# SyteLine User Network Conference and User Group Events in 2026

> Source: https://netray.co/resources/syteline-user-group-events-2026
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Knowledge Base

## Short answer

SyteLine user events in 2026: the SyteLine User Network (SUN) annual conference, regional groups, virtual meetups, and how admins get answers on upgrades and IDOs.

## Category

ai-automation

## Content

**Intro:** SyteLine user group events are regional and virtual gatherings where Infor SyteLine and CloudSuite Industrial customers share upgrade experiences, customization techniques, and vendor evaluations without marketing filters. The largest is the SyteLine User Network (SUN) annual conference; the 36th was held in Atlanta on March 2-4, 2026. In 2026 the ecosystem includes regional in-person groups in the Midwest and Southeast, virtual quarterly meetups organized through the Infor Community and LinkedIn, and user-led tracks at Inforum. For ERP administrators, these events are the highest-signal venue available: a two-hour session with peers who completed a SyteLine 9-to-10 upgrade or a CloudSuite migration is worth more than most paid consulting hours. This guide covers where to find groups, what 2026 agendas look like, and how to contribute.

**Sections:**

#### Finding Active SyteLine User Groups in 2026

**Body:** Start with the Infor Community site, which hosts the official CloudSuite Industrial discussion forums and lists user-group activity, then check LinkedIn, where SyteLine user groups with thousands of members post regional meetup announcements. The Midwest has historically hosted the strongest in-person SyteLine community, with meetings rotating through manufacturer sites in Wisconsin, Illinois, Michigan, and Ohio; host-site meetings typically include a plant tour, which alone justifies attendance. Infor channel partners also sponsor regional customer days that function as de facto user groups, though expect some sales content. If no group exists within driving distance, the virtual quarterly meetups that emerged after 2020 remain active and free, usually running 90 minutes with one customer presentation and open Q&A.

**Bullets:**

- Infor Community forums: official starting point for CloudSuite Industrial user activity
- LinkedIn SyteLine groups: regional meetup announcements and candid version-upgrade threads
- Partner-hosted customer days: free regional events, useful despite some sales content
- Virtual quarterly meetups: 90-minute sessions, free, best option outside the Midwest

#### What 2026 User Group Agendas Are Covering

**Body:** Three topics dominate 2026 agendas. First, upgrade and migration war stories: SyteLine 9.x to 10.x moves, on-prem to CloudSuite Industrial multi-tenant migrations, and the real costs behind them, with customers regularly reporting six-figure deltas between vendor estimates and actuals. Second, extensibility in the cloud era: what happens to years of IDO extensions, form personalizations, and Mongoose customizations when you migrate, and which patterns survive. Third, AI: nearly every group now runs sessions on Infor GenAI availability, third-party AI agents, and what peers have piloted for quote automation and order entry. Defense-heavy groups add CMMC 2.0 compliance segments, since assessment timelines began hitting DoD contracts in 2025 and ERP environments sit squarely in scope.

**Bullets:**

- Upgrade retrospectives: SyteLine 9-to-10 and CloudSuite migrations with real cost figures
- Customization survival: which IDO extensions and personalizations carry into multi-tenant
- AI pilots: peer reports on GenAI, agents, and automation of quoting and order entry
- CMMC 2.0 sessions: ERP scoping, enclave strategies, and assessment preparation timelines

#### Getting Value: Contribute, Do Not Just Consume

**Body:** User groups reward participants who bring something. Presenting a 20-minute session on a problem you solved, even a modest one like automating a report distribution with Application Event System triggers or cleaning up a planning parameter mess, earns you a network of peers who will answer your questions for years. Prepare one-page handouts with actual configuration screenshots, since attendees consistently rate concrete artifacts above polished slides. Bring your unsolved problems too: the standard format includes open-forum time where someone in the room has usually already hit your exact error. Exchange contact information deliberately; the durable value of a user group is the five people you can email when a MRP run misbehaves at month-end, not the sessions themselves.

#### User Groups Versus Inforum: Budget for Both Differently

**Body:** Inforum costs $3,500-$5,000 per person and delivers roadmap and executive access; user group meetings cost $0-$200 plus mileage and deliver unfiltered peer truth. They answer different questions. Use Inforum to learn what Infor intends to ship and to negotiate; use user groups to learn what actually happened when peers deployed it. A practical 2026 plan for a mid-size SyteLine shop: two regional user group meetings, the virtual quarterlies, and Inforum every other year unless a major migration decision is pending. CFOs approving travel budgets should note that user group intelligence routinely saves real money, for example when peer cost data arms you for maintenance renewal or migration negotiations with figures Infor account teams do not volunteer.

#### Netray at SyteLine User Groups: Ask Us the Hard Questions

**Body:** Netray team members participate in SyteLine community events because our AI agents live in the same environments user groups discuss: on-prem SyteLine 9 and 10, CloudSuite Industrial, and hybrid estates. If you see us at a 2026 meeting, bring your hardest integration question, whether it is automating order entry against IDO endpoints, building an AI agent that drafts quotes from historical pricing, or keeping every byte of CUI inside your firewall for CMMC 2.0. We publish what we learn, and we offer user group members a free two-hour AI readiness assessment that maps your SyteLine customizations and data quality against realistic agent use cases, with typical customers reaching a production agent in 60-90 days after scoping.

**Cta:** Active in a SyteLine user group? Claim Netray's free two-hour AI readiness assessment and bring the results to your next meeting.

**Faq:**

#### Are there still active SyteLine user groups in 2026?

**Answer:** Yes. The Infor Community site hosts official CloudSuite Industrial forums, LinkedIn SyteLine groups post regional meetup announcements, and in-person groups remain active in the Midwest, rotating meetings through manufacturer host sites. Virtual quarterly meetups, typically free 90-minute sessions with a customer presentation and open Q&A, serve admins outside driving distance of regional groups. Infor channel partners also run regional customer days that function as user groups.

#### What do SyteLine user groups cost to attend?

**Answer:** Most SyteLine user group meetings cost nothing or a nominal $50-$200 fee to cover lunch and facilities, plus your travel, which is usually a drive rather than a flight for regional meetings. Virtual quarterly meetups are free. Compare that with Inforum at $3,500-$5,000 per person all-in, and user groups are the highest-ROI professional development available to a SyteLine administrator.

#### What topics do SyteLine user groups cover in 2026?

**Answer:** The dominant 2026 topics are upgrade retrospectives covering SyteLine 9-to-10 and CloudSuite Industrial migrations with real cost data, customization survival for IDO extensions and Mongoose personalizations in multi-tenant cloud, AI pilots including Infor GenAI and third-party agents for quoting and order entry, and CMMC 2.0 compliance scoping for defense suppliers whose ERP environments hold CUI.

## Related Slugs

- inforum-2026-guide-infor-customers
- manufacturing-ai-conferences-2026
- agentic-ai-erp-2026-outlook

## Search terms

SyteLine user group 2026, CloudSuite Industrial user group events, SyteLine user community meetings, Infor SyteLine networking events, SyteLine admin user group agenda

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
