# AS9100D Gap Analysis Template with Scoring and Action Plan

> Source: https://netray.co/tools/as9100-gap-analysis-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

An editable gap analysis against AS9100D clauses. Score each requirement area, see your overall percentage and list actions with owners and dates.

## Category

aerospace-defense

## Industry

Aerospace

## Audience

- Quality manager
- Operations manager

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Clause

**Key:** clause

**Type:** text

#### Requirement area

**Key:** area

**Type:** text

#### Score (0 none, 1 partial, 2 full)

**Key:** score

**Type:** number

#### Weight (1 to 3)

**Key:** weight

**Type:** number

#### Weighted score

**Key:** points

**Type:** number

**Expr:** score * weight

#### Weighted gap

**Key:** gap

**Type:** number

**Expr:** (2 - score) * weight

#### Action to close

**Key:** action

**Type:** text

#### Owner

**Key:** owner

**Type:** text

#### Due date

**Key:** due

**Type:** date

**Rows:**

**Clause:** 4.4

**Area:** Process approach, process maps, risks, owners

**Score:** 1

**Weight:** 2

**Action:** Complete turtle diagrams for core processes

**Owner:** Quality manager

**Due:** 2026-12-15

**Clause:** 5.1.2

**Area:** Customer focus, on-time delivery and quality metrics

**Score:** 1

**Weight:** 3

**Action:** Set up OTD and OQD tracking by customer

**Owner:** Operations

**Due:** 2026-12-01

**Clause:** 6.1

**Area:** Risk and opportunity management, including operational risk

**Score:** 0

**Weight:** 3

**Action:** Create a risk register and review cycle

**Owner:** Quality manager

**Due:** 2026-12-10

**Clause:** 7.1.5

**Area:** Calibration, traceability, status labeling

**Score:** 2

**Weight:** 2

**Action:** None, keep annual review

**Owner:** Calibration lead

**Due:** 2027-01-15

**Clause:** 7.2

**Area:** Competence and training records

**Score:** 1

**Weight:** 2

**Action:** Add skills matrix and records for inspectors

**Owner:** HR

**Due:** 2026-12-20

**Clause:** 7.5

**Area:** Document and record control, retention

**Score:** 2

**Weight:** 2

**Action:** Check retention periods against contracts

**Owner:** Document control

**Due:** 2027-01-10

**Clause:** 8.1.1

**Area:** Operational risk, product safety, counterfeit parts prevention

**Score:** 0

**Weight:** 3

**Action:** Write product safety and counterfeit prevention procedures

**Owner:** Quality manager

**Due:** 2027-01-20

**Clause:** 8.1.2

**Area:** Configuration management

**Score:** 1

**Weight:** 3

**Action:** Define baseline control and change approval

**Owner:** Engineering

**Due:** 2027-01-31

**Clause:** 8.4

**Area:** External provider control and flow-down

**Score:** 1

**Weight:** 3

**Action:** Build approved supplier list with scoring

**Owner:** Purchasing

**Due:** 2026-12-30

**Clause:** 8.5.1

**Area:** Production control, FAI, special processes, key characteristics

**Score:** 1

**Weight:** 3

**Action:** Define FAI triggers and key characteristic control

**Owner:** Production manager

**Due:** 2027-01-31

**Clause:** 8.7

**Area:** Control of nonconforming outputs

**Score:** 2

**Weight:** 2

**Action:** Review disposition authority

**Owner:** Quality manager

**Due:** 2027-01-15

**Clause:** 9.2

**Area:** Internal audit program

**Score:** 0

**Weight:** 2

**Action:** Plan and perform first audit cycle

**Owner:** Quality manager

**Due:** 2027-02-15

**Clause:** 9.3

**Area:** Management review with required inputs

**Score:** 1

**Weight:** 2

**Action:** Add input list and decision records

**Owner:** General manager

**Due:** 2027-02-28

**Clause:** 10.2

**Area:** Corrective action with root cause

**Score:** 1

**Weight:** 3

**Action:** Adopt 8D or similar and check effectiveness

**Owner:** Quality manager

**Due:** 2027-01-15

**Totals:**

#### Weighted score

**Key:** points

**Agg:** sum

**Format:** integer

#### Weighted gap

**Key:** gap

**Agg:** sum

**Format:** integer

**Summary:**

#### Maximum weighted score

**Key:** max_points

**Expr:** sum_points + sum_gap

**Format:** integer

#### Overall compliance

**Key:** compliance

**Expr:** sum_points / (sum_points + sum_gap) * 100

**Format:** percent

**Primary:** true

**Description:** Weighted score divided by the maximum possible.

**Notes:** Rows summarize AS9100D areas, not the standard text. Add every clause relevant to your scope and customer requirements. Rows scoring 0 with weight 3 are your first actions.

## Content

**Intro:** A gap analysis shows how far your quality management system is from AS9100D and what to do first. Score each requirement area, weight the ones that matter most, and read your overall compliance percentage and action list.

**Sections:**

#### How to use the template

**Body:** Replace the sample rows with your own findings. Score each area 0 when nothing exists, 1 when it is partly done or not followed consistently, and 2 when it is documented, implemented and effective. Weight the areas 1 to 3 by risk to product and certification. The worksheet multiplies score by weight, totals the result, and calculates the weighted gap. Fill in action, owner and due date for each gap, then sort by gap to build your plan.

#### Reading the percentage

**Body:** Overall compliance is the weighted score divided by the maximum possible. A first pass often lands well below full compliance, and that is normal. The aim is a prioritized plan, not a pass mark. Use it with the AS9100D clause structure: if you already hold ISO 9001 certification, most of clauses 4 to 10 are in place and the gap concentrates in the aerospace additions.

**Bullets:**

- Product safety and counterfeit parts prevention
- Configuration management
- Key characteristics and first article inspection
- On-time delivery and quality performance monitoring
- Supplier flow-down and external provider control

#### Turning the gap into a plan

**Body:** Group actions by owner and by time. Quick wins such as updating forms can finish in weeks, while systems work such as configuration management or supplier scoring needs months. Schedule an internal audit and management review before the certification body's stage audits, and keep records that show the system operating for a period, since auditors look for implementation rather than paperwork.

#### Common mistakes

**Body:** Teams score what is written instead of what is practiced, skip the aerospace-specific areas, or fix documents without training staff. Another trap is a single person doing the whole analysis. Include process owners so scores reflect reality, and repeat the analysis after major actions close.

**Cta:** Netray can add a private AI layer to your ERP and quality data, so on-time delivery, nonconformance and supplier metrics for AS9100 come from live data on-prem rather than manual spreadsheets.

**Faq:**

#### What is an AS9100 gap analysis?

**Answer:** A structured comparison of your current QMS and practices with AS9100D requirements, showing which areas meet the standard, which partly do and which are missing, so you can plan the work before certification.

#### How is AS9100D different from ISO 9001?

**Answer:** AS9100D contains ISO 9001 and adds aerospace, space and defense requirements such as product safety, counterfeit parts, configuration management, FAI, special processes and on-time delivery monitoring.

#### How long does it take to close the gaps?

**Answer:** It depends on starting point. A plant with ISO 9001 often needs several months to add the aerospace elements and build records. A site with no QMS should plan for a year or more.

#### Should I do the gap analysis myself?

**Answer:** You can, with process owners. An independent review by an experienced auditor or consultant often finds gaps that insiders miss. Either way, use evidence not opinion when scoring.