# RoHS (Restriction of Hazardous Substances)

> Source: https://netray.co/glossary/rohs
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

RoHS is the EU Directive 2011/65/EU restricting hazardous substances in electrical and electronic equipment. It limits lead, mercury, cadmium, hexavalent chromium, PBB, PBDE and four phthalates to set concentration limits per homogeneous material.

## Aliases

- RoHS directive
- RoHS 2
- Directive 2011/65/EU
- RoHS compliance

## Category

compliance

## Full Definition

RoHS (often called RoHS 2 after the 2011 recast) restricts ten substances in electrical and electronic equipment placed on the EU market: lead, mercury, hexavalent chromium, polybrominated biphenyls (PBB) and diphenyl ethers (PBDE) at 0.1% by weight, cadmium at 0.01%, and the phthalates DEHP, BBP, DBP and DIBP at 0.1%, the last four added by a 2015 delegated directive and applied from July 2019. Limits are applied per homogeneous material, not per finished product.

Compliance is shown through a technical file, an EU declaration of conformity and CE marking, since RoHS is one of the directives behind the CE mark. Exemptions exist for specific applications, such as certain lead uses in some alloys and glass, and they expire or get renewed on a schedule, so exemption tracking is a real data task. Many other regions have similar rules, including China's RoHS-style labeling regime and various state laws.

In an ERP, RoHS compliance is again a data-to-BOM problem. Each purchased component needs a supplier declaration or material data, a compliance status field, and any exemption reference. A multi-level BOM lets you confirm that no non-compliant part sits inside a finished good. Mid-market ERPs usually hold this in user-defined fields and attached documents; larger SAP landscapes can use product compliance functionality. Defense and aerospace programs sometimes hold leaded solder exemptions or customer-specific deviations, which makes accurate per-item status even more important.

Netray does not certify products. We help customers keep supplier declarations, BOM structure and status flags consistent and queryable, so the manufacturer can sign its own declaration with evidence.

## Why It Matters

- Non-compliant electronics can be pulled from the EU market, and distributors often demand declarations before listing parts.
- Exemption expiry dates need tracking, since a part valid last year may no longer be covered.
- Customers push RoHS flow-down clauses into purchase orders, so supplier data quality affects contract risk.
- Counterfeit or substituted components can break RoHS status, so approved vendor controls matter.

## In Practice

A PCB assembler switches to a new capacitor from an alternate vendor. Before release, the engineer checks the item's RoHS status field, finds only a declaration for the old part number, and blocks the ECO until the new declaration is attached. Without that gate, a product with unknown RoHS status could ship under an existing declaration of conformity.

## Faq

### What are the ten RoHS restricted substances?

**Answer:** Lead, mercury, cadmium, hexavalent chromium, PBB, PBDE, and the phthalates DEHP, BBP, DBP and DIBP.

### Is RoHS the same as lead-free?

**Answer:** Lead-free is one part of RoHS. RoHS also restricts several other substances, and has exemptions where lead is still allowed for specific uses.

### Does RoHS apply to my product?

**Answer:** It applies to electrical and electronic equipment in scope categories placed on the EU market. Check the category definitions and any exclusions for your product type.

## Search terms

RoHS compliance, RoHS directive, RoHS restricted substances list, RoHS exemption, RoHS vs REACH, RoHS declaration of conformity, RoHS BOM, RoHS 10 substances

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
