# Request for Quotation (RFQ)

> Source: https://netray.co/glossary/request-for-quotation
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

A request for quotation (RFQ) is a document sent to several suppliers asking them to quote price, lead time and terms for specified items or services. The buyer compares the responses and awards one as a purchase order or contract.

## Aliases

- RFQ
- request for quote
- RFP vs RFQ

## Category

erp-core

## Full Definition

An RFQ is used when the buyer knows exactly what they want and needs the market to price it. It lists items or drawings, quantities, required dates and commercial terms, and is sent to a short list of qualified suppliers. It differs from an RFP, which asks suppliers to propose a solution, and from an RFI, which only gathers information.

In ERP the RFQ is the step between a requisition and a purchase order. SAP has RFQ creation in ME41, supplier quotation entry in ME47 and a price comparison report before awarding. NetSuite supports vendor request for quote with Advanced Procurement, and Odoo creates a request for quotation in the Purchase app that becomes a purchase order once confirmed. Many SyteLine and Infor LN sites run the RFQ outside the ERP in email or a portal and record only the winning price.

A good RFQ comparison goes beyond unit price. It covers tooling, minimum order quantity, lead time, payment terms, freight, currency and quality history. The winning quote is then stored as a price record or contract so later purchase orders pick it up automatically.

For repeat parts, the RFQ outcome often feeds a blanket order or price agreement rather than a single PO, which avoids rerunning the process every time.

## Why It Matters

- Competitive quotes are the main lever buyers have to control spend on non-strategic parts.
- Capturing quotes in the ERP leaves an audit trail showing why a supplier was chosen.
- The awarded price becomes the default price on later purchase orders, which stops price drift.
- Comparing total landed cost, not just unit price, avoids choosing the cheapest quote that is expensive overall.

## In Practice

A buyer sends an RFQ for 2,000 brackets to four suppliers. Quotes come back at 13.90, 14.20, 14.60 and 12.80 per piece, but the 12.80 supplier has a 12 week lead time and 5,000 minimum order. Once freight and carrying cost are added, the 14.20 quote with a 4 week lead time is cheaper for the real need, and that supplier gets the PO.

## Faq

### What is the difference between an RFQ and an RFP?

**Answer:** An RFQ asks for a price on a clearly defined item. An RFP asks suppliers to propose how they would solve a problem, so evaluation covers approach and capability as well as price.

### Does an RFQ commit the buyer to purchase?

**Answer:** No. An RFQ is a request for information on price and terms. The commitment starts only when the buyer issues a purchase order or signs a contract.

### Can ERP manage RFQs or is a separate tool needed?

**Answer:** Many ERPs handle basic RFQs and quote comparison. Larger sourcing events with auctions or scoring often use a dedicated sourcing tool that posts the award back to the ERP.

## Search terms

what is an RFQ, request for quotation, RFQ vs RFP, RFQ in ERP, supplier quotation, quote comparison, RFQ process purchasing, RFQ to purchase order

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
