# Supplier Scorecard

> Source: https://netray.co/glossary/supplier-scorecard
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

A supplier scorecard is a periodic rating of a vendor against agreed measures such as on-time delivery, quality acceptance, price performance and responsiveness. It turns receipt and quality data into a score used for sourcing and corrective action.

## Aliases

- vendor scorecard
- supplier performance rating
- vendor rating
- supplier KPI

## Category

manufacturing

## Full Definition

A scorecard converts supplier behaviour into comparable numbers. The common measures are on-time delivery against the promise date, in-full delivery, quality acceptance rate or parts per million defective, price variance against the standard or contract, and responsiveness to changes and corrective action requests. Each measure gets a weight, and the weighted total gives a score and often a rating band.

Most of the inputs already live in the ERP. Delivery comes from PO promise dates and receipt dates. Quality comes from inspection results and returns to vendor. Price variance comes from the gap between PO price and standard cost. SAP has vendor evaluation with weighted criteria, Odoo and NetSuite rely on reports or saved searches, and Infor LN and SyteLine users typically build the calculation in reports or an external BI tool because the logic is customer specific.

The definition matters more than the tool. Decide whether on-time means the original promise date or the last confirmed date, how early receipts are treated, and whether the buyer's own late changes are excluded. If these are not fixed, suppliers will dispute the scores and ignore them.

Scorecards work best when reviewed with the supplier on a regular schedule, tied to consequences such as more volume, probation or requalification, and kept simple enough to read in one page.

## Why It Matters

- It gives sourcing decisions an evidence base instead of anecdotes about the last late shipment.
- Persistent low scores trigger corrective action requests and can feed supplier requalification, which several quality standards expect.
- Visible scores motivate suppliers, especially when volume depends on them.
- It connects purchasing, receiving and quality data into one view that few teams otherwise see.

## In Practice

A supplier delivered 46 of 60 lines by the confirmed date, which is about 77 percent on time. Of 12,000 pieces received, 60 were rejected, or 5,000 PPM. With weights of 40 percent delivery and 40 percent quality plus 20 percent price, the score falls into the watch band and an improvement plan is requested for the next quarter.

## Faq

### What metrics belong on a supplier scorecard?

**Answer:** Usually on-time and in-full delivery, quality acceptance or PPM, price variance, and responsiveness. Some add cost of poor quality, lead time and sustainability measures.

### How often should supplier scorecards be reviewed?

**Answer:** Monthly for data collection and quarterly for supplier reviews is common. Critical suppliers may be reviewed more often.

### Is a supplier scorecard required for ISO 9001 or AS9100?

**Answer:** Those standards require controlled evaluation and monitoring of external providers. A scorecard is a common way to show it, but the standard does not mandate a specific format.

## Search terms

supplier scorecard, vendor scorecard, supplier performance metrics, on-time delivery supplier, vendor rating ERP, supplier evaluation, supplier KPI, supplier quality rating

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
