# E2 Shop System: E2 shop management software, modules and alternatives

> Source: https://netray.co/software/eci-e2-shop-system
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Manufacturing Software Encyclopedia

## Short answer

E2 Shop System (often searched as E2 software or E2 manufacturing software) is shop management software and a job shop ERP from ECI Software Solutions, originally developed by Shoptech. It covers estimating, order entry, production control, purchasing, inventory and shipping for custom and make-to-order manufacturers.

## Vendor

ECI Software Solutions

## Category

erp

## Aliases

- E2 Shop System
- E2 Shop
- Shoptech E2
- E2

## Overview

E2 Shop System is aimed at manufacturers that build to customer order: machine shops, fabricators, tool and die shops, and other custom producers. It follows a quote, order, job, ship flow, and ties materials, labor and outside services to each job so owners can see what a job cost against what was quoted.

The product originated at Shoptech and is now part of the ECI Software Solutions portfolio, which also includes JobBOSS2. E2 has a long installed base, and many users have run it for years with customizations and reports built around their own routines. Typical users are estimators, schedulers, production supervisors, buyers and shipping staff, with accounting handled in the product or in an external package depending on setup.

In a manufacturing stack, E2 is normally the system of record for jobs, parts, customers, vendors and inventory. It exchanges data with CAD/CAM, accounting, quality and shipping tools, and shops often add barcode and data collection hardware on the floor. Because installations vary widely in version and customization, an accurate picture of one shop's E2 requires looking at its actual configuration.

## Best For

- Custom job shops and make-to-order manufacturers with changing routings and customers
- Machine shops, fabricators and tool and die shops that quote every job
- Manufacturers with long-running E2 installations and tailored reports they rely on
- Small and mid-sized companies wanting job costing without a heavy enterprise rollout
- Teams that want estimating and production control tied closely to purchasing and shipping

## Modules

### Estimating

**Description:** Builds quotes from materials, operations, outside services and overhead, with the ability to reuse past estimates.

### Order management

**Description:** Converts quotes to sales orders, tracks releases, delivery dates and customer requirements.

### Production control and scheduling

**Description:** Manages job routings, work center loading, priorities and release of work to the floor.

### Shop floor data collection

**Description:** Collects labor and job progress via terminals or devices to support actual cost and status tracking.

### Purchasing and inventory

**Description:** Handles purchase orders, receiving, material allocation, stock levels and outside processing.

### Shipping and invoicing

**Description:** Supports packing, shipments, and billing data tied to orders and jobs.

### CRM and quality tools

**Description:** Depending on version and add-ons, includes customer tracking and quality or inspection records.

## Deployment

Traditionally installed on customer-managed servers with Windows clients, with hosted options available through ECI or partners depending on contract. Confirm current options and version support with the vendor.

## Integrations

### Database

**Detail:** E2 has historically used Microsoft SQL Server. Reporting tools commonly read from it. Direct writes can break business rules, so use supported interfaces where they exist.

### CAD/CAM and engineering

**Detail:** Part data and bills of material can be exchanged with CAD, CAM and nesting systems through import files or add-on connectors.

### Accounting

**Detail:** Accounting is handled inside the product in some configurations and in an external package in others, with transaction exchange between them.

### Data collection hardware

**Detail:** Barcode scanners, terminals and machine monitoring can feed labor and status into jobs.

### Reports and exports

**Detail:** Custom reports, spreadsheet exports and scheduled data pulls are widely used to feed BI and planning tools. Confirm API availability for your version.

## Strengths

- Strong fit for quote-driven custom manufacturing
- Job costing tied directly to estimating, purchasing and shop floor time
- Long track record and a large pool of experienced users and consultants
- Practical for shops that want a focused system rather than a broad enterprise suite
- Flexible reporting for teams that invest in tailored reports

## Limitations

- Older client-server architecture can make remote access, upgrades and integrations more work than with cloud-native systems
- Heavily customized installations can be hard to upgrade or document
- Less suited to high-volume repetitive, process manufacturing or complex multi-site operations
- Modern API and cloud integration options depend on version and add-ons

## Alternatives

- ECI JobBOSS2
- ProShop ERP
- Global Shop Solutions
- Epicor Kinetic
- Plex Smart Manufacturing Platform
- Odoo

## Ai Opportunities

- Propose quotes by retrieving similar past estimates and actual hours for an estimator to adjust
- Answer questions about open orders, late jobs and material shortages in plain language over read-only data
- Explain what a custom report or legacy customization actually does by reading its definition
- Extract data from customer purchase orders and drawings into draft orders for human confirmation
- Help plan an upgrade or migration by inventorying customizations, reports and integrations in use

## Selection Tips

- Identify your E2 version and every customization before comparing it with other systems or planning upgrades
- Ask ECI which hosting, support and upgrade paths exist for your version
- Test estimating and scheduling with real parts and routings during any demo
- Check how accounting is handled and how it reconciles with job costing
- Document integrations to CAD/CAM, shipping and reporting tools before any change
- Compare E2 and JobBOSS2 against your own process, not feature lists

## Faq

### What is E2 Shop System?

**Answer:** E2 Shop System is an ERP and production management product for job shops and custom manufacturers. It handles estimating, orders, scheduling, shop floor tracking, purchasing, inventory and shipping, and it ties costs to each job. It was developed by Shoptech and is now sold by ECI Software Solutions.

### Who owns E2 Shop System?

**Answer:** ECI Software Solutions markets and supports E2 Shop System. The product originated at Shoptech, whose product line became part of ECI. For current licensing, support terms and hosting options, ask ECI or an authorized reseller, as these can change.

### What does E2 shop management software do day to day?

**Answer:** In daily use, E2 manufacturing software runs the quote to cash flow for a custom shop: estimators build quotes from materials, routings and outside services, orders become jobs with routings released to work centers, operators log labor against jobs, buyers raise purchase orders for material and outside processing, and shipping creates packing lists and invoice data. Managers then compare actual job cost against the original estimate to see which work is profitable.

### How should I evaluate ECI as a job shop software company?

**Answer:** ECI Software Solutions owns several job shop products, including E2 Shop System, JobBOSS2 and M1, so start by asking which product ECI recommends for your shop and why. Then check the roadmap and support commitment for that specific product, hosting and upgrade options for your version, the API and data export methods available, and the cost of migrating if you move between ECI products later. Run a real part through quoting, scheduling, shop floor tracking and shipping in the demo, and speak with shops of similar size and process mix.

### Is E2 the same as JobBOSS2?

**Answer:** No. Both are ECI job shop products with different histories and interfaces. They overlap in purpose. Choosing between them depends on your processes, existing data, integrations and the vendor's guidance for your situation, so evaluate both against a real workflow.

### Can E2 integrate with other systems?

**Answer:** Yes, typically through database reporting, file imports and exports, and add-on connectors. Capabilities depend on your version. Verify which APIs and supported methods exist before designing integrations with CAD/CAM, accounting, shipping or analytics tools.

### Where can AI help E2 users?

**Answer:** AI helps most with quote drafting from history, natural-language questions over jobs and inventory, document extraction from purchase orders, and explaining legacy customizations. Keep access read-only at first, show the underlying query, and require approval for writes. On-premises models can be used when data must stay local.

## Search terms

what is E2 Shop System, E2 Shop System modules, E2 Shop System alternatives, E2 Shop System api, E2 Shop System vs JobBOSS2, Shoptech E2, E2 job shop ERP, E2 Shop System AI, ECI E2 review, E2 estimating software, E2 shop management software, E2 manufacturing software, E2 software, E2 shop system, ECI job shop software

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
