# Wrench Time

> Source: https://netray.co/glossary/wrench-time
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Glossary

## Short answer

Wrench time is the proportion of a maintenance technician's paid time spent doing hands-on work on equipment, excluding travel, waiting for parts, permits, instructions or tools, and is a common measure of maintenance productivity.

## Aliases

- tool time
- hands-on-tools time
- maintenance productivity

## Category

manufacturing

## Full Definition

Wrench time is usually measured by work sampling: observers record at random moments what each technician is doing and calculate the share that is direct work. Studies commonly report that unplanned maintenance organizations achieve a minority of the day on hands-on work, and well-planned ones achieve noticeably more. Treat any single number as a benchmark to check against your own sampling.

The losses are structural, not laziness. Typical causes are waiting for parts, searching for drawings or procedures, travel across the plant, waiting for lockout and permits, waiting for operations to release the machine, and unclear job scope. Most can be reduced by planning: a planner prepares the job plan, reserves parts, books the permit and schedules the machine release before the technician starts.

ERP and CMMS data help but do not measure wrench time directly. Work orders show hours booked, not time lost to waiting. What the system does show is planning quality: percent of work planned, parts availability at job start, and schedule compliance. Technician time recorded against work orders is often inaccurate unless the interface is easy to use on mobile devices.

Increasing wrench time by pushing technicians harder rarely works. The effective levers are planning and scheduling, kitting parts, better stores access, mobile access to job plans and clear priorities.

## Why It Matters

- Shows how much real capacity a maintenance team has before hiring or outsourcing decisions.
- Points to planning and parts problems, which are cheaper to fix than adding labor.
- Helps explain why a backlog persists even though headcount seems adequate.
- Gives a baseline for judging whether mobile CMMS or planner roles actually pay back.

## In Practice

A plant with 20 technicians samples 600 observations across two weeks. Direct hands-on work is 30 percent, with the largest losses being waiting for parts (about 20 percent) and travel and searching for information (about 15 percent). Introducing a planner who kits parts the day before and loads job plans onto tablets is aimed at those two losses. A second sampling three months later shows whether the share has moved.

## Faq

### What is a good wrench time?

**Answer:** It varies by industry and sampling method. Many reviews find reactive teams are well below half the day, and planned, scheduled teams do better. Measure your own baseline rather than relying on a quoted figure.

### Can my CMMS calculate wrench time?

**Answer:** Not directly. It can show hours booked, planned versus unplanned work and parts availability, which indicate causes. Wrench time itself is normally measured by observation or work sampling.

### What is the quickest way to improve it?

**Answer:** Planning and kitting. A planner who prepares the job plan, parts and permits before assignment removes most waiting and searching time.

## Search terms

what is wrench time, wrench time maintenance, maintenance productivity, improve wrench time, work sampling maintenance, technician productivity CMMS

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
