# How to Set Up Inspection Plans in SyteLine

> Source: https://netray.co/resources/how-to-set-up-syteline-inspection-plans
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Knowledge Base

## Short answer

Step-by-step guide to configuring inspection plans in Infor SyteLine. Define sampling rules, inspection operations, quality characteristics, and pass/fail criteria for incoming, in-process, and final inspections.

## Category

syteline

## Content

**Intro:** Inspection plans in SyteLine define the quality checks performed on materials and products at various stages of manufacturing. Properly configured inspection plans ensure consistent quality enforcement across receiving, in-process, and final inspection points. This guide walks you through creating inspection plans, assigning quality characteristics, and linking them to items and operations within the SyteLine Quality module.

**Sections:**

#### Creating Inspection Plan Headers

**Body:** Navigate to Quality > Inspection Plans to access the Inspection Plan form. Each plan requires a unique plan ID, revision level, and effective date range. You can associate plans with specific items, item groups, or vendor-item combinations. The plan header also defines the inspection type, receiving, in-process, or final, and the default disposition codes for accepted and rejected materials. Set the AQL (Acceptable Quality Level) at the header level to establish the baseline sampling standard per ANSI/ASQ Z1.4.

**Bullets:**

- Access the form via Quality > Inspection Plans and create a new plan with unique ID and revision
- Set the inspection type field to Receiving, In-Process, or Final to control when inspections trigger
- Define AQL levels (0.065 to 6.5) and sampling plan references on the header for lot-based inspection
- Link the plan to specific items using the Item/Inspection Plan cross-reference form

#### Defining Quality Characteristics and Tests

**Body:** Within each inspection plan, add quality characteristics that define what gets measured or evaluated. Navigate to the Characteristics tab to add variable measurements (dimensions, weight, temperature) or attribute checks (visual, pass/fail). Each characteristic requires a target value, upper and lower specification limits, and the measurement unit. For variable data, configure the control chart type (X-bar/R or X-bar/S) and subgroup size. SyteLine supports linking characteristics to gauge IDs for calibration traceability per ISO 10012.

**Bullets:**

- Add variable characteristics with target values, USL/LSL tolerances, and measurement units
- Configure attribute characteristics for visual or go/no-go inspections with accept/reject counts
- Set sampling frequency rules, 100% inspection, skip-lot, or AQL-based sampling per characteristic
- Link each characteristic to a specific gauge or instrument ID for calibration traceability

#### Assigning Plans to Operations and Triggering Inspections

**Body:** Inspection plans must be linked to production operations or purchase order receiving steps to trigger automatically. Use the Item/Inspection Plan form to associate plans with routing operations by specifying the operation number and work center. For receiving inspections, link plans through Vendor/Item parameters so inspections generate automatically when PO receipts post. Configure the Results Entry form preferences to enable barcode scanning for shop floor data collection. The system generates inspection orders with lot tracking and supports SPC (Statistical Process Control) chart generation from collected data.

**Bullets:**

- Link plans to routing operations via Item/Inspection Plan cross-reference with operation sequence numbers
- Enable auto-generation of inspection orders on PO receipt by setting vendor/item inspection flags
- Configure the Inspection Results Entry form for shop floor data collection with barcode support
- Review SPC charts and Cpk/Ppk capability indices from Quality > Analysis > Capability Studies

**Cta:** Need help implementing SyteLine inspection plans that comply with your industry quality standards? Netray consultants specialize in SyteLine quality module configuration for aerospace, automotive, and medical device manufacturers.

**Faq:**

#### Can SyteLine inspection plans support skip-lot inspection?

**Answer:** Yes, SyteLine supports skip-lot inspection through the Sampling Plan configuration. You can define skip-lot rules based on consecutive lot acceptance history, typically after 5-10 consecutive accepted lots, the system automatically reduces inspection frequency. The skip-lot level resets to full inspection after any lot rejection, following ANSI/ASQ Z1.4 switching rules for normal, tightened, and reduced inspection.

#### How do inspection plans integrate with SyteLine non-conformance reports?

**Answer:** When inspection results fail the defined acceptance criteria, SyteLine automatically generates a non-conformance report (NCR) linked to the inspection order. The NCR captures the defect type, quantity rejected, characteristic that failed, and measured values. Disposition options include return-to-vendor, rework, scrap, or use-as-is with engineering approval. Each NCR links back to the originating inspection plan for root cause traceability.

#### What sampling standards does SyteLine support for inspection plans?

**Answer:** SyteLine supports ANSI/ASQ Z1.4 (attributes) and Z1.9 (variables) sampling standards natively. You can configure inspection levels I through III, with special inspection levels S-1 through S-4 for destructive testing. Custom sampling tables can also be defined for industry-specific requirements. The system maintains lot size ranges from 2 to 500,000+ units with corresponding sample sizes and accept/reject numbers.

## Related Slugs

- how-to-configure-syteline-non-conformance-reports
- how-to-set-up-syteline-calibration-management
- how-to-set-up-syteline-iso-9001-workflows

## Search terms

syteline inspection plans, syteline quality module setup, syteline AQL sampling configuration, infor syteline inspection orders, syteline quality characteristics

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
