effect of planning accuracy, supplier performance, production schedule adherence and warehouse execution, so a drop tells you something broke but not what. It is usually read together with fill rate, schedule adherence and lead time metrics.

## Why It Matters

- Large retailers and OEM customers often fine suppliers for OTIF misses, so the number has direct financial consequences.
- It exposes problems that average-lateness reports hide, such as partial shipments that look on time.
- A consistent definition lets sales, planning and operations argue about causes instead of about the metric.
- It feeds supplier scorecards in reverse: it is the same measure your own customers apply to you.

## In Practice

A plant ships 400 order lines in a month. 340 arrive on the promise date at full quantity, 30 arrive on time but short, 25 arrive late but complete, and 5 are late and short. OTIF is 340 / 400 = 85 percent. On-time delivery alone would read (340 + 30) / 400 = 92.5 percent, which hides the shortage problem. Fixing the 30 short lines (usually a scrap or yield issue) lifts OTIF more than chasing the late ones.

## Faq

### How is OTIF different from on-time delivery?

**Answer:** On-time delivery checks only the date. OTIF also requires the full ordered quantity, so short shipments count as failures. OTIF is always equal to or lower than on-time delivery.

### What is a good OTIF target?

**Answer:** It depends on the customer contract and industry. Many retail and OEM agreements specify a target in the 90 to 98 percent range. Use the number in your customer agreement, not a generic benchmark.

### Which date should OTIF be measured against?

**Answer:** Use the date the customer holds you to, usually the confirmed promise date or the customer request date. Measuring against a re-promised date flatters the number and is a common reporting trap.

## Search terms

OTIF meaning, on time in full, OTIF calculation, OTIF formula, OTIF ERP report, on-time delivery vs OTIF, OTIF KPI manufacturing, OTIF fines suppliers

---