# vLLM

> Source: https://netray.co/glossary/vllm
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

vLLM is an open-source inference server for large language models that uses PagedAttention memory management and continuous batching to serve many concurrent users at high throughput, exposing an OpenAI-compatible HTTP API.

## Aliases

- vLLM Inference Server
- PagedAttention

## Category

on-prem-ai

## Full Definition

The core innovation is PagedAttention. Earlier serving stacks allocated a contiguous KV cache block per request sized to the maximum possible sequence length, wasting most of it because real sequences are shorter. PagedAttention borrows the idea of virtual memory paging, storing the cache in fixed-size blocks that are allocated on demand and referenced through a block table. Memory waste drops dramatically, and the recovered capacity translates directly into more concurrent requests on the same GPU.

Continuous batching is the second pillar. Rather than assembling a batch, running it to completion, and starting the next, vLLM maintains a running batch and swaps finished sequences out for waiting ones at every decode step. Short requests are no longer stuck behind long ones, GPU utilization stays high, and tail latency improves substantially compared with static batching under mixed workloads.

Operationally, vLLM is straightforward to adopt because it presents an OpenAI-compatible REST interface. Applications written against that API can be pointed at an internal endpoint by changing a base URL and key, which makes migrating a prototype from a cloud provider to on-prem hardware a configuration change rather than a rewrite. It supports tensor parallelism across GPUs, common quantization formats, streaming responses, and serving multiple LoRA adapters over a shared base model.

It is not the only choice and not always the best one. TensorRT-LLM can deliver higher throughput on NVIDIA hardware at the cost of a compilation step and more operational complexity. llama.cpp and Ollama are far simpler for single-user or CPU-bound edge scenarios. vLLM occupies the practical middle: strong multi-user throughput with reasonable operational burden, which is why it has become a common default for on-prem enterprise serving.

## Why It Matters

- PagedAttention recovers KV cache memory that other servers waste, often multiplying concurrent user capacity on identical hardware.
- OpenAI-compatible API means moving a working prototype from cloud to on-prem is a base-URL change rather than an application rewrite.
- Continuous batching keeps short requests from queueing behind long ones, which is what makes shared department-wide use feel responsive.
- Multi-LoRA serving lets one base model in memory back several department-specific behaviors, avoiding a separate deployment per variant.

## In Practice

A team replaced a naive serving script with vLLM on unchanged hardware and saw concurrent capacity rise several times over, purely from KV cache efficiency and continuous batching. The planned GPU purchase was deferred two quarters. Measure your current server's memory waste before assuming you need more cards.

## Faq

### Is vLLM suitable for air-gapped deployment?

**Answer:** Yes. vLLM is open source and runs entirely offline once the model weights and Python dependencies are staged locally. The usual preparation is to mirror the container image, the package index, and the weight files into the enclave through your approved transfer process. There is no license server, telemetry requirement, or outbound call needed for normal operation.

### How does vLLM compare to Ollama?

**Answer:** Ollama optimizes for single-user simplicity: one command pulls and runs a model, with good CPU and consumer GPU support. vLLM optimizes for multi-user throughput on server GPUs through PagedAttention and continuous batching. Use Ollama for workstations, edge devices, and experimentation; use vLLM when a shared service must handle many concurrent users reliably.

## Search terms

what is vLLM, vLLM meaning, vLLM explained, vLLM vs TensorRT-LLM, PagedAttention continuous batching

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
