# AS9100 Audit Report Example and Management Review Example

> Source: https://netray.co/tools/as9100-audit-report-and-management-review-example
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A completed sample AS9100D internal audit report with findings plus sample management review minutes, editable and exportable as your own template.

## Category

aerospace-defense

## Industry

Aerospace

## Audience

- Aerospace quality manager
- Internal auditor
- Management representative

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Organization

**Key:** company

**Type:** text

**Default:** Skyline Aerostructures LLC

#### Audit date

**Key:** auditdate

**Type:** date

**Default:** 2026-09-16

#### Lead auditor

**Key:** auditor

**Type:** text

**Default:** K. Nowak

#### Audit scope

**Key:** scope

**Type:** text

**Default:** Clause 8.4 control of external providers and 8.5.1 production control, Machining cell 2

#### Audit criteria

**Key:** criteria

**Type:** text

**Default:** AS9100D, company procedures QP-08.4 and QP-08.5, customer flow-down requirements

#### Audit conclusion

**Key:** conclusion

**Type:** textarea

**Default:** The processes audited are generally effective. Two minor nonconformities and one observation were raised. No evidence of nonconforming product shipped.

#### Finding 1 (minor NC)

**Key:** f1

**Type:** textarea

**Default:** Clause 8.4.1: approved supplier list shows a special process supplier with a lapsed Nadcap accreditation date; no record of verification. Evidence: ASL rev 14, supplier record SP-031.

#### Finding 2 (minor NC)

**Key:** f2

**Type:** textarea

**Default:** Clause 7.1.5.2: bore gauge ID G-204 used on 2026-09-10 was 6 days past calibration due date. Evidence: calibration register, job traveler 55182.

#### Observation or opportunity

**Key:** obs

**Type:** textarea

**Default:** Operator work instructions at cell 2 do not show the latest key characteristic call-outs on the drawing. Consider linking instruction revision to the drawing change.

#### Positive practice noted

**Key:** good

**Type:** textarea

**Default:** First article records for new parts are complete and traceable to the ERP routing.

#### Management review date

**Key:** mrdate

**Type:** date

**Default:** 2026-10-08

#### Management review attendees

**Key:** mrattend

**Type:** textarea

**Default:** President, VP Operations, Quality Manager, Supply Chain Manager, Engineering Manager, Management Representative

#### On-time delivery and quality performance

**Key:** otd

**Type:** textarea

**Default:** OTD 93 percent against target 95. Customer rejects 0.8 percent of lots. Escapes: 1 customer complaint on burr removal, 8D closed.

#### External provider performance

**Key:** ext

**Type:** textarea

**Default:** Two suppliers on watch for late delivery. Special process suppliers reviewed against accreditation status.

#### Decisions and actions from review

**Key:** mrout

**Type:** textarea

**Default:** 1. Add Nadcap expiry alert to ASL, owner Supply Chain, due 2026-11-15.
2. Approve capacity study for cell 2, owner Operations, due 2026-12-01.
3. Add calibration due date check to travelers, owner Quality, due 2026-11-01.

**Blocks:**

#### Internal Audit Report (example)

**Body:** Organization: {{company}}
Audit date: {{auditdate}}
Lead auditor: {{auditor}}
Scope: {{scope}}
Criteria: {{criteria}}

#### Audit conclusion

**Body:** {{conclusion}}

#### Findings

**Table:**

**Columns:**

- Ref
- Type
- Description and evidence
- Corrective action due

**Rows:**

**0:** 1

**1:** Minor NC

**2:** {{f1}}

**3:** 30 days

**0:** 2

**1:** Minor NC

**2:** {{f2}}

**3:** 30 days

**0:** 3

**1:** Observation

**2:** {{obs}}

**3:** Consider

#### Positive practice

**Body:** {{good}}

#### Management Review Minutes (example, AS9100D clause 9.3)

**Body:** Date: {{mrdate}}
Attendees: {{mrattend}}

#### Inputs reviewed

**Table:**

**Columns:**

- Input
- Summary

**Rows:**

**0:** Status of actions from previous reviews

**1:** Previous actions reviewed; two closed, one carried forward

**0:** Changes in external and internal issues

**1:** New customer flow-down on counterfeit part prevention

**0:** Delivery and quality performance, customer satisfaction

**1:** {{otd}}

**0:** Audit results, nonconformities and corrective action

**1:** {{conclusion}}

**0:** Performance of external providers

**1:** {{ext}}

**0:** Risks and opportunities, resources

**1:** Resource gap flagged for machining capacity

#### Decisions and actions

**Body:** {{mrout}}

#### Approval

**Signatures:**

- Lead auditor
- Management representative
- Top management

**Notes:** This is a fictional example for training and template use. Replace every field with your own audit evidence. AS9100D requirements and your registrar or customer rules take precedence. Aerospace organizations typically include on-time delivery and quality performance in management review inputs.

## Content

**Intro:** People searching for an AS9100 audit report example usually want to see how findings, evidence and conclusions read when written properly. This page gives a filled internal audit report plus matching management review minutes that you can edit and export.

**Sections:**

#### How to use the example

**Body:** Read the filled defaults to see the level of detail an auditor should record, then overwrite each field with your own audit data. Export to PDF or Word and issue it through document control. A good report names the clause, states the requirement paraphrased, describes the evidence seen and is specific enough that someone else could find the same record.

#### What a good audit finding contains

**Body:** A defensible finding has three parts: the requirement (clause or procedure), the objective evidence (document, date, ID, record) and the statement of how the evidence fails the requirement. Classify it as a major nonconformity, minor nonconformity or observation using your own procedure. Avoid opinions and avoid naming people; cite records.

**Bullets:**

- Requirement: which clause or procedure step
- Evidence: record number, date, gauge or part ID
- Gap: the specific shortfall, not a general complaint
- Containment and corrective action owner with a due date

#### Management review under AS9100D

**Body:** Clause 9.3 requires top management to review the QMS at planned intervals. Inputs include status of earlier actions, changes in issues, performance and effectiveness information such as customer satisfaction, audit results, external provider performance, resources and risk actions. Aerospace organizations add on-time delivery and quality performance. Outputs are decisions on improvement, any QMS changes and resource needs, recorded as actions.

#### Common mistakes

**Body:** Reports that say procedures are not followed without citing a record are hard to close. Management reviews that recap the audit but record no decision fail the intent of the clause.

**Bullets:**

- No objective evidence in the finding
- Corrective action without root cause or due date
- Management review inputs missing delivery and external provider data

**Cta:** If your audit evidence sits in ERP, calibration and supplier systems, Netray can add a private AI layer on-premises so auditors can pull records quickly without sending data outside. Contact us for a walkthrough.

**Faq:**

#### What must an AS9100 internal audit report include?

**Answer:** At minimum the scope, criteria, auditor, date, findings with objective evidence, conclusions and follow-up actions. Your procedure should say who receives it and how findings are tracked to closure.

#### How is this different from the AS9100 internal audit report template?

**Answer:** This page is a filled example so you can see wording and level of detail, combined with a management review sample. Use it alongside a blank template for your own audits.

#### How often must management review happen?

**Answer:** At planned intervals defined by the organization. Annual is common, and many aerospace suppliers review more often to track delivery and quality performance.

#### Is this example acceptable to a registrar as is?

**Answer:** No. It is fictional and for guidance. Your own report must reflect your actual audit evidence and your registrar and customer requirements.

## Search terms

as9100 audit report example, as9100 management review example, as9100 internal audit report sample, as9100d management review minutes, as9100 audit findings example, aerospace internal audit report, as9100 nonconformance example, as9100 management review 9.3

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
