# Counterfeit Electronic Parts Avoidance for EMS Companies

> Source: https://netray.co/resources/counterfeit-electronic-parts-avoidance-for-ems-dfars-as5553
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Knowledge Base

## Short answer

What EMS shops must do to avoid counterfeit electronic parts: DFARS 252.246-7007 and 7008, AS5553 and AS6081, approved sources, inspection, and records.

## Category

erp-general

## Content

**Intro:** Counterfeit electronic parts avoidance for EMS companies comes down to buying from trusted sources, documenting where every part came from, inspecting when risk demands it, and keeping records that survive an audit. DFARS 252.246-7007 requires covered defense contractors to maintain a counterfeit electronic part detection and avoidance system, and 252.246-7008 sets rules on sources of electronic parts that flow to subcontractors. SAE AS5553 and AS6081 provide the industry framework. This page explains how those requirements become shop floor practices.

**Sections:**

#### What the Requirements Say, in Plain Terms

**Body:** DFARS 252.246-7007 applies to contractors subject to the Cost Accounting Standards, and it expects a system that includes training, inspection and testing, traceability, use of trusted suppliers, reporting and quarantine of suspect parts, and flow-down to subcontractors. DFARS 252.246-7008 generally directs buyers toward original manufacturers, authorized distributors, or suppliers that obtain parts from them, with limited exceptions requiring additional assessment. AS5553 covers fraudulent and counterfeit electronic parts risk mitigation for purchasers, while AS6081 addresses distributors. If you are an EMS subcontractor, expect these clauses to arrive as flow-downs in purchase orders from primes, and have your quality manager review them against your procedures.

#### Source Control: The Cheapest Defense

**Body:** The most effective control is buying from original component manufacturers and authorized distributors, and recording that choice in your approved supplier list. When shortages push you toward independent distributors or brokers, the process should require approvals, risk assessment, and additional testing, rather than a buyer making a call on a phone. Your ERP should make source type visible on the purchase order and the receiving record, and prevent receipts from unapproved sources without a documented exception. Quoting matters here as well: if estimators price from broker stock without noting the source risk, the shop commits to a build that may later require costly testing.

**Bullets:**

- Maintain an approved supplier list tied to purchasing in the ERP
- Flag purchase orders to independent or broker sources for review
- Require certificates of conformance and original manufacturer traceability
- Record source type on the receiving transaction

#### Receiving Inspection and Test Escalation

**Body:** Inspection should scale with risk. For parts from authorized sources, standard receiving checks of labels, packaging, quantity, date codes, and moisture barrier bag condition are typical. For higher risk parts, shops add external visual inspection under magnification, marking permanency tests, X-ray, decapsulation, or electrical testing, often through accredited labs working to AS6081 or IDEA-STD-1010 methods. Document what was done and the results, including negative results. Suspect parts must be quarantined, reported through the channels your contracts require, which may include GIDEP, and never returned to stock or to the supplier without a documented disposition.

#### Traceability and Records That Hold Up in an Audit

**Body:** Auditors and primes ask the same questions: where did this part come from, who handled it, what was done to verify it, and which assemblies contain it? Answering requires receiving records tied to purchase orders, lot and date code data, inspection reports, and issue transactions to jobs and serial numbers. Spreadsheets and paper travelers make this slow and error-prone. Retention periods are set by contract, and defense work often demands longer retention than commercial. Test your system by picking a component lot and timing how long it takes to list every shipped serial number that contains it.

#### Where AI Helps, and What It Should Not Decide

**Body:** AI can screen incoming purchase orders for source type, scan receiving paperwork for missing certificates, and answer traceability questions from ERP and quality records. Netray builds this privately, so defense-related data stays on your network, and keeps it read-only with a human making every disposition. It should never decide whether a suspect part is acceptable or release quarantined stock. For shops doing only commercial work with no counterfeit-related contract flow-down, a simpler approved-supplier policy and good receiving discipline are usually enough.

**Cta:** Run a traceability drill on one component lot, then bring the results to Netray, and we will show how to answer that question in seconds from your ERP and quality records.

**Faq:**

#### Does DFARS 252.246-7007 apply to small EMS subcontractors?

**Answer:** It applies directly to covered contractors subject to the Cost Accounting Standards, but the requirement to flow it down means subcontractors often receive related obligations through purchase orders. Review each flow-down with your quality manager and contracts person, and confirm what the clause or customer procedure requires of your shop.

#### Can an EMS shop buy from brokers for defense work?

**Answer:** Only under the conditions your contract allows. DFARS 252.246-7008 prefers original manufacturers and authorized distributors, with limited exceptions that require additional assessment and testing. Brokers should be a controlled exception with documented risk assessment, inspection, and customer awareness rather than a routine purchasing path.

#### What is the difference between AS5553 and AS6081?

**Answer:** AS5553 is a standard for fraudulent and counterfeit electronic parts risk mitigation aimed at purchasers such as manufacturers and EMS companies. AS6081 covers the same risk for distributors, including their inspection and test requirements. Together they describe controls on both sides of a transaction.

## Related Slugs

- lot-traceability-electronics-manufacturing
- supplier-risk-management-manufacturing
- itar-compliant-ai-tools-manufacturing
- cmmc-compliant-ai-deployment

## Search terms

counterfeit electronic parts avoidance, DFARS 252.246-7007, DFARS 252.246-7008, AS5553 EMS compliance, AS6081 distributor, counterfeit parts procedure contract manufacturer

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
