# Just Plan It and SAP Business ByDesign: finite-capacity scheduling for production orders

> Source: https://netray.co/stack/just-plan-it-finite-scheduling-sap-business-bydesign
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Stack

## Short answer

SAP Business ByDesign only offers infinite capacity planning. Just Plan It from Navigator Business Solutions adds finite-capacity scheduling, with two-way sync of production orders and proposals across multiple plants. The SAP Store listing describes the connection as an SAP BTP Integration Suite connector.

## Erp

SAP Business ByDesign

## Erp Key

sap-bydesign

## On Prem

false

## Product

Just Plan It integration for SAP Business ByDesign

## Vendor

Navigator Business Solutions

## Category

APS / finite scheduling

## Integration

**Method:** SAP BTP Integration Suite connector (SAP Store listing)

**Detail:** The listing describes a connector running on SAP Business Technology Platform Integration Suite. It moves production orders and planning proposals between ByDesign and the scheduler in both directions.

**Method:** ByDesign web services

**Detail:** ByDesign exposes SOAP web services and OData-style APIs through its communication arrangements and scenarios. A scheduling integration reads and writes through these, so a communication system and user are needed. Confirm the exact services with the vendor.

## Data Flows

**From:** ByDesign

**To:** Just Plan It

**Data:** Production orders, routings, work centers and capacities

**Trigger:** Order released or changed

**From:** ByDesign

**To:** Just Plan It

**Data:** Planned order and production proposals

**Trigger:** Planning run completed

**From:** Just Plan It

**To:** ByDesign

**Data:** Scheduled start and end dates by operation

**Trigger:** Planner commits the finite schedule

**From:** Just Plan It

**To:** ByDesign

**Data:** Updated production proposals across plants

**Trigger:** Rescheduling after a disruption

## Setup

### Confirm scope and plants

**Detail:** List the plants, work centers and product families to be scheduled, and confirm they are supported in the listing.

### Subscribe to BTP Integration Suite

**Detail:** Provision the BTP subaccount and Integration Suite, and deploy the Navigator connector package from the SAP Store.

### Create the ByDesign communication arrangement

**Detail:** Create a communication system, user and arrangements for the scenarios the connector needs.

### Clean up routings and capacities

**Detail:** Check that work centers have realistic capacity, operations have times and routings are complete. Finite scheduling exposes bad data quickly.

### Run a parallel schedule

**Detail:** Compare the finite schedule with current practice for a few weeks before letting it write dates back.

### Define schedule ownership

**Detail:** Decide who commits schedules, how often, and which dates in ByDesign are controlled by the scheduler.

## Pitfalls

- Incomplete routings or missing operation times produce schedules that look precise but are wrong.
- Two-way sync can overwrite dates that planners edited in ByDesign unless ownership rules are explicit.
- Work center calendars and shift patterns that differ between the scheduler and ByDesign produce date differences.
- Multi-plant setups need consistent plant and work center identifiers on both sides.
- BTP subscription, credentials and communication arrangements expire or get changed, silently stopping sync.
- ByDesign quarterly releases may change services; retest after each release.

## Ai Layer

### Schedule change explanation

**Description:** After a reschedule, an assistant lists which production orders moved, by how much and why, such as a capacity overload or a late material, for planners to review.

### Data quality checks

**Description:** Scan routings and work centers for missing times or capacities that distort the finite schedule, and draft corrections for approval.

### Plain-language plant questions

**Description:** Let planners ask which orders are at risk of missing due dates and which work centers are overloaded, with read-only queries and visible logic.

## Alternatives

- For a small shop, a spreadsheet or the ByDesign Gantt views may be enough if infinite planning with manual leveling works.
- A full ERP with built-in finite scheduling avoids the add-on but means a larger change.
- A standalone APS tool that reads exports from ByDesign could work for one-way scheduling without write-back.

## Faq

### Why does ByDesign need a scheduling add-on?

**Answer:** ByDesign offers infinite capacity planning, which assumes resources are always available. Manufacturers with real bottlenecks need finite-capacity scheduling that respects work center capacity. Just Plan It adds that, according to the SAP Store listing.

### How does it connect?

**Answer:** The listing describes an SAP BTP Integration Suite connector with two-way synchronization of production orders and proposals across multiple plants. Ask Navigator for the exact services used and the BTP licensing implications before planning the project.

### Can this run on-premises?

**Answer:** ByDesign is a cloud ERP, and the connector runs on SAP BTP, so this is not an on-prem pairing. If you want AI over schedules and orders in your own network, a private layer can read the data through APIs while keeping inference local.

## Source

https://www.sap.com/greece/products/scm/partners/navigator-business-solutions-inc-just-plan-it-integration.html

## Search terms

just plan it sap bydesign scheduling, sap business bydesign finite capacity scheduling, bydesign production scheduling, navigator business solutions just plan it, bydesign aps, sap bydesign capacity planning

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json