# Additive Manufacturing Build Cost Estimator (Machine Time, Material, Post-Processing)

> Source: https://netray.co/tools/additive-manufacturing-build-cost-estimator-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Build-time and cost model for powder bed fusion jobs: recoat time, scan time, powder with recycle loss, setup and post-processing per part.

## Category

cost-finance

## Industry

Additive Manufacturing

## Audience

- Cost estimator
- Manufacturing engineer
- Additive manufacturing lead

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Part volume (solid)

**Key:** part_vol

**Type:** number

**Default:** 45

**Min:** 0.1

**Step:** 1

**Unit:** cm3

**Help:** Solid volume of one part from CAD, excluding supports.

#### Parts per build

**Key:** parts

**Type:** number

**Default:** 12

**Min:** 1

**Step:** 1

**Unit:** parts

**Help:** Number of parts nested on the plate for this build.

#### Support volume

**Key:** support_pct

**Type:** number

**Default:** 15

**Min:** 0

**Max:** 200

**Step:** 1

**Unit:** % of part

**Help:** Support and plate-anchor volume as a percent of part volume. Typical range is 5 to 40 percent, higher for overhang-heavy geometry.

#### Build height (Z)

**Key:** build_height

**Type:** number

**Default:** 90

**Min:** 5

**Step:** 5

**Unit:** mm

**Help:** Height of the tallest part in the build. Sets the layer count and recoat time.

#### Layer thickness

**Key:** layer_um

**Type:** select

**Default:** 40

**Options:**

##### 20 um

**Value:** 20

##### 30 um

**Value:** 30

##### 40 um

**Value:** 40

##### 60 um

**Value:** 60

##### 80 um

**Value:** 80

#### Scan volumetric build rate

**Key:** vbr

**Type:** number

**Default:** 20

**Min:** 1

**Step:** 1

**Unit:** cm3/hr

**Help:** Effective rate of solidified volume per hour for the alloy and parameter set, from your machine. Single-laser stainless is often 5 to 20; multi-laser systems are higher.

