# Octopart: datasheets, pricing, API and alternatives

> Source: https://netray.co/software/octopart
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Manufacturing Software Encyclopedia

## Short answer

Octopart is a free search engine for electronic parts: search a manufacturer part number and get the datasheet, distributor stock and price breaks, and specifications on one page. It aggregates distributor listings, stock levels, pricing breaks, datasheets and parametric specifications in one place. It is owned by Altium and is used by design engineers, buyers and sourcing teams to find and compare parts. Its data is also available programmatically for BOM tools and procurement workflows.

## Vendor

Altium

## Category

electronics

## Aliases

- Octopart search
- Octopart electronic parts search
- Nexar Octopart

## Overview

Octopart indexes electronic components from many franchised distributors and some other sellers, and presents a single page per manufacturer part number. A part page typically shows the manufacturer, a description, parametric attributes, datasheet links, lifecycle indicators where available, and a table of distributor offers with stock and quantity price breaks. Engineers use it to check whether a part can actually be bought before committing it to a design, and buyers use it to compare offers across sources.

The service started as an independent parts search engine and is now part of Altium. That relationship shows up in the tooling: Octopart data is surfaced inside Altium design and BOM-management products, and the programmatic interface is delivered through Altium's Nexar platform. For a manufacturer that does not use Altium tools, Octopart is still usable as a standalone website and as a data feed.

In a manufacturing stack, Octopart sits upstream of the ERP and PLM. It informs component selection and sourcing decisions, while the ERP holds the approved vendor list, purchase orders and costs. Octopart is a market-facing reference, not a system of record. Teams typically pair it with a deeper component compliance and lifecycle service when obsolescence, RoHS or REACH exposure matters, and with their own approved manufacturer list for controlled parts.

## Best For

- Electronics design engineers who need a fast check of availability and pricing during part selection.
- Procurement and sourcing staff at electronics manufacturers and EMS providers comparing distributor offers.
- Small and mid-sized hardware companies that want free or low-cost parts visibility without a full supply chain risk suite.
- Teams building BOM tools or cost estimators that need an API for parts, offers and specifications.
- Aerospace, defense and industrial electronics buyers who use it as a first-pass screen before formal sourcing.

## Modules

### Part search

**Description:** Keyword, manufacturer part number and parametric search across a large catalog of electronic components.

### Distributor offers

**Description:** Aggregated stock, quantity price breaks and packaging information from many distributors for a given part.

### Datasheets and specifications

**Description:** Octopart datasheet links point to the manufacturer PDF for each part, alongside structured parametric attributes for comparing parts. Viewing and downloading datasheets is free.

### CAD models

**Description:** Many part pages link to schematic symbols, PCB footprints and 3D models from CAD library providers, useful when building or checking an ECAD library.

### BOM tool

**Description:** Upload or build a bill of materials and see matched parts, availability and pricing across offers.

### Alerts and availability tracking

**Description:** Notices on stock and pricing changes for watched parts, depending on the plan in use.

### API access

**Description:** Programmatic access to part, offer and attribute data, delivered through the Nexar platform.

## Deployment

Octopart is a cloud service accessed through the web and an API. There is no on-premises edition, so companies with air-gapped or restricted networks usually cache exports or use an alternative data source.

## Integrations

### API

**Detail:** GraphQL-based API access through the Nexar platform for parts, offers and specifications. Check current terms and rate limits with the vendor.

### Altium tooling

**Detail:** Part and supply data is surfaced inside Altium design and component-management products for in-context availability checks.

### BOM files

**Detail:** BOM uploads in common spreadsheet and CSV formats for matching manufacturer part numbers to offers.

### ERP and procurement

**Detail:** No native ERP adapter should be assumed. Integrations are normally built by calling the API from middleware or a custom service and mapping to item master fields.

### PLM

**Detail:** Often paired with PLM or BOM platforms that can pull part data from external services.

## Strengths

- Fast, familiar interface that engineers adopt with little training.
- Broad aggregation of distributor listings in a single normalized view.
- Useful free tier of functionality for casual part lookups.
- Programmatic access supports automated BOM costing and availability checks.
- Tight connection to Altium design tools for teams already in that ecosystem.

## Limitations

- It is a search and aggregation layer, not a compliance, lifecycle forecasting or supply chain risk platform.
- Coverage and freshness depend on distributor feeds, so listings can lag real stock.
- No on-premises deployment for isolated networks.
- Does not replace a controlled approved manufacturer list or counterfeit-risk process.
- Deep use of the API may require a commercial agreement and has usage limits.

## Alternatives

- Findchips (Supplyframe)
- SiliconExpert
- Z2Data
- Accuris Parts Intelligence
- Digi-Key and Mouser part search
- Ariba or Coupa catalog sourcing

## Ai Opportunities

- Extract manufacturer part numbers from messy supplier quotes or legacy BOM spreadsheets and normalize them before lookup.
- Draft alternate-part suggestions from parametric data and flag which candidates need engineering approval.
- Summarize availability and price risk across a BOM in plain language for buyers.
- Answer questions over an exported parts and offers dataset kept on-prem, so sensitive BOMs do not leave the network.
- Cross-check the item master against part data to find duplicates and missing manufacturer references.

