# Vendor Managed Inventory (VMI)

> Source: https://netray.co/glossary/vendor-managed-inventory
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

Vendor managed inventory (VMI), also called vendor managed stock, is an arrangement where the supplier monitors the buyer's stock of their products and decides when and how much to replenish, within agreed minimum and maximum levels. Ownership may transfer on delivery or on use.

## Aliases

- VMI
- vendor managed stock
- supplier managed inventory
- consignment stock

## Category

manufacturing

## Full Definition

In VMI the buyer shares consumption and on-hand data with the supplier, who is responsible for keeping stock between a minimum and a maximum. The buyer stops raising purchase orders for those items. The supplier uses the data, often through EDI or a portal, to plan production and shipments.

VMI is often combined with consignment, where stock sits at the buyer's site but is owned by the supplier until the buyer consumes it. The two are different. VMI describes who decides replenishment. Consignment describes who owns the stock. SAP supports consignment stock with special stock indicator K and info records, and Odoo and NetSuite support consignment through location and ownership setups. Infor LN and SyteLine typically model VMI through blanket orders, supplier schedules and a separate consignment warehouse.

The ERP work in a VMI setup is mostly in data exchange and settlement. The buyer needs timely stock and usage feeds to the supplier, plus a trigger that creates the invoice or self-billing document when material is consumed rather than when it is delivered.

VMI suits high-volume, low-value, steady-demand items such as fasteners, packaging and standard components. It works poorly for engineered-to-order parts or where demand data is unreliable.

## Why It Matters

- It moves replenishment effort and often carrying cost to the supplier, which frees buyer time for strategic parts.
- Shared visibility reduces stockouts and the bullwhip effect between the two companies.
- Consignment variants delay payment until use, improving the buyer's working capital.
- It depends on accurate stock and usage data, so poor inventory accuracy breaks the model quickly.

## In Practice

A plant uses about 800 gaskets a week. The supplier holds a minimum of 1,200 and a maximum of 2,400 in a bin at the plant. Each night the ERP sends on-hand and usage by EDI. When on-hand falls below 1,200, the supplier ships to bring it back to 2,400, and the buyer is invoiced weekly for the quantity scanned out of the bin.

## Faq

### What is vendor managed inventory?

**Answer:** Vendor managed inventory (VMI) is a supply chain arrangement where the supplier, not the buyer, decides when and how much to replenish the buyer's stock of the supplier's items. The buyer shares on-hand and usage data, both sides agree minimum and maximum levels, and the supplier ships to keep stock inside that band without the buyer raising a purchase order for each delivery.

### Is vendor managed stock the same as vendor managed inventory?

**Answer:** Yes. Vendor managed stock is another name for VMI, more common in UK and European usage. Both mean the supplier owns the replenishment decision. Whether the supplier also owns the stock until it is used is a separate question, answered by whether the deal includes consignment.

### How does the VMI process work step by step?

**Answer:** 1) Buyer and supplier agree the items, min and max levels, review frequency, ownership point and invoicing trigger. 2) The buyer's ERP sends on-hand, consumption and forecast data daily or more often, by EDI (for example an 852 product activity report), API or portal. 3) The supplier compares stock to the min level and plans a shipment back up toward the max. 4) The delivery is received against a blanket order or supplier schedule, or into a consignment location. 5) The buyer is invoiced on delivery, or on consumption through self-billing if the stock is consigned. 6) Both sides review fill rate, stockouts and excess on a regular scorecard.

### What are the advantages and disadvantages of vendor managed inventory?

**Answer:** Advantages: fewer purchase orders and less buyer effort, fewer stockouts, smoother supplier production, and with consignment, payment only on use. Disadvantages: dependence on accurate inventory data, loss of some control over stock levels, supplier pressure to keep levels high, integration and settlement setup effort, and it suits only steady, standard items rather than engineered or erratic-demand parts.

### What is the difference between VMI and consignment inventory?

**Answer:** VMI is about who manages replenishment decisions. Consignment is about who owns the stock. They are often combined but can exist separately.

### Who pays for the inventory in a VMI arrangement?

**Answer:** It depends on the agreement. In pure VMI the buyer may own stock on delivery. In VMI with consignment the supplier owns it until the buyer uses it.

### What data does the supplier need in VMI?

**Answer:** Typically on-hand quantity, recent consumption, min and max levels, and open requirements. It is commonly sent by EDI, API or a supplier portal.

## Search terms

vendor managed inventory, VMI, VMI vs consignment, consignment inventory ERP, supplier managed replenishment, VMI process, VMI manufacturing, VMI EDI, vendor managed stock, vendor managed inventory meaning, vendor managed inventory example, vendor managed inventory process, vendor managed inventory advantages and disadvantages

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
