# uniPoint Quality for Infor and Infor VISUAL

> Source: https://netray.co/stack/unipoint-quality-for-infor-visual
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: ERP Stack

## Short answer

Quality for Infor by uniPoint is a QMS marketed to Infor ERP users for ISO 9001, AS9100 and FDA 21 CFR Part 11 work, distributed by an Infor VISUAL and SyteLine partner. The fact sheet says it can run standalone or integrated but does not state the integration method, so treat the VISUAL link as something to scope, not assume.

## Erp

Infor VISUAL

## Erp Key

infor-visual

## On Prem

true

## Product

Quality for Infor by uniPoint

## Vendor

uniPoint Software (distributed by WM Synergy)

## Category

Quality management (QMS)

## Integration

**Method:** Standalone or integrated (method not stated)

**Detail:** The partner fact sheet describes both modes without naming the mechanism. Ask the vendor whether integration is by database, files or APIs, which VISUAL versions are supported, and who maintains it.

**Method:** Typical VISUAL integration patterns

**Detail:** For VISUAL, quality tools commonly read item, vendor, work order and receipt data from the SQL database, or use exports. This is general practice and not a statement about uniPoint's design.

## Data Flows

**From:** VISUAL items, vendors and customers

**To:** QMS

**Data:** Master data so quality records reference the same parts and suppliers

**Trigger:** Initial load and scheduled sync, if integrated

**From:** VISUAL receipts and work orders

**To:** QMS

**Data:** Lots and jobs that need inspection or may raise a non-conformance

**Trigger:** Receipt or work order event

**From:** QMS

**To:** VISUAL

**Data:** Hold or disposition outcome, if write-back is supported

**Trigger:** Disposition approved

## Setup

### Confirm scope and standards

**Detail:** Decide whether the driver is ISO 9001, AS9100 or Part 11 electronic records, since that sets validation effort.

### Ask for the integration specifics

**Detail:** Get the supported VISUAL versions, mechanism and responsibilities in writing from the vendor or partner.

### Load master data

**Detail:** Align part numbers, suppliers and customers between VISUAL and the QMS so records link.

### Configure workflows

**Detail:** Set up non-conformance, corrective action and document approval flows with named approvers.

### Validate if regulated

**Detail:** For Part 11, plan user authentication, audit trail and electronic signature validation as a documented exercise.

### Train and cut over

**Detail:** Migrate open items from spreadsheets, train users, and set a date after which the old logs are closed.

## Pitfalls

- Assuming integration with VISUAL is included when the fact sheet only says it can be integrated.
- Part numbers differing between ERP and QMS, so non-conformances cannot be traced to inventory.
- Electronic signature and audit trail features enabled but never validated for Part 11.
- Holds recorded in the QMS but not reflected in VISUAL inventory, letting suspect material be issued.
- Upgrades of VISUAL breaking a database-level integration without anyone owning retests.

## Ai Layer

### Cross-system traceability questions

**Description:** Ask which jobs used a lot that has an open non-conformance, by reading both the QMS and VISUAL, with the query shown.

### Corrective action drafting

**Description:** Draft root cause and action text from related non-conformance records for a quality manager to edit and approve.

### Audit preparation

**Description:** Collect the records an auditor is likely to ask for, such as supplier issues, overdue actions and calibration status, into a checklist for review.

## Alternatives

- The native quality functions in VISUAL or SyteLine may cover inspection and certificates if you do not need a full QMS.
- Other QMS products such as ETQ Reliance may have documented Infor integration, so compare alternatives.
- A controlled document system plus a well-run spreadsheet can satisfy a small shop's ISO 9001 needs.

## Faq

### Does uniPoint Quality integrate with Infor VISUAL?

**Answer:** The partner fact sheet markets it for Infor ERP users and says it can be standalone or integrated, but it does not name VISUAL as a certified integration or state the method. Get the supported versions and mechanism from the vendor in writing.

### Is it suitable for AS9100 or FDA environments?

**Answer:** It is marketed for ISO 9001, AS9100 and 21 CFR Part 11 compliance. Compliance is still the customer's responsibility, and regulated users should validate the configuration and the audit trail and signature controls themselves.

### Can AI read the QMS and ERP together on-prem?

**Answer:** Yes. A private assistant on your own servers can query both databases read-only and answer traceability questions without exposing quality records, and any change it proposes goes to a human for approval.

## Source

https://wm-synergy.com/wp-content/uploads/2020/01/Quality_for_Infor_by_uniPoint-1.pdf

## Search terms

uniPoint quality Infor VISUAL SyteLine integration, unipoint quality for infor, infor visual QMS, infor visual AS9100, infor visual 21 CFR part 11, WM Synergy quality infor

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
