# What is Sankhya? Modules, integrations and alternatives

> Source: https://netray.co/software/sankhya
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Manufacturing Software Encyclopedia

## Short answer

Sankhya is a Brazilian ERP vendor and product family for business management, covering finance, commercial operations, supply chain, production and related functions for companies operating under Brazilian tax rules. It is used mainly by mid-sized Brazilian companies in industry, distribution, retail and services.

## Vendor

Sankhya

## Category

erp

## Aliases

- Sankhya ERP
- Sankhya Gestao de Negocios

## Overview

Sankhya is built for the Brazilian market, where an ERP must handle a demanding fiscal environment. That includes electronic invoice documents such as NF-e, transport documents, and the digital bookkeeping and tax reporting obligations that Brazilian companies file with authorities. A local-first product can embed these rules more naturally than a global ERP that depends on localization packs.

For manufacturers, the suite provides inventory, purchasing, bills of materials, production orders and costing alongside the commercial and financial modules. It is commonly evaluated by Brazilian mid-sized industrial and distribution companies that want one supplier for operations and compliance, and that value Portuguese-language support and local implementation partners.

Like most ERPs, it sits at the center of a wider landscape. Customers connect it to e-commerce, logistics and carrier systems, banks, shop floor data capture and analytics tools, using the vendor's integration capabilities and partner-built connectors. Organizations with operations outside Brazil should check international coverage carefully.

## Best For

- Mid-sized Brazilian manufacturers, distributors and retailers needing integrated fiscal compliance.
- Companies that want Portuguese-language ERP with local partner support.
- Businesses combining industry, trade and service lines under one system.
- Organizations that prefer a Brazil-based vendor for local tax rule updates.
- Teams seeking a configurable platform adapted by regional implementation partners.

## Modules

### Finance and accounting

**Description:** Receivables, payables, cash management, banking and accounting integrated with fiscal rules.

### Fiscal and tax

**Description:** Electronic fiscal documents and tax calculation for Brazilian federal, state and municipal obligations.

### Sales and commercial

**Description:** Quotes, orders, pricing, commissions and invoicing.

### Purchasing and inventory

**Description:** Purchase flow, receiving, stock control, warehouses and inventory valuation.

### Production

**Description:** Bills of materials, production orders and costing for manufacturers.

### CRM and service

**Description:** Customer relationship tracking and after-sales processes.

### Analytics and mobile

**Description:** Reporting, dashboards and mobile access for field and management users.

## Deployment

Offered as a cloud service and as an installed deployment, with the available options depending on the contract and implementation partner.

## Integrations

### APIs

**Detail:** The vendor provides APIs and integration tooling for exchanging business data with other applications; confirm the current developer documentation for exact interfaces.

### Fiscal authorities

**Detail:** Connections to government systems for electronic invoice authorization and tax reporting.

### Banking

**Detail:** Brazilian bank file standards and payment flows for collections and payables.

### E-commerce and logistics

**Detail:** Marketplace, webshop and carrier integrations, often through partner connectors.

### Shop floor

**Detail:** Production data collection and equipment data usually connect through middleware or partner solutions.

## Strengths

- Designed around Brazilian fiscal and legal requirements.
- Portuguese-language product and a local partner network.
- Integrated commercial, finance, supply and production functions in one suite.
- Vendor based in the market it serves, so tax rule changes are a core concern.

## Limitations

- Primarily a Brazil-focused product; international multi-country coverage should be validated.
- Less documentation and community content in English than global ERP vendors.
- Advanced MES, scheduling and quality functions may require additional tools.
- Quality of implementation depends on the partner and customization discipline.

## Alternatives

- TOTVS Protheus
- SAP S/4HANA
- SAP Business One
- Oracle NetSuite
- Microsoft Dynamics 365 Business Central
- Odoo

## Ai Opportunities

- Portuguese natural-language questions over sales, stock and receivables with the user's own permissions.
- Reading incoming supplier invoices and fiscal documents to propose matches to purchase orders for human approval.
- Explaining tax calculation results and rejected fiscal documents in plain language.
- Summarizing production orders, delays and material shortages for daily meetings.
- Searching contracts and policy documents together with ERP records.

## Selection Tips

- Validate fiscal scenarios specific to your state, product mix and operations in a demo.
- Ask how quickly tax rule changes are delivered and tested in your environment.
- Confirm production, costing and inventory features against your real process.
- Verify API coverage, authentication and documentation language for integrations.
- Check references from the same industry and region as your business.
- If you operate outside Brazil, test multi-country needs before committing.

## Faq

### What is Sankhya ERP?

**Answer:** Sankhya is a Brazilian ERP product family covering finance, fiscal compliance, commercial operations, supply chain and production. It is used primarily by mid-sized companies in Brazil in industry, distribution, retail and services, and is typically implemented with the help of regional partners.

### Does Sankhya handle Brazilian tax and NF-e?

**Answer:** Brazilian fiscal compliance is a central design goal of the suite, including electronic fiscal documents. Because tax rules differ by state, product and operation, test your specific scenarios during evaluation and ask how updates to legislation are delivered and validated.

### Is Sankhya suitable for manufacturers?

**Answer:** It includes inventory, bills of materials, production orders and costing, which fits many mid-sized Brazilian manufacturers. Plants with complex scheduling, advanced quality or deep shop floor integration needs should verify those capabilities and may pair the ERP with specialist tools.

### Does Sankhya have an API?

**Answer:** The vendor provides APIs and integration tooling for connecting with other systems. The exact interfaces, authentication methods and supported objects depend on version and contract, so review the current developer documentation and ask your partner what has been proven in production for similar integrations.

### How can AI help Sankhya users?

**Answer:** Practical uses include Portuguese natural-language questions over sales and stock, matching supplier invoices to purchase orders, and explaining rejected fiscal documents. Use the supported APIs with the user's permissions, show the source records, and keep human approval on posting and fiscal actions.

## Search terms

what is Sankhya, Sankhya ERP, Sankhya ERP modules, Sankhya ERP API, Sankhya ERP alternatives, Sankhya vs TOTVS, Sankhya ERP manufacturing, Sankhya NF-e, Sankhya ERP AI, Sankhya integration

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
