# ECOSIRE shop floor data collection with SAP Business One: OEE, setup and alternatives

> Source: https://netray.co/stack/ecosire-shop-floor-oee-sap-business-one
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Stack

## Short answer

ECOSIRE offers a build-to-order browser operator terminal for SAP Business One where operators clock on and off production operations and record good and scrap quantities. OEE is computed from routing standards. It is a custom add-on built on the Business One Service Layer, so scope and support depend on the project you agree with the vendor. If you are comparing ECOSIRE alternatives, the main options are packaged Business One manufacturing add-ons such as Boyum beas Manufacturing or ProcessForce, a dedicated MES with machine connectivity, or Business One's standard production order reporting.

## Erp

SAP Business One

## Erp Key

sap-b1

## On Prem

true

## Product

SAP B1 Shop Floor Data Collection and Machine Monitoring

## Vendor

ECOSIRE

## Category

OEE and labor tracking

## Integration

**Method:** Custom Business One add-on over the Service Layer

**Detail:** The vendor describes a build-to-order add-on using Business One's Service Layer, which is the REST and OData interface to Business One objects. The browser terminal reads production orders and routing operations and writes back time and quantity data. Because it is custom, confirm who owns the code, how it is versioned and how it is retested after a Business One upgrade.

## Data Flows

**From:** SAP Business One

**To:** Operator terminal

**Data:** Released production orders, routing operations, work centers, standard times

**Trigger:** Operator opens the terminal or selects a job

**From:** Operator terminal

**To:** SAP Business One

**Data:** Clock-on and clock-off times against operations

**Trigger:** Operator starts or stops an operation

**From:** Operator terminal

**To:** SAP Business One

**Data:** Good quantity and scrap quantity per operation

**Trigger:** Operator reports output

**From:** SAP Business One

**To:** OEE report

**Data:** Routing standards used as the performance baseline

**Trigger:** OEE calculation or report refresh

## Setup

### Define the scope in writing

**Detail:** Agree which operations, work centers and scrap reasons the terminal covers. Build-to-order work needs a precise statement of what is included.

### Clean routings and standards

**Detail:** OEE is only as good as the routing times and work center capacity in Business One. Review them before the terminal goes live.

### Set up users and Service Layer access

**Detail:** Create a limited integration user and decide how operators identify themselves at the terminal, for example badge or PIN.

### Place terminals on the floor

**Detail:** Choose tablets or industrial PCs, arrange network access and secure kiosk mode for the browser.

### Define scrap and downtime codes

**Detail:** Agree a short, usable list. Long lists lead to operators picking the first option.

### Pilot on one work center

**Detail:** Run for a few weeks, compare recorded times to supervisor observation and tune OEE definitions.

## Pitfalls

- OEE computed from poor routing standards looks precise but misleads, so fix standards before trusting the numbers.
- Operators forgetting to clock off inflate run time and depress OEE for the operation.
- Custom add-ons can break after a Business One upgrade or Service Layer change, so plan regression tests.
- Scrap reported without a reason code removes the information needed to act on it.
- Machine monitoring claims need a clear source of machine states. If it is manual, availability data will be approximate.

## Ai Layer

### Plain-language OEE questions

**Description:** A private assistant reading Business One and terminal data can answer questions such as which work center lost the most time on scrap this week, and show the data it used.

### Anomaly review of clock data

**Description:** It flags operations with missing clock-offs, impossible durations or repeated overrides so supervisors can correct them before payroll or costing.

### Standards versus actuals

**Description:** It compares actual run times to routing standards by item and work center and drafts proposed routing changes for engineering to approve.

## Alternatives

- A dedicated MES with machine connectivity may be better if you need automatic machine states rather than operator-entered data.
- Business One's own production order reporting with manual issue and receipt can be enough for simple, low-volume shops.
- A tablet-based form tied to a spreadsheet can be a short-term bridge before commissioning a custom add-on.
- Boyum IT's beas Manufacturing is a packaged Business One manufacturing add-on with shop floor terminals and time recording, an option if you prefer a maintained product over custom code.
- ProcessForce is another packaged manufacturing extension for Business One, aimed at process and discrete manufacturers who want routings, resources and production reporting in one add-on.

## Faq

### What are the best ECOSIRE alternatives for SAP Business One shop floor and OEE?

**Answer:** It depends on what you need. For a packaged, vendor-maintained product instead of build-to-order code, look at Business One manufacturing add-ons such as Boyum beas Manufacturing or ProcessForce, which include production reporting and operator time capture. For automatic machine states and true availability data, a dedicated MES with machine connectivity is the stronger choice. For simple, low-volume shops, Business One's own production orders with issue and receipt reporting may be enough. Compare them on upgrade handling, licensing per terminal, whether OEE uses machine signals or operator entry, and who supports the code.

### Is this an off-the-shelf product?

**Answer:** The vendor describes it as build-to-order, so scope, support and upgrade handling are agreed per project. Ask for clear documentation of what is built and who maintains it.

### How is OEE calculated?

**Answer:** The vendor says OEE is computed from routing standards and operator-recorded time and quantities. The quality of the result depends on your routings and on operators recording data consistently.

### Does it connect to machines directly?

**Answer:** The listing describes an operator terminal, so machine data may be operator-reported. If you need automatic machine signals, discuss that explicitly with the vendor or consider a dedicated MES.

### Where would AI help here?

**Answer:** A private assistant can read Business One production data and terminal records on your own servers to explain losses and flag data errors. Changes to production records stay with a human reviewer.

## Source

https://ecosire.com/apps/sap-business-one/sap-b1-shop-floor-data-collection

## Search terms

sap business one oee add-on, sap b1 shop floor data collection, business one operator terminal, business one production labor tracking, business one scrap reporting, ecosire sap business one, ecosire alternatives, ecosire alternative sap business one, sap business one shop floor add-on alternatives

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