#### Recoat and lowering time per layer

**Key:** recoat_s

**Type:** number

**Default:** 9

**Min:** 1

**Step:** 0.5

**Unit:** sec

**Help:** Time per layer that is not scanning: recoater pass, platform lowering, gas settle.

#### Machine hourly rate

**Key:** machine_rate

**Type:** number

**Default:** 45

**Min:** 1

**Step:** 1

**Unit:** $/hr

**Help:** Fully burdened rate: depreciation, service contract, inert gas, filters, floor space, operator share.

#### Material density

**Key:** density

**Type:** number

**Default:** 7.99

**Min:** 1

**Step:** 0.01

**Unit:** g/cm3

**Help:** 316L 7.99, 17-4 PH 7.78, Ti-6Al-4V 4.43, AlSi10Mg 2.67, Inconel 718 8.19.

#### Powder price

**Key:** powder_price

**Type:** number

**Default:** 55

**Min:** 1

**Step:** 1

**Unit:** $/kg

**Help:** Delivered price of AM-grade powder.

#### Powder not recycled

**Key:** powder_loss

**Type:** number

**Default:** 5

**Min:** 0

**Max:** 60

**Step:** 1

**Unit:** % of consumed

**Help:** Spatter, sieve rejects, samples and degraded powder that cannot return to the batch.

#### Setup and teardown labor per build

**Key:** setup_cost

**Type:** number

**Default:** 180

**Min:** 0

**Step:** 10

**Unit:** $

**Help:** File prep, plate mounting, purge, unload, depowder and cleaning labor per build.

#### Post-processing per part

**Key:** post_per_part

**Type:** number

**Default:** 85

**Min:** 0

**Step:** 5

**Unit:** $

**Help:** Stress relief share, wire EDM cut-off, support removal, finishing, outside heat treat, inspection.

**Outputs:**

#### Layer count

**Key:** layers

**Expr:** ceil(build_height * 1000 / layer_um)

**Format:** integer

**Description:** Build height divided by layer thickness.

#### Scanned volume (parts plus supports)

**Key:** scan_vol

**Expr:** parts * part_vol * (1 + support_pct / 100)

**Format:** number

**Description:** Total cm3 the laser must solidify.

#### Total build time

**Key:** build_hr

**Expr:** layers * recoat_s / 3600 + scan_vol / vbr

**Format:** hours

**Description:** Recoat time (layers x seconds per layer) plus scan time (volume / build rate).

#### Machine cost per build

**Key:** machine_cost

**Expr:** build_hr * machine_rate

**Format:** currency

#### Powder mass solidified

**Key:** mass_kg

**Expr:** scan_vol * density / 1000

**Format:** decimal

**Description:** Mass in kg of parts plus supports.

#### Powder cost per build

**Key:** powder_cost

**Expr:** mass_kg * (1 + powder_loss / 100) * powder_price

**Format:** currency

#### Total job cost

**Key:** total_job

**Expr:** machine_cost + powder_cost + setup_cost + parts * post_per_part

**Format:** currency

#### Cost per part

**Key:** cost_per_part

**Expr:** total_job / parts

**Format:** currency

**Primary:** true

**Description:** All-in cost per finished part for this build.

#### Machine cost per part

**Key:** machine_per_part

**Expr:** machine_cost / parts

**Format:** currency

**Description:** The share of cost that nesting more parts directly reduces.

**Chart:**

#### Cost per part vs parts per build (build height held constant)

**Type:** line

**X:** parts

**From:** 1

**To:** 40

**Steps:** 40

**Series:**

- cost_per_part
- machine_per_part

**Disclaimer:** Planning estimate. Build rate, recoat time and support volume vary by machine, alloy, parameter set and geometry. Calibrate with your own build logs.

## Content

**Intro:** This calculator estimates what one powder bed fusion build costs and what each part carries, using the same logic as an AM service-bureau quote: time on the machine, powder consumed, fixed handling and post-processing. Change the nest count and watch the cost curve flatten.

**Sections:**

#### How to use it

**Body:** Enter part volume from CAD, how many parts fit on the plate, and the tallest part height. Then enter the machine's real scan build rate and recoat time per layer from a recent job log, not the brochure value. Set the machine rate to your fully burdened cost per hour. The result shows total build hours, cost per build and cost per part. The chart sweeps parts per build from 1 to 40 with all other inputs fixed, which shows how quickly the fixed recoat time and setup cost are diluted.

**Bullets:**

- Use solid part volume without supports, then add support percent separately.
- Take build rate from actual build reports for the same alloy and layer thickness.
- Include operator, argon and filter cost in the machine rate, not as extras.

#### The model and formulas

**Body:** Build time is the sum of two parts. Recoat time is layers x seconds per layer / 3600, where layers = build height / layer thickness. Scan time is scanned volume / volumetric build rate, where scanned volume = parts x part volume x (1 + support fraction). Machine cost is build hours x hourly rate. Powder cost is solidified mass x (1 + non-recycled loss) x price, with mass = volume x density. Total job cost adds setup labor and post-processing per part. Recoat time depends only on height, so it is shared by every part on the plate.

#### Reading the result

**Body:** With the defaults (twelve 45 cm3 stainless parts, 90 mm tall) the build is roughly a day and a half of machine time and cost per part lands in the low hundreds of dollars. Machine cost usually dominates for dense nests of solid parts, while post-processing dominates for small or thin parts. If machine cost per part falls steeply as you add parts, nesting and orientation effort pays back. If it is flat, reduce support volume or post-processing instead.

#### Common mistakes

**Body:** Estimators often use the theoretical laser build rate, which ignores contour scans, down-skin parameters and gas flow pauses, and so under-quote by 20 to 50 percent. Others forget that powder consumed includes supports and that part height, not part count, drives recoat time. Do not price scrap: if your first-pass yield is 90 percent, divide the cost per part by 0.9. Post-processing such as HIP, wire EDM and machining of interfaces is frequently left out of early budgets.

**Cta:** If your quotes live in an ERP routing and cost rollup, we can wire this logic into it so AM jobs are costed from live machine hours and powder lots.

**Faq:**

#### What build rate should I enter?

**Answer:** Use the effective scan volumetric build rate from your own completed builds for the same alloy, layer thickness and parameter set. Divide solidified volume by scan hours, excluding recoat time. Vendor datasheet maximums assume ideal geometry and usually overstate real throughput.

#### Does recoat time really matter?

**Answer:** Yes. A 100 mm build at 40 um has 2,500 layers, and at 9 seconds each that is over six hours of non-scanning time regardless of how many parts are on the plate. Dense nests dilute it; single parts bear all of it.

#### How do I include HIP or heat treatment?

**Answer:** Add the per-part share of the outside processing charge to post-processing per part. For a batch HIP cycle, divide the lot price by the number of parts in the lot, then add machining and inspection.

#### Is this valid for binder jet or polymer processes?

**Answer:** The structure holds, but the rates differ. Binder jet and polymer powder bed processes are limited by build volume and packing density rather than scan rate, so use the nesting calculator and set the build rate to your measured volumetric throughput.

## Search terms

metal 3d printing cost calculator, additive manufacturing cost estimation, SLM build cost calculator, DMLS cost per part, powder bed fusion build time estimate, 3d printing cost per part excel, additive manufacturing quote calculator, LPBF cost model

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
