# BOM Cost Rollup Worksheet for Acumatica and Sage

> Source: https://netray.co/tools/acumatica-sage-bom-cost-rollup-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Editable worksheet that rolls up material cost for a bill of materials with a scrap allowance per line and exports to Excel.

## Category

cost-finance

## Erp

Acumatica

## Industry

SMB Manufacturing

## Audience

- Cost accountant
- Manufacturing engineer
- ERP consultant

## Tool

**Kind:** worksheet

**Mode:** editable

**Currency:** $

**Columns:**

#### Component

**Key:** part

**Type:** text

#### UoM

**Key:** uom

**Type:** select

**Options:**

- EA
- KG
- M
- L
- FT

#### Qty per assembly

**Key:** qty

**Type:** number

#### Scrap allowance %

**Key:** scrap

**Type:** number

**Unit:** %

#### Unit cost

**Key:** cost

**Type:** number

**Format:** currency

#### Extended cost

**Key:** ext

**Type:** number

**Expr:** qty * (1 + scrap / 100) * cost

**Format:** currency

**Rows:**

**Part:** Machined housing

**Uom:** EA

**Qty:** 1

**Scrap:** 2

**Cost:** 18.4

**Part:** Aluminium bar stock

**Uom:** KG

**Qty:** 0.45

**Scrap:** 8

**Cost:** 6.2

**Part:** O-ring seal

**Uom:** EA

**Qty:** 2

**Scrap:** 1

**Cost:** 0.35

**Part:** Wire harness

**Uom:** EA

**Qty:** 1

**Scrap:** 0

**Cost:** 7.9

**Part:** Fastener kit

**Uom:** EA

**Qty:** 1

**Scrap:** 3

**Cost:** 1.15

**Totals:**

#### Rolled-up material cost

**Key:** ext

**Agg:** sum

**Format:** currency

**Summary:**

#### Average line cost

**Key:** avg_line

**Expr:** sum_ext / count

**Format:** currency

#### Cost with 15% burden

**Key:** with_overhead

**Expr:** sum_ext * 1.15

**Format:** currency

**Description:** Illustrative burden; replace with your overhead rate.

**Notes:** Extended cost = quantity per assembly x (1 + scrap allowance) x unit cost. Check results against the cost rollup in your ERP before loading standard costs.

## Content

**Intro:** Before you load standard costs into a new ERP, you want a quick independent check of the roll-up. This worksheet lets you list the components, apply a scrap allowance and see the extended and total material cost, then export the table to Excel.

**Sections:**

#### How to use it

**Body:** Replace the sample rows with your components, units of measure and quantity per assembly. Enter a scrap allowance for each line where yield loss is expected, such as bar stock and cut-to-length materials. Unit costs come from your latest purchase prices or approved standard costs. The total updates as you edit, and you can add rows for sub-assemblies or additional components.

#### Method

**Body:** Each line costs quantity x (1 + scrap / 100) x unit cost. The sum of lines is the rolled-up material cost, and the summary shows a burdened figure using an illustrative overhead rate. Real systems also roll up labour, machine and overhead through routings, and multi-level BOMs add the cost of each child assembly, so use this for single-level checks and spot audits.

**Bullets:**

- Keep units of measure consistent with purchasing units.
- Use yield-based scrap for materials, fixed for fasteners.
- Record the cost date so the check is traceable.

#### Common mistakes

**Body:** Mismatched units of measure are the classic error, such as costing per metre while the BOM consumes millimetres. Others include double-counting scrap that the routing also applies, and using last price for some parts and average cost for others. Compare against the ERP rollup and investigate any line that differs.

**Cta:** Netray can compare your ERP cost rollups with your purchasing data and highlight outliers.

**Faq:**

#### Does this do multi-level BOMs?

**Answer:** It handles one level at a time. For multi-level products, roll up each sub-assembly separately and enter its cost as a component line in the parent.

#### What scrap percentage should I use?

**Answer:** Use measured yield loss from production or supplier data. For standard costing, many companies review scrap factors annually as part of the cost update.

#### Can I export it?

**Answer:** Yes. The worksheet exports to Excel, CSV and PDF, so you can share it or use it as a reference during a cost review.

#### Is this a cost accounting tool?

**Answer:** It is a simple check. Full costing includes labour, machine rates, overhead and variances, which belong in your ERP's costing module.

## Search terms

bom cost rollup excel, bill of materials cost template, standard cost rollup worksheet, acumatica bom cost check, sage x3 bom cost template, bom cost with scrap allowance

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
