# ByDintec and SAP Business ByDesign: handheld warehouse transactions with continuous scanning

> Source: https://netray.co/stack/bydintec-mobile-warehouse-scanner-sap-business-bydesign
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Stack

## Short answer

The Mobile Warehouse Scanner App ByDintec from Dintec LLC is a handheld extension for SAP Business ByDesign, built with SAP Build per the SAP partner listing. It supports continuous-scan warehouse transactions, serial numbers and label creation, aimed at ByDesign users who want faster receiving and movement capture.

## Erp

SAP Business ByDesign

## Erp Key

sap-bydesign

## On Prem

false

## Product

Mobile Warehouse Scanner App ByDintec

## Vendor

Dintec LLC

## Category

Mobile inventory / barcode

## Integration

**Method:** Handheld extension built with SAP Build (SAP partner listing)

**Detail:** The listing describes a handheld extension created with SAP Build. Details of the services it calls are not in the listing, so confirm them with Dintec during evaluation.

**Method:** ByDesign communication arrangement and user

**Detail:** Like other external apps, expect to configure a communication system, user and arrangement, and give the user only the authorizations the scanning transactions need.

## Data Flows

**From:** ByDesign

**To:** ByDintec

**Data:** Products, serial numbers and open warehouse documents

**Trigger:** User starts a transaction

**From:** ByDintec

**To:** ByDesign

**Data:** Goods receipts and goods issues from continuous scans

**Trigger:** Scan session completed

**From:** ByDintec

**To:** ByDesign

**Data:** Serial number captures against products

**Trigger:** Serial scanned during a transaction

**From:** ByDintec

**To:** ByDesign

**Data:** Label creation requests and internal movements

**Trigger:** User prints a label or posts a movement

## Setup

### Review the listing and trial

**Detail:** Request a demo or trial from Dintec and confirm supported transaction types and devices.

### Create the ByDesign integration setup

**Detail:** Create the communication system, user and arrangements, then test connectivity from a device.

### Check master data

**Detail:** Ensure products, serial number profiles and storage locations are defined and barcodes match product IDs.

### Configure label creation

**Detail:** Set up label formats and printers, and test that printed labels scan back correctly.

### Deploy to devices

**Detail:** Install on the handhelds in scope and set up named users.

### Pilot and verify stock

**Detail:** Run a limited pilot and compare ByDesign stock and serial history to physical reality.

## Pitfalls

- Continuous scanning of the wrong item or quantity can post many lines quickly, so review before submit.
- Products without serial profiles configured in ByDesign cannot accept captured serial numbers properly.
- Label formats that do not scan on your printers or label stock waste time at the dock.
- Shared device logins make audit trails useless.
- Dependence on SAP Build artifacts means upgrades should be confirmed with the vendor after ByDesign releases.
- Unclear support boundaries between SAP, the partner and your reseller slow incident resolution.

## Ai Layer

### Serial number anomaly review

**Description:** An assistant looks for duplicate, missing or out-of-sequence serial numbers across receipts and issues and proposes corrections for approval.

### Scan session audit

**Description:** Summarize large continuous-scan sessions against the expected document quantities and highlight deviations before posting.

### Stock questions in plain language

**Description:** Ask where a serial-numbered unit was last moved or which documents touched a product, with read-only queries and the query shown.

## Alternatives

- SnAPscan or WMS Cloud are alternative ByDesign scanning apps with different device and offline trade-offs.
- ByDesign's own screens can be enough for low transaction volumes.
- A dedicated WMS may be warranted for directed putaway and wave picking beyond scan-and-post.

## Faq

### What does ByDintec cover?

**Answer:** The listing mentions continuous-scan warehouse transactions, serial numbers and label creation for ByDesign, delivered as a handheld extension built with SAP Build. Ask Dintec for the exact list of supported documents and devices.

### Does it need an integration layer?

**Answer:** It is described as an extension rather than a middleware product, but it still needs a ByDesign user and communication setup. The listing is brief, so verify details such as offline support before committing.

### Can we keep AI and data on-premises?

**Answer:** ByDesign is a cloud ERP, so the ERP itself is not on-prem. A private AI layer can run on your own infrastructure, read ByDesign through its APIs and keep model inference inside your network.

## Source

https://www.sap.com/taiwan/products/erp/partners/dintec-llc-mobile-warehouse-scanner-app-bydintec.html

## Search terms

bydesign mobile warehouse scanner app, bydintec, sap bydesign serial number scanning, bydesign handheld extension, sap build bydesign scanner, dintec bydesign

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
