# What is ECI JobBOSS2? Modules, integrations and alternatives

> Source: https://netray.co/software/eci-jobboss2
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Manufacturing Software Encyclopedia

## Short answer

ECI JobBOSS2 is an ERP system from ECI Software Solutions aimed at small and mid-sized job shops and custom manufacturers. It covers quoting, job costing, scheduling, shop floor tracking, inventory and purchasing. It is the current generation of the long-running JobBOSS product line.

## Vendor

ECI Software Solutions

## Category

erp

## Aliases

- JobBOSS2
- JobBOSS 2
- JobBOSS squared
- JobBOSS

## Overview

JobBOSS2 is built around the job as the central record. A shop quotes work, converts the quote into a job with routings and materials, schedules it through work centers, collects labor and machine time on the floor, and compares actual cost to estimate once the job ships. That job-centric model matches how make-to-order machine shops, fabricators and contract manufacturers think about their business.

ECI Software Solutions sells several manufacturing products, and JobBOSS2 sits in the job shop segment alongside its other shop systems. Typical users are owner-operators, estimators, schedulers, shop supervisors and bookkeepers in companies that run a few dozen to a few hundred employees, often with CNC machining, sheet metal, welding or assembly operations and a high mix of one-off or low-volume orders.

In a manufacturing stack, JobBOSS2 usually acts as the system of record for jobs, parts, customers and costs. CAD/CAM and nesting tools feed it part and material data, accounting may live inside the product or in a separate package depending on how the shop is configured, and inspection, CRM or shipping tools connect around it. Scope varies by edition and by how the vendor or reseller packages it, so confirm what is included in the quote you receive.

## Best For

- Make-to-order machine shops, fabricators and contract manufacturers with high-mix, low-volume work
- Shops that quote frequently and need estimate-to-actual job cost visibility
- Small and mid-sized manufacturers outgrowing spreadsheets or entry-level accounting software
- Teams that want a job-focused ERP without the implementation weight of a large enterprise suite
- Companies replacing an older JobBOSS installation and wanting a continuation of the same product family

## Modules

### Estimating and quoting

**Description:** Builds quotes from materials, operations, outside services and markups, and converts accepted quotes into jobs.

### Job and order management

**Description:** Tracks sales orders, jobs, routings, bills of material, revisions and due dates through to shipment.

### Scheduling

**Description:** Loads operations onto work centers and gives schedulers and supervisors a view of capacity, priorities and late jobs.

### Shop floor data collection

**Description:** Captures labor, machine time and job progress from terminals or devices on the floor to feed job costing.

### Inventory and purchasing

**Description:** Manages stock, material allocation, purchase orders, receiving and outside processing.

### Job costing and reporting

**Description:** Compares estimated and actual material, labor and overhead per job and supports operational reports.

### Financials and accounting integration

**Description:** Depending on edition and configuration, covers general ledger, payables and receivables or exchanges data with a separate accounting package.

## Deployment

Offered by ECI in cloud-hosted and customer-hosted forms, depending on the edition and contract. Confirm current hosting options, upgrade responsibility and database ownership with the vendor or reseller.

## Integrations

### Database access

**Detail:** The product has historically stored data in Microsoft SQL Server. Read access for reporting is common, but direct writes bypass business logic and should be avoided. Confirm supported access with the vendor.

### CAD/CAM and nesting

**Detail:** Shops commonly exchange part numbers, bills of material and material data with CAD, CAM or nesting software through import files or integration tools.

### Accounting

**Detail:** Where accounting is not used inside the product, job and invoice data can be exchanged with an external accounting package.

### Shop floor devices

**Detail:** Data collection terminals, barcode scanners and machine monitoring tools feed labor and progress data into jobs.

### APIs and file exchange

**Detail:** Integration is typically through vendor-provided interfaces, scheduled imports and exports, or third-party connectors. Check which APIs your edition exposes before planning a project.

## Strengths

- Job-centric design that fits quote-to-ship workflows in custom manufacturing
- Clear estimate versus actual cost comparison per job
- Smaller implementation footprint than large enterprise ERP suites
- Part of a long-standing product family with an established base of job shop users
- Broad ecosystem of resellers and consultants familiar with job shop processes

## Limitations

- Less suited to repetitive, process or highly configured engineer-to-order manufacturing with deep multi-level planning
- Advanced planning, complex multi-site and multi-entity needs may require add-ons or a larger platform
- Customization depth and reporting flexibility depend on edition and tooling
- Integrations to modern cloud services can need middleware or custom work

## Alternatives

- ECI E2 Shop System
- ProShop ERP
- Epicor Kinetic
- Global Shop Solutions
- Plex Smart Manufacturing Platform
- Odoo

## Ai Opportunities

- Draft quotes by finding similar past jobs, their routings and actual hours, then proposing an estimate for an estimator to review
- Answer natural-language questions such as which open jobs are at risk of missing their due date and why
- Summarize estimate versus actual variances across jobs to show where quoting assumptions keep missing
- Read incoming purchase orders or drawings and prepare sales order data for a human to confirm
- Search job notes, inspection records and customer correspondence to answer repeat questions on a part

## Selection Tips

- Walk a real quote and a real finished job through a demo using your own routings and materials
- Ask which modules, scheduling features and APIs are in your edition and which are separate purchases
- Clarify whether accounting is inside the product or a separate system, and how the two stay reconciled
- Confirm hosting, upgrade cadence and who owns and can query the database
- Test shop floor data collection with the devices and operators you will actually use
- Ask for references from shops with a similar process mix and size

## Faq

### What is ECI JobBOSS2 used for?

**Answer:** JobBOSS2 is used by job shops and custom manufacturers to quote work, manage jobs and routings, schedule operations, collect shop floor labor and time, control inventory and purchasing, and measure job cost against estimates. It is designed around make-to-order production rather than stock-driven repetitive manufacturing.

### Is JobBOSS2 the same as JobBOSS?

**Answer:** JobBOSS2 is the current generation of the JobBOSS product line from ECI Software Solutions. Many shops still run older JobBOSS versions. Features, architecture and upgrade paths differ between versions, so ask the vendor or a reseller what a move from your current version involves.

### How does JobBOSS2 differ from E2 Shop System?

**Answer:** Both are ECI products for job shops. They have different histories, user interfaces and feature emphasis. The right choice depends on your process mix, size and integration needs, so compare both against your own workflow with the vendor rather than assuming one replaces the other.

### Can JobBOSS2 connect to other software?

**Answer:** Yes, through vendor interfaces, file imports and exports, database reporting and third-party connectors. Availability depends on edition. Plan integrations with CAD/CAM, accounting, shipping and inspection tools early, and confirm which APIs are supported before committing to a design.

### Can AI be used with JobBOSS2?

**Answer:** Yes, mainly for questions over job, quote and inventory data, quote drafting from history, and document handling. A sound approach is read-only access with visible queries and human approval before any write-back, and it can run on private infrastructure when data must stay on premises.

## Search terms

what is JobBOSS2, JobBOSS2 modules, JobBOSS2 alternatives, JobBOSS2 api, JobBOSS2 vs E2 Shop System, JobBOSS2 job costing, job shop ERP, ECI JobBOSS2 review, JobBOSS2 AI, JobBOSS2 scheduling

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
