# What is MRPeasy? Modules, integrations and alternatives

> Source: https://netray.co/software/mrpeasy
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Manufacturing Software Encyclopedia

## Short answer

MRPeasy is a cloud-based manufacturing resource planning system for small and growing manufacturers. It covers inventory, bills of materials, production planning, purchasing, sales and basic CRM, with accounting handled through connectors. It targets companies that want MRP discipline without a heavy ERP project.

## Vendor

MRPeasy

## Category

erp

## Aliases

- MRP Easy
- MRPeasy ERP
- MRPeasy cloud MRP

## Overview

MRPeasy brings the core planning loop of a manufacturer into one cloud application. Customer orders and forecasts create demand, bills of materials and routings define how products are made, and the system proposes manufacturing orders and purchase orders to cover shortages. Shop floor staff report work against operations, and inventory is updated as materials are consumed and goods are produced.

Its users are typically small and mid-sized discrete and process manufacturers: machine shops with assemblies, electronics makers, food and chemical producers, furniture and consumer goods companies. They often move to MRPeasy from spreadsheets or a simple accounting package and want planning, traceability and costing without a team of consultants.

In a wider stack MRPeasy is usually the operational system of record for items, stock and production, while accounting stays in a separate package linked through integration. Quality, maintenance, advanced scheduling and e-commerce are either light built-in features or handled by connected tools, so teams should check how far the built-in capability goes for their needs.

## Best For

- Small manufacturers wanting MRP, production planning and inventory in one system.
- Make-to-stock, make-to-order and assemble-to-order companies with defined routings.
- Process or batch manufacturers that need lot tracking and formula-style bills of materials.
- Companies moving off spreadsheets that want a faster rollout than a traditional ERP.
- Businesses that keep a separate accounting package and want a clean operational layer.

## Modules

### Inventory and warehouse

**Description:** Manages items, locations, lots and serial numbers, with stock movements, counts and reorder levels.

### Bills of materials and routings

**Description:** Models multi-level structures and the operations, work centers and times used to make each product.

### Production planning and scheduling

**Description:** Generates manufacturing orders from demand and plans operations against work center capacity.

### Purchasing

**Description:** Creates purchase orders from shortages, tracks receipts and holds supplier and price information.

### Sales and CRM

**Description:** Handles quotes, customer orders, deliveries and basic customer records.

### Shop floor

**Description:** Lets operators see their jobs, report time and quantities and move work through operations.

### Costing and reporting

**Description:** Calculates planned and actual product cost and offers reports on stock, orders and production performance.

## Deployment

MRPeasy is delivered as a cloud service accessed through a browser. It is not offered as a customer-hosted on-premise installation.

## Integrations

### Accounting

**Detail:** Integrations with cloud accounting packages push invoices, bills and related postings to the general ledger.

### Open API

**Detail:** A REST-style API with key authentication allows external systems to read and write items, orders and stock data.

### E-commerce and shipping

**Detail:** Connectors or middleware link storefronts and carriers so orders and tracking flow between systems.

### Barcode scanning

**Detail:** Mobile and handheld scanning support speeds up receiving, picking and shop floor reporting.

### CSV import and export

**Detail:** Bulk data load and extraction support migrations, price updates and external analysis.

### Automation platforms

**Detail:** No-code integration tools are commonly used to connect MRPeasy to CRM, support and reporting products.

## Strengths

- Covers the full MRP loop from demand to purchasing and production in one product.
- Shorter implementation than traditional ERP, suited to teams without dedicated IT.
- Built-in lot and serial traceability helps with recalls and customer requirements.
- Cloud delivery removes the need to run servers and handle upgrades.
- Documented API supports connection to accounting, e-commerce and reporting tools.

## Limitations

- Financial accounting is handled outside the core product, so a separate package is normally required.
- Advanced finite scheduling, multi-plant operations and deep quality management are limited compared with larger ERP.
- Cloud only, which rules out on-premise or air-gapped deployments.
- Heavy customization is bounded by the product model, so unusual processes may need workarounds.
- Regulated industries should verify electronic record and audit trail needs against what the product provides.

## Alternatives

- Katana
- Fishbowl
- Odoo
- Acumatica
- Cetec ERP
- ERPNext

## Ai Opportunities

- Explain why a manufacturing order is delayed by tracing material shortages and supplier receipts.
- Suggest purchase quantities and timing using demand history, lead times and current stock.
- Spot bill of materials and routing anomalies such as missing components or unrealistic times.
- Answer ad hoc questions about stock, open orders and cost variances through the API instead of manual reports.
- Summarize planned versus actual cost differences by product and work center for management review.

## Selection Tips

- Run a real product with a multi-level bill of materials and routing through the demo, including scrap and yield.
- Check how work center capacity and scheduling behave when several jobs compete for the same resource.
- Confirm lot and serial traceability depth if you serve food, medical or aerospace customers.
- Verify the accounting integration and how stock value and cost of goods sold post.
- Ask about API coverage and limits before planning custom integrations.
- Map growth risks, such as a second site or complex quality needs, to avoid a forced re-platform.

## Faq

### Is MRPeasy a full ERP?

**Answer:** MRPeasy is a cloud manufacturing planning system that covers inventory, production, purchasing, sales and basic CRM. It does not replace a full financial ledger, so most customers connect an accounting package. For many small manufacturers that combination is enough, while larger or more regulated operations may need a broader ERP.

### Which companies use MRPeasy?

**Answer:** It is aimed at small and mid-sized manufacturers in discrete and process industries, including machining, electronics, food, chemicals and consumer goods. They tend to want planning and traceability without a long implementation. Larger multi-plant groups generally evaluate heavier platforms instead.

### Does MRPeasy offer an API?

**Answer:** Yes, MRPeasy provides an API that external systems can use to read and write data such as items, customer orders, stock and manufacturing orders. It is commonly used for e-commerce, reporting and automation tools. Confirm current object coverage, authentication and any rate limits in the vendor documentation.

### Can MRPeasy be installed on premise?

**Answer:** No. It is delivered as a cloud service, so there is no customer-hosted version. Organizations that must keep data inside their own network or work air-gapped need a different product, although data can be extracted through the API into private analytics tools you control.

### How does MRPeasy compare with Katana?

**Answer:** Both serve small manufacturers in the cloud. Katana leans toward online sellers and simplicity, with strong channel connectivity, while MRPeasy emphasizes broader MRP planning, routings and shop floor reporting. The better choice depends on process complexity, sales channels and traceability needs, so test both with your own data.

## Search terms

what is mrpeasy, mrpeasy alternatives, mrpeasy modules, mrpeasy api, mrpeasy vs katana, mrpeasy erp review, mrpeasy inventory, mrpeasy production planning, mrpeasy integrations, cloud mrp for small manufacturers

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