## Selection Tips

- Decide whether you need only availability and price, or also lifecycle, compliance and risk data.
- Ask about API terms, rate limits and allowed use before building automation on it.
- Test coverage with your own most-used and hardest-to-source parts, not only common ones.
- Confirm how data is refreshed and how you will treat stale offers in purchasing decisions.
- Check whether your security policy permits sending BOM contents to a cloud service.
- Plan how results map back to ERP item and vendor records rather than treating the site as a system of record.

## Faq

### What is Octopart used for?

**Answer:** Octopart is used to find electronic components and compare distributor stock, pricing and datasheets. Engineers use it during design to confirm a part is available, and buyers use it to compare offers. It is a search and data layer rather than a procurement or compliance system.

### Who owns Octopart?

**Answer:** Octopart is owned by Altium. Its data is integrated with Altium design and component tools, and its API is delivered through Altium's Nexar platform. It can still be used on its own without Altium design software.

### Does Octopart have an API?

**Answer:** Yes. Octopart data is available programmatically through the Nexar platform, which exposes parts, offers and specifications through a GraphQL interface. Access tiers, limits and commercial terms change, so confirm current details with the vendor before building on it.

### Is Octopart enough for compliance and obsolescence tracking?

**Answer:** Usually not on its own. It focuses on search and distributor offers. Teams that must track RoHS, REACH, conflict minerals, end-of-life notices and risk across a BOM typically add a dedicated component intelligence service such as SiliconExpert, Z2Data or Accuris Parts Intelligence.

### How does Octopart fit with ERP?

**Answer:** It sits upstream of the ERP. Engineering uses it to select and source parts, while the ERP holds items, approved vendors, purchase orders and costs. Connecting them generally requires custom integration through the API, mapped to item master and vendor fields.

### How do I find an Octopart datasheet?

**Answer:** Search the manufacturer part number on Octopart and open the part page. The datasheet link opens the manufacturer PDF, usually with a preview and download option, next to the specifications and distributor offers. If a part shows no datasheet, check the manufacturer site directly, and always confirm the datasheet revision before releasing a design.

### Does Octopart require a paid subscription for engineers searching parts for commercial product designs?

**Answer:** No. Searching Octopart on the website, viewing datasheets and comparing distributor offers is free, including for commercial product design work. Costs apply to programmatic use: the Nexar API has a limited free tier and paid plans for higher volumes and richer data, and commercial terms apply to automated or bulk use.

### Is Octopart mostly used by small businesses for CAD libraries?

**Answer:** No. Octopart is used by engineers and buyers at companies of every size, from startups and hobbyists to large OEMs and EMS providers. Its main use is part search, availability and pricing. Links to symbols, footprints and 3D models help with CAD libraries, but larger companies usually keep a controlled internal library and treat Octopart as a lookup source, not the library itself.

### Can engineers sourcing parts during design rely on Octopart?

**Answer:** For a first check, yes: it quickly shows whether a part is stocked at franchised distributors, at what quantity price breaks, and whether it looks active or near end of life. It should not be the only gate. Stock figures can lag, lifecycle and compliance data is limited, and controlled programs still need an approved manufacturer list, compliance data and buyer confirmation before release.

### Does Octopart map internal engineering part numbers to manufacturer numbers and distributor order codes?

**Answer:** Partly. Octopart links a manufacturer part number to each distributor's own order code (SKU) in its offers table, and the BOM tool lets you keep your own columns, such as an internal part number, next to the MPN. It does not own the internal-to-manufacturer cross reference. That mapping, including approved alternates, belongs in your PLM or ERP item master, which then calls Octopart or the Nexar API by MPN.

### Can I use Octopart in India?

**Answer:** Yes. The site works in India, and you can set your country and currency so offers reflect distributors that ship there, including global franchised distributors with Indian delivery. Landed cost still needs import duty, freight and GST added, and some regional sellers may not be listed, so check local distributors for urgent lines.

### Is there an Octopart Excel add-in?

**Answer:** Octopart has offered spreadsheet tooling in the past, but its status has changed with the move to the Nexar API, so check what is currently supported. Reliable options today are exporting results from the Octopart BOM tool to CSV or Excel, or pulling prices and stock into a spreadsheet by calling the Nexar API from Power Query or a small script.

## Search terms

what is octopart, octopart alternatives, octopart api, octopart bom tool, octopart vs siliconexpert, octopart nexar, octopart altium, electronic component search engine, octopart vs findchips, octopart, octoparts, octopart datasheet, octopart india, octopart excel add in, is octopart free, octopart cad models

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
