# PlanetTogether APS with SAP Business One: scheduling and write-back

> Source: https://netray.co/stack/planettogether-aps-sap-business-one
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Stack

## Short answer

PlanetTogether is a finite-capacity advanced planning and scheduling tool with a standard pre-built ERP integration for SAP Business One, Business ByDesign and SAP ERP. It reads orders and resources, schedules to real capacity, and writes rescheduled start dates and resources back to production orders.

## Erp

SAP Business One

## Erp Key

sap-b1

## On Prem

true

## Product

PlanetTogether APS

## Vendor

PlanetTogether

## Category

APS

## Integration

**Method:** Standard pre-built ERP integration

**Detail:** The vendor lists a standard integration for these SAP products. It imports orders, routings, resources and inventory and exports schedule results to the ERP. Business One on SQL Server or HANA is commonly on-prem, and PlanetTogether can be deployed on your servers or hosted, so confirm the topology you need.

## Data Flows

**From:** Business One production orders and sales orders

**To:** PlanetTogether

**Data:** Demand, quantities, due dates, status

**Trigger:** Scheduled import or on demand

**From:** Business One BOMs, routings, work centers

**To:** PlanetTogether

**Data:** Operations, run times, resources

**Trigger:** Initial load and on change

**From:** Business One inventory and purchase orders

**To:** PlanetTogether

**Data:** On-hand and expected supply

**Trigger:** Each planning run

**From:** PlanetTogether

**To:** Business One

**Data:** Rescheduled start dates and resources on production orders

**Trigger:** Publish after schedule approval

## Setup

### Clean the master data

**Detail:** Fix routings, BOMs, run rates and resource calendars first; APS exposes every error.

### Define resources

**Detail:** Model work centers, shifts, setup and changeover rules in PlanetTogether.

### Configure the import

**Detail:** Map ERP fields to PlanetTogether objects and select which order statuses are schedulable.

### Set scheduling rules

**Detail:** Choose priorities, optimisation rules, and which jobs are frozen.

### Run a shadow period

**Detail:** Compare APS schedules to what planners built in the same week without writing back.

### Enable write-back

**Detail:** Turn on publishing of dates and resources with a restricted ERP user.

### Train planners

**Detail:** Agree who approves and publishes, and how often.

## Pitfalls

- Routings with unrealistic run times, giving schedules shop-floor staff ignore.
- Orders released in the ERP between import and publish, creating conflicts.
- Write-back overwriting dates a planner set manually in the ERP.
- Material availability ignored because purchase order dates are stale.
- Resource calendars not updated for holidays or maintenance.
- Planning too frequently with no frozen horizon, so the floor sees constant changes.

## Ai Layer

### Late order explanations

**Description:** A private assistant reads the schedule and ERP data and explains in plain language why an order is late, such as a constrained resource or missing material.

### Master data quality scan

**Description:** Find routings whose reported times deviate strongly from actuals and draft corrections for a planner to approve.

### Schedule versus actual digest

**Description:** Summarise yesterday's variance between planned and actual start and completion by work center.

## Alternatives

- Business One's built-in MRP and a spreadsheet Gantt for small, simple shops.
- A visual scheduling add-on from the Business One partner ecosystem.
- Improving routings and dispatching discipline before buying APS.

## Faq

### Does PlanetTogether write back to the ERP?

**Answer:** The vendor says it writes rescheduled production order start dates and resources back to the ERP. Confirm which fields and order statuses are updated in your version.

### Can it run on-prem?

**Answer:** Business One is often on-prem. PlanetTogether offers its own deployment options, so ask the vendor which fit a restricted or air-gapped plant network.

### What does an AI layer add to APS?

**Answer:** It explains and audits: why jobs are late, which data is wrong, how plan compares to actual. It should not publish schedules without planner approval.

## Source

https://www.planettogether.com/aps/integrations/bydesign-integration

## Search terms

planettogether sap business one integration, planettogether bydesign, business one aps scheduling, finite capacity scheduling sap business one, planettogether production order write back, planettogether sap erp

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
