# Third-Party Logistics (3PL)

> Source: https://netray.co/glossary/third-party-logistics
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

Third-party logistics (3PL) means outsourcing warehousing, transportation or order fulfillment to a specialist provider. The manufacturer's ERP stays the system of record for orders and cost, and exchanges inventory, shipment and receipt data with the 3PL.

## Aliases

- 3PL
- third party logistics provider
- contract logistics

## Category

integration

## Full Definition

Scope varies. A 3PL may only store and ship finished goods, or it may handle returns, kitting, labelling, customs brokerage and freight booking. The more it does, the more of your master data and order flow it needs.

Integration is the hard part. Orders and advance receipts go to the provider, and shipment confirmations, inventory snapshots and adjustments come back. This runs through EDI (such as 940/945 warehouse shipping order and advice), flat files, APIs or the provider's portal. Mapping item codes, units of measure and lot numbers must match on both sides.

In the ERP the 3PL appears as an external warehouse or consignment-style location. Infor LN supports multiple warehouses and sites, SyteLine uses warehouses and locations, and NetSuite uses locations flagged as third-party. Inventory there is still owned by you and valued in your books, so adjustments need approval and reconciliation.

A simpler tool may do. If volumes are small, a provider portal plus a daily file import can be adequate before building real-time interfaces.

## Why It Matters

- Outsourcing converts fixed warehouse cost to variable but moves control to an interface.
- Inventory held off-site is a frequent source of unexplained book-to-physical gaps.
- Customer service depends on the speed of shipment confirmation coming back.
- Contract terms on damage, accuracy and cycle counts need data from the ERP to be enforced.

## In Practice

A manufacturer ships 800 SKUs to a regional 3PL. Each night the 3PL sends an inventory snapshot. A reconciliation job compares it to the ERP location balance and flags variances over a set tolerance, so a lost pallet is discovered within a day instead of at year-end count.

## Faq

### What is the difference between 3PL and 4PL?

**Answer:** A 3PL executes logistics services. A 4PL manages and coordinates several providers and the overall supply chain design on your behalf.

### How does a 3PL connect to my ERP?

**Answer:** Typically by EDI, API or file exchange for orders, receipts, shipments and inventory. The provider's WMS is usually the system of record for bin-level stock.

### Who owns inventory at a 3PL?

**Answer:** You do, unless the contract says otherwise. It stays on your balance sheet and should be reconciled to the provider's counts regularly.

## Search terms

third-party logistics, 3PL, 3PL ERP integration, 3PL inventory reconciliation, outsourced warehousing, EDI 940 945, what is a 3PL

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
